Professional Documents
Culture Documents
IN NAVAL ARCHITECTURE
AND MARINE ENGINEERING)
( )
... .
22 2546
Contents
Page
A (ABAFT AUXILIARY MACHINERY AUXILIARIES) 4-5
B (BALE CUBIC BUTTOCK)
6-9
10
D (DEADRISE DUNNAGE)
11-13
14
15-17
18-19
20
I (INTERCOSTAL)
21
J()
K (KEEL KNUCKLE LINE)
22
23
24-25
26
O (OFFSETS)
27
28
Q (QUARTERS)
29
R (RAKE RUN)
30-31
32-36
37-39
U (UPTAKE)
40
41
42
3
Page
X()
Y()
Z()
REFERENCES
44
A
ABAFT
AFT
,
AFTERBODY
( F0REBODY)
AFTER PEAK
(LOAD LINE)
RUDDER POST RUDDER STOCK RUDDER
POST
AIR PIPE
..
AIR LOCKS
.. (F.O DAY TANK)
(GOOSENECK)
AIR PORT
DECKHOUSE
AMIDSHIPS
APPENDAGES
, ,
ATHWARTSHIP
-
AUXILIARY MACHINERY AUXILIARIES
-------------------------------------------------------------------------------------------------------------------------------------------------------------
B
BALE CUBIC
CARGO BATTENS
BALLAST
-
BASE LINE
- - CENTERLINE
(C.L) MBL (MOULDED BASELINE)
BEAM
1. (BREADTH)
2. (DECK BEAM),
BEAM KNEE
,
BETWEEN DECKS (TWEEN DECKS)
(SPACE)
BILGE
()
BILGE WATER
BILGE KEEL
BITT
-
BOLLARD (SINGLE & DOUBLE
BOLLARD)
BLOCK COEFFICIENT
(RECTANGULAR BLOCK)
BODY PLAN
()
BODY
PLAN LINES DRAWING
BOLLARD
-
BITT
BOLLARD PULL
()
TOWING HOOK
BONJEAN CURVES
()
CARGO
BOOM
BOW ()
-
1. STRAIGHT
VERTICAL BOW
2. 70 RAKED
BOW
3. MAIERFORM RAKED
MAIERFORM
4. CLIPPER RAKED
5.
PASSENGER LINER
CUTTER CLIPPER
RAM
BULBOUS BOW
BRACKET
2
DECK BEAM FRAME, BULKHEAD STIFFENER TANK TOP
DECK BRIDGE HOUSE
UPPER DECK SUPERSTRUCTURE DECK
BULK CARGO
, ,
BULKHEAD (BHD)
FORE-PEAK BHD OR COLLISION BHD, AFT PEAK BHD, HOLD BHD,
TWEEN DECK BHD, ENGINE ROOM BHD, SUPERSTRUCTURE END BHD,
LONGITUDINAL BHD, TRANSVERSE BHD, OILTIGHT BHD, WATERTIGHT
BHD GASTIGHT BHD
BULKHEAD DECK
BULKHEAD RECESS
BULWARK
SHEER STRAKE
BUOY ()
BUOYANCY
,
BUTTOCK
-------------------------------------------------------------------------------------------------------------------------------------------------------------
10
C
CAMBER
()
ROUND OF BEAM 1/50
CB (B)
CENTER OF BUOYANCY
CG (G)
CENTER OF GRAVITY
CB
COFFERDAM (C/D)
FLOORS
COLLISION BULKHEAD
FREEBOARD DECK
-------------------------------------------------------------------------------------------------------------------------------------------------------------
11
D
DEADRISE
CARGO, F.O, L.O, F.W, STORE, CREW PASSENGERS, BAGGAGE
PROVISION
DECK
SUPERSTRUCTURE DECK 0.15L
STRENGTH DECK
1b.) EFFECTIVE DECK STRENGTH DECK
EFFECTIVE DECK
2.)
2a.) UPPER DECK
12
BRIDGE DECK POOP DECK, DECKHOUSE
DECKHOUSE
SUPER-STRUCTURE
DEEP TANKS
TANK TOP
(HATCH) ..,
DERRICK (-)
CRANE - BOOM
-
(GUY ) BOOM
DISPLACEMENT, LIGHT
LIGHT WEIGHT LIGHT SHIP
DISPLACEMENT, LOADED
-
LIGHT SHIP DEADWEIGHT DOUBLE BOTTOM
INNER BOTTOM SHELL PLATING
,
13
DRAUGHT, DRAFT
3
1. EXTREME DRAFT
2. FORWARD DRAFT
3. (STERN) AFTER
DRAFT AFT DRAFT
- MEAN DRAFT
LOAD DRAFT
DRAFT MARKS
10 .
