You are on page 1of 2

E&I QUALITY CONTROL

Report :
System / Sub
System
:
Discipline:
Area / Unit :
Doc. No.: IQ347-300-ELCHL-00054

Page : 1 of
2

Date:

Rev.:
00A

CHECKLIST OF 132 kV AIS SWITCHYARD EQUIPMENT INSTALLATION


1. General
Equipment
Description :

Manufacturer:

Reference Document Number

Revision Number

2. Checklist
Num
.

Description

Accept

1.

Verif Equipment has been installed correct


position

2.

Verify there is no damage on the equipment

3.

Check the alignment and leveling of


equipment

4.

Check the torque of bolted connection (if


applicable)

5.

Verify installation has been completed


according to drawings

Reject

N/A

Remarks

3. Comments

Subcontractor QC's
Representative

Contractor's QC Representative

Page 1

Owner's Representative

E&I QUALITY CONTROL

Erbil CCPP Project


Report : QC-ELT-002

Tag :
System / Sub
System
Drawing: :
Area / Unit :
Contract :

(Name, Signature, Date)

REFER TO LIST
01LC
NA
CONDENSATE BUILDING
ECCPP
(Name, Signature, Date)

Page 2 of 2

Report : 00480
Discipline:QC-IN
Date:06.04.2014
Revision: 000
Page : 2 of 2
(Name, Signature, Date)

You might also like