Professional Documents
Culture Documents
Contractors involved included RIG Installations who provided labour to remove and re-install the embedded angle in preparation for Robert Guy & Sons to cut a deep
section of concrete from the existing abutment.
This avoided an
Easter break with
only the outgoing
weighbridge in operation, which would
have required temporary manning to
manage traffic.