DUNNAGE
-------------------------------------------------------------------------------------------------------------------------------------------------------------
14
E
ENDS
0.1L
ENTRANCE
-------------------------------------------------------------------------------------------------------------------------------------------------------------
15
F
FATHOM
- 6 (1.8288 )
FENDER
-
FOREBODY
FLARE ()
FLOODABLE LENGTH (FL)
SAFETY OR MARGIN LINE
FL
1/4
FLOOR
- BILGE
1. WATERTIGHT FLOOR
TANK TOP
2. SOLID FLOOR
3.
4.
OPEN FLOOR TANK TOP
BRACKET FLOOR BRACKET VERTICAL KEEL
BILGE
16
FORE
,
FORE SHEER (SF)
FORECASTLE (FOCSLE)
UPPER DECK
FOREPEAK
COLLISION BHD
(LOAD LINE)
FRAME
FRAME SPACE
CLASS
FREEBOARD
FREEBOARD DECK
FREEING PORT
BULWARK
230 .
17
WILLIAM FROUDE
FROUDE NUMBER
(Fn)
Fn = v/SQRT(gL)
Fn : FROUDE NUMBER
v : , m/s
g : ACCELERATION DUE TO GRAVITY, m/s2
L : , m
FUNNEL, SMOKESTACK
-------------------------------------------------------------------------------------------------------------------------------------------------------------
18
G
GANGWAY
-
GARBOARD STRAKE
GIRDER
-
GIRDER, DECK
DECK GIRDER
(DECK BEAM) (PILLAR) GIRDER
DECK GIRDER HATCH END
GIRTH
GIRTH LENGTH
(TRANSVERSE SECTION)
(GUNNEL = GUNWALE)
GRAIN CUBIC
GRAVING DOCK
-
DRYDOCK
--
(KEEL BLOCKS)
(SIDE
SHORES)
19
- (OFFICIAL)
100 .. (2.83 ..) 1
.. 1969
INTERNATIONAL CONVENTION ON TONNAGE MEASUREMENT OF
SHIPS, 1969 GT
(ENCLOSED SPACES) GT
-------------------------------------------------------------------------------------------------------------------------------------------------------------
20
H
HATCH (HATCHWAY)
-
HEEL
(INCLINATION, LIST)
HOLDS
,
HULL
-------------------------------------------------------------------------------------------------------------------------------------------------------------
21
I
INTERCOSTAL
-------------------------------------------------------------------------------------------------------------------------------------------------------------
22
J
K
KEEL
-
(FLOORS OR BOTTOM TRANSVERSES)
KNOT
, (1 = 1,852 )
KNUCKLE LINE
-------------------------------------------------------------------------------------------------------------------------------------------------------------
23
L
LENGTH, OVERALL
LENGTH BETWEEN PERPENDICULARS
,
(SUMMER LOAD WATERLINE)
(RUDDER POST OR STERNPOST)
(CENTERLINE OF THE RUDDER STOCK)
LIST
, CENTERLINE PLANE
(HEEL)
LOAD WATERLINE
LONGITUDINALS
-------------------------------------------------------------------------------------------------------------------------------------------------------------
24
M
MANHOLE
MARITIME INDUSTRY
()
-
-
-
METACENTER (M)
METACENTER (M) CG ( G) GM
G M (STABLE)
G M (UNSTABLE)
METACENTRIC RADIUS (BM)
, AMIDSHIPS
25
MIDSHIP SECTION
(SCANTLINGS)
MILE, NAUTICAL
,
1 6080
1 (Minute)
= 40,029/ /2
= 6,371
MOLDED LINES
-------------------------------------------------------------------------------------------------------------------------------------------------------------
26
N
NAVAL POWER
NET TONNAGE (NT)
- INTERNATIONAL CONVENTION ON
TONNAGE MEASUREMENT OF SHIPS, 1969. NET
TONNAGE ,
, GT
-------------------------------------------------------------------------------------------------------------------------------------------------------------
27
O
OFFSETS
-------------------------------------------------------------------------------------------------------------------------------------------------------------
28
P
PARARELL MIDDLE BODY
LOWER DECK
POOP
PORT SIDE
STARBOARD SIDE
