Detailed Estimate of Survey Work For The Construction of Road From Salam Abad To Gohalan (RD 5700 To RD 11700M)
Detailed Estimate of Survey Work For The Construction of Road From Salam Abad To Gohalan (RD 5700 To RD 11700M)
Item
Unit
Quantity
Rate
Amount
No
3.00
173.20
519.60
No
2.40
173.20
415.68
No
6.00
173.20
1039.20
No
40.00
173.20
6928.00
No
4.80
173.20
831.36
No
45.00
173.20
7794.00
No
16.00
173.20
2771.20
No
12.00
173.20
2078.40
No
6.00
173.20
1039.20
10
No
408.00
12.00
4896.00
11
lit
3.00
150.00
450.00
12
LS
400.00
400.00
TOTAL
29162.64
NOTE:The survey estimate has been frammed on the basis of sanctioned schedule of rates
for survey by design directorate J&K,and the rates envisaged in the estimate from PMGSY
sanctioned shedule of labour.
NOTE:The survey estimate has been frammed on the basis of sanctioned schedule of rates
for survey by design directorate J&K,and the rates envisaged in the estimate from PMGSY
sanctioned shedule of labour.