Franklin B identified a low risk in a call setup test to verify corrections to fix the C7GSC command. To prevent the risk, Franklin B will implement a fallback procedure by the 18th of May 2009 to remove the correction if needed. The risk plan was updated on the 18th of May 2009 and signed by the project manager Franklin B.
Franklin B identified a low risk in a call setup test to verify corrections to fix the C7GSC command. To prevent the risk, Franklin B will implement a fallback procedure by the 18th of May 2009 to remove the correction if needed. The risk plan was updated on the 18th of May 2009 and signed by the project manager Franklin B.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Franklin B identified a low risk in a call setup test to verify corrections to fix the C7GSC command. To prevent the risk, Franklin B will implement a fallback procedure by the 18th of May 2009 to remove the correction if needed. The risk plan was updated on the 18th of May 2009 and signed by the project manager Franklin B.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Risk Preventative action Risk Contingency Action Risk Risk CATEGORY Responsible Action Responsible ID Description Date Description Date averted person Implemented Person FallBack Procedure. Franklin B 001 Low call setup test to verify Franklin B 18th may 2009 18th May (remove correction)
RISK PLAN UPDATE REGISTER
DATE PROJECT MANAGER NAME PROJECT MANAGER SIGNATURE