JAZAN REFINERY AND TERMINAL PROJECT

TR PROJECT NO. 02220

UNIT: J20 HCK

PURCHASE ORDER NUMBER : 0222001010

EQUIPMENT: J20-D-1107; J20-D-2107

REVIEW RESPONSE BY CONTRACTOR:


Purchaser review and comments do not indicate either responsibility or liability for accuracy and completeness of this document or alter any contractual terms and
conditions:
REJECTED

REVIEWED WITH
COMMENTS

REVIEWED WITHOUT COMMENTS

COMMENTS
AS NOTED

REVIEWED AS
BUILT

FOR INFORMATION
DATE:

12/JUNE/2014

TITLE: J20-D-1107/2107 Process data sheet

JAZAN

SAUDI ARABIA

VENDOR IDENTIFICATION:
SUBVENDOR IDENTIFICATION:

TR-Tecnical
Vendor ID: 10029031
Plant ID: 30006786

Not Applicable

VENDOR DOCUMENT NUMBER: 3999-J20-SGP-PRCSS-002

REVISION: 00

VDDR Code: HDD-0001

NMR Code: 602

TRJ DOCUMENT NUMBER:

V-02220-J20-D-1107-0001

REVISION: A

note 1: Please complete, if not required , indicated not required.

Sheet 2 of 2

VESSEL
PROCESS DATA SHEET
REV.

00

DATE

16-may-14

JOB N

DONE

JAZAN REFINERY PROJECT (T-2220)


HYDROCRACKER PLANT (J20)

RMC

CLIENT

SAUDI ARABIAN OIL COMPANY

CHECKD

RAN

LOCATION

JAZAN

APPRVD

JMM

DOC N

3999-J20-SGP-PRCSS-002

REV

UNIT

Item N:

Service:

Fluid:

Volume:

0,58

Diameter (ID)

600

Horizontal / Vertical

Demister

Quantity

J20-D-1107/2107

CONTINOUS BLOWDOWN DRUM


CONDENSATE/LP STEAM
m3
mm

Length.(T-T)

1860

mm

VERTICAL
P

Thickness

bar

mm

Pressure (bar g)

9
10

Temperature (C)

Operating

Design

Operating

Design

5,2

12.0/FV

160,2

240

11

Shell

12

Jacket

13

Coil

14
MATERIAL

15

CORR. ALLOW.

16

Shell

CS

3,2

17

Heads

CS

3,2

18

Jacket

mm

19

Coil

mm

20

Demister

mm

21

Internal liner:

22

Head type:

BY VENDOR

23

Code:

ASME VIII Div. 1

24

Liquid height:

25

Specific gravity:

26

Steam Out conditions:

27

Stress relieve for process reasons

28

Minimum elevation (BTL to grade)

29

Insulation

30

Radiograph

NOTE 1

Type:

mm
mm

Thickness: NOTE 1

mm

NOTE 1

550

mm

0,907

160,2

bar g

C
C

Heat cons.

Thickness:

mm
65

mm

Nozzles

31
32

Quantity

Size

Service

33

N1

2"

STEAM/LIQUID INLET (3)

34

N2

2"

STEAM OUTLET

35

N3

2"

CONDENSATE OUTLET (1)

36

N4

HOLD

PZV CONNECTION

37

N5

2"

VENT

vessel bottom. Vortex breaker to be defined by vendor.

38

N6

2"

DRAIN

(2) To be defined/confirmed by instrument department. Please confirm

39

N7 A/B

2" (2)

LG

40

N8 A/B

2" (2)

LT

(4) Continuous Blowdown drum shall have a condensate hold-up time of

41

M1

I.D. 600mm

MANWAY

5 minutes between Low Liquid Level (LLL) and High Liquid Level (HLL).

NOTES
(1) Vortex breaker shall be installed at a minimum of 150mm above from

(3) Nozzles provided with 90 short radius elbow pointing toward the bottom.

42

(5) Suport leg to be provided (height to be definined by vessel

43

department)

44
45
46
47
48
49