Amps X 100 BB-1A (Nom. kV=220, Plot Ref.

kV=220)
.5

10

30

50

100

300

500

1K

3K

5K

1K

10K
1K

500

500

300

300

100

100

50

50

30

30

D12-RP - P
OC1
220kV Bus Coupler
ABB
REF 615
CT Ratio 3000:1
IEC - Normal Inverse
Pickup = 1.2 (0.3 - 5 xCT Sec)
Time Dial = 0.49
3x = 3.09 s, 5x = 2.1 s, 8x = 1.62 s

10

D05-RP - P
OC1

.5

.5

120MVA Transformer Feeder


ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 0.8 (0.3 - 5 xCT Sec)
Time Dial = 0.31
3x = 1.95 s, 5x = 1.33 s, 8x = 1.02 s

.3

.1

.3

.1

.05

.05

.03

.03

.01
.5

10

30

50

100

300

500

1K

3K

Amps X 100 BB-1A (Nom. kV=220, Plot Ref. kV=220)


N7733 ZAKHER GRID
Project:
Location:
Contract:
Engineer:
Filename:

220/33/11kV Zakher Grid


Zakher Area of Al Ain
N7733
JM
C:\ETAP 1250\N7733\N7733.OTI

CASE-1.1
Date:
SN:
Rev:
Fault:
Circuit:

18-01-2016
LARSENTRN2
Base
Phase
120MVA T/F , 220kV B/C

5K

.01
10K

ETAP Star 12.5.0C

Seconds

Seconds