Objective :
The objective of this manual is to prepare the WTP modules ( Flocculators - Clarifiers
Sand Filters ) for operation.
CAIROMATIC
CAPW
OWNER
MISR CONSULT
CONSULTANT
ARAB CONTRACTORS
PROJECT
TITLE
SHEET
OF
REV.
DATE
03
06
00
Apr-16
RawWaterTank
Flocculator
Clarifier
Filters
BackwashTank
SludgeHolding Tank
TreatedWaterTank
CAIROMATIC
CAPW
OWNER
MISR CONSULT
CONSULTANT
ARAB CONTRACTORS
PROJECT
TITLE
SHEET
OF
REV.
DATE
04
06
00
Apr-16
Open
Module2
Flocculator
Close
Module3
Flocculator
Close
Modulesinletheader
- Since there is no treated water produced yet, chemical additions shall be manual
inside the flash mixing tank.
Modulein
Startup
Flocculator
Chlorine
Alum
CAIROMATIC
CAPW
OWNER
MISR CONSULT
CONSULTANT
ARAB CONTRACTORS
PROJECT
TITLE
SHEET
OF
REV.
DATE
05
06
00
Apr-16
FilterTank
SludgeHolding Tank
AirBlower
Backwash
Pump
BackwashTank