-------------------------------------------------------------------------------------------------------------------------------------------------------------
29
Q
QUARTERS
-------------------------------------------------------------------------------------------------------------------------------------------------------------
30
R
RAKE
- ,
REEFER
REFRIGERATOR
REFRIGERATED
RIDER PLATE
GIRDER
RISE OF FLOOR
DEADRISE
ROUND OF BEAM
CAMBER
RUDDER
-
RUDDER POST, STERNPOST
STERN FRAME
RUDDER STOCK
STEERING ENGINE
31
RUDDER STOP
() -
35
RUDDER STOP 37
RUN
-------------------------------------------------------------------------------------------------------------------------------------------------------------
32
S
SAGGING
(),
SCANTLINGS
SCANTLINGS DRAFT
SCUPPERS
SCUTTLE
SEA CHEST
STRAINER PLATE
(COOLING),
SEA POWER
-
(MARITIME INDUSTRY + NAVAL POWER)
SHAFT TUNNEL, SHAFT ALLEY
33
SHEER
VERTICAL PLANE
SHEER
SHEER STRAKE
SHELL EXPANSION
SHELTER DECK
- GROSS
TONNAGE (GT)
GT
GT
SHELTER DECK GT
SHELTER DECK FREEBOARD DECK
SHELTER DECK WEATHERTIGHT
SHELTER DECK
TONNAGE OPENING
34
SKEG
SKYLIGHT
SLAMMING
SOUNDING TUBE
,
STABILITY
-
STACK
- (UPTAKE)
(AIR SPACE) RADIATION
(DRAFT)
(ELLIPSE)
FUNNEL, SMOKE PIPE
SMOKESTACK
35
STANCHION
- ,
PILLAR
STANCHION, RAIL
RAIL STANCHION -
STARBOARD SIDE
, PORT SIDE
STEERING GEAR
- , ,
STEM
STERN
STERN FRAME
STERN TUBE
(TAILSHAFT)
STIFFENER
T
STOWAGE FACTOR
36
STRAKE
,
STRENGTH DECK
-
(LONGITUDINAL
BENDING)
STRINGER
GIRDER (FORE-AND-AFT)
STRINGER PLATE
- DECK
STRINGER
STRUT
(V)
SUPPERSTRUCTURES
FREEBOARD DECK
(SIDE WALL) 0.04B
SUPPERSTRUCTURE
SWASH BULKHEAD
-------------------------------------------------------------------------------------------------------------------------------------------------------------
37
T
TAILSHAFT
TANK, SETTING
.. -
TANK, TRIMMING
TANK TOP
- (DOUBLE BOTTOM)
INNER BOTTOM
TEMPLATE
()
TENDER
(SHAFT
TUNNEL) THRUST SHAFT THRUST BEARING
TONNAGE MARK
-
380 . 25 . 300 .
38
TOPSIDE TANK
- WEATHER DECK
BULK CARRIER GM
GM
(PROPPELLER RACING)
TRAMP SHIP
TRANSOM
TRANSOM BEAM
CANT BEAM
TRANSOM FRAME
CANT BEAM
TRANSVERSE
(DEEP) ,
-
TRIM
(TRIM
BY THE HEAD)
(TRIM BY THE STERN)
, ,
-
TRIPPING BRACKET
39
TRUNK
TUMBLE HOME
TWEEN DECK
- BETWEEN DECK
TWIST LOCK
-------------------------------------------------------------------------------------------------------------------------------------------------------------
40
U
UPTAKE
-------------------------------------------------------------------------------------------------------------------------------------------------------------
41
V
VANG
GUY ()
VENTILATOR, COWL
VLCC TANKER
-------------------------------------------------------------------------------------------------------------------------------------------------------------
42
W
WATER BALLAST
,
DEEP TANK
,
WATERLINE
, HORIZONTAL PLANE
WATERWAY
-
WEATHER DECK
-
WEB FRAME
WEB PLATE RIDER PLATE 4, 5 6
WELL
BILGE WELL, DRAINAGE WELL POCKET WELL
WINCH
WINDLASS
-------------------------------------------------------------------------------------------------------------------------------------------------------------
43
X
Y
Z
-
The End
-------------------------------------------------------------------------------------------------------------------------------------------------------------
44
REFERENCES
1) Robert Taggart, Ship Design and Construction, 1980, The Society of Naval
Architects and Marine Engineers.
2) RENE de KERCHOVE, International Maritime Dictionary, Second Edition,
1961, D. Van Nostrand Company, Inc. New York.
3) Nippon Kaiji Kyokai, Outline of Ships Hull Part, May 2001.