Page 46 of 48
Desciplines
A0
Architectural
Structural
Plumbing
Drainage
Electrical
Mechanical
Fire Service
Sum
Total
No.
A0
Description
Quantity
A0-2/103
Unit
Unit Price
Sum
No.
Description
Quantity
A0-3/103
Unit
Unit Price
Sum
No.
Description
Quantity
Unit
A0.2
A0.3
A0.4
A0-4/103
Item
900
SQM
Item
Item
Unit Price
Sum
No.
A0.5
A0.6
Description
Quantity
Unit
Unit Price
Termite treatment.
Item
110
SQM
Sub-total:
A0-5/103
MOP
Sum
No.
Catogories
SumMOP
Architecture
A1
Architectural Metal
A2
Carpentry
A3
A4
A5
A6
A7
Misc
Sub-total
A1
Quantity
Architectural Metal
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional necessary for
performance
of
the
work.
All systems and model numbers called out are
referecens to establish the standard of quality
and appearance ONLY. All material or product
with equipvalent quality shall be regarded as
acceptable.
Fit and shop assemble components in largest
practical sizes for delivery to site.
A1.1
A1-7/103
Unit
Unit Price
Sum
Quantity
Unit
Unit Price
A1.1.1
22.50
A1.1.2
22.50
A1.1.3
12.50
A1.1.4
12.50
A1.1.5
12.50
A1.2
A1.2.1
3.20
SQM
A1.2.2
3.20
SQM
A1.2.3
3.20
SQM
A1.3
1.00
SET
Sub-total:
A1-8/103
MOP
Sum
A2
Quantity
Carpentry
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
All systems and model numbers called out are
referecens to establish the standard of quality
and appearance ONLY. All material or product
with equipvalent quality shall be regarded as
acceptable.
Fire Retardant Treatment: All lumber and
plywood used on the Work, unless otherwise
specified, shall comply with AWPA standards
for pressure impregnation with fire-retardant
chemicals to achieve flame-spread rating of
not more than 25 in accordance with ASTM
E84 and D2898, or UL Test 723.
Complete fabrication of treated items prior to
treatment, wherever possible
Fabricate all casework with plywood, unless
otherwise noted.
Refer to Specification Section 064100 for
casework and casework hardware
specifications.
Refer to Specification Section 066116 for solid
acrylic polymer surfacing specifications.
Conduct termite treatments for all lumbers anf
plywoods transferred to the work site.
A2-9/103
Unit
Unit Price
Sum
Quantity
Unit
A2.1
A2.1.1
3.50
A2.1.2
3.00
A2.1.3
3.00
A2.2
A2.2.1
5.00
A2-10/103
Unit Price
Sum
Quantity
Unit
A2.3
A2.3.1
3.50
A2.3.2
3.00
A2.3.3
3.00
A2.4
A2.4.1
3.80
A2.4.2
3.30
A2.4.3
3.30
A2-11/103
Unit Price
Sum
A2.5
Quantity
3.00
Unit
Sub-total:
A2-12/103
Unit Price
Ea
MOP
Sum
A3
Quantity
Unit
A3.1
A3.1.1
Waterproofing membrane
Supply and install Type1 Rubberized asphalt
sheet waterproofing for vertical surfaces.
GRACE CONSTRUCTION Bituthene 3000
system or equipvalent, including prefabricated
vertical drainage composite, GRACE
CONSTRUCTION Hydroduct 220 or
equipvalent, including all materials,
equipment, labor and all preparation work and
additional necessary for performance of the
work.
2200.00
A3-13/103
SQM
Unit Price
Sum
Quantity
Unit
A3.1.2
9000.00
SQM
A3.1.3
900.00
SQM
A3.1.4
30.00
sqm
A3.1.5
13050.00
SQM
A3.1.6
120.00
SQM
A3-14/103
Unit Price
Sum
Quantity
A3.1.7
A3.2
Insulation
A3.2.1
Unit
30.00
SQM
1800.00
SQM
A3.2.2
900.00
SQM
A3.2.3
2000.00
SQM
A3-15/103
Unit Price
Sum
Quantity
Unit
900.00
SQM
8050.00
SQM
8050.00
SQM
A3.3.1
5000.00
SQM
A3.4
Joint Sealant
A3.4.1
400.00
A3.2.4
A3.2.5
A3.3
A3.3.1
A3-16/103
Unit Price
Sum
Quantity
Unit
A3.4.2
1000.00
1000.00
200.00
A3.4.3
A3.4.4
A3-17/103
Unit Price
Sum
A3.4.5
Quantity
Unit
30.00
400.00
Unit Price
Use: Countertops.
A3.4.6
A3.5
FIREPROOFING
All fireproofing material shall be free of
asbestos and mineral wool fiber
Fire-resistance rating of assemblies in
accordance with ASTM E119.
Frame-spread and smoke development rating
for materials in accordance with ASTM E84.
Fire hour rating shall be based on the design
critieria prescribed by currently Macau Fire
Code, NFPA 409, NFPA 220 and NFPA 101
standards.
A3.5.1
2700.00
SQM
A3.5.2
9000.00
SQM
A3.5.3
1.00
ITEM
Sub-total:
A3-18/103
MOP
Sum
A4
Quantity
A4-19/103
Unit
Unit Price
Sum
Quantity
Unit
A4.1
A4.1.1
900x2100mm (7A)
A4.1.2
11.00
Leaf
3.00
Leaf
A4.1.3
8.00
Leaf
A4.1.3
900x2100mm,
with
horizontal
thickness hairline finish stainless
facing panel as shown; with type 3
half glass panel, with panic hardware
1.00
Leaf
2mm
steel
glass
(15A)
A4-20/103
Unit Price
Sum
Quantity
Unit
A4.2
A4.2.1
12.00
Pair
A4.2.2
7.00
Pair
A4.3
A4.3.1
12.00
Leaf
A4-21/103
Unit Price
Sum
Quantity
Unit
A4.4
A4.4.1
2.00
Pair
A4.4.2
1.00
Leaf
A4.5
A4.5.1
6.00
Pair
A4-22/103
Unit Price
Sum
Quantity
A4.6
A4.6.1
A4.6.2
A4-23/103
Unit
11.00
Leaf
1.00
Leaf
Unit Price
Sum
Quantity
Unit
A4.7
A4.7.1
1800x2400mm (10C)
6.00
Pair
A4.7.2
1.00
Pair
A4.8
A4.8.1
1.00
Pair
A4-24/103
Unit Price
Sum
Quantity
A4.9
A4.10
Leaf
410.00
SQM
Unit
2.00
LOUVER
A4-25/103
Unit Price
Sum
Quantity
Unit
1,800.00
SQM
120.00
SQM
1.00
A4.12
ACCESS DOOR
A4-26/103
EA
Unit Price
Sum
Quantity
Unit
1.00
Pair
2.00
Pail
A4-27/103
Unit Price
Sum
Quantity
2.00
Unit
10
nos.
Ea.
Ea.
A4.13
A4.14
Sub-total:
A4-28/103
Unit Price
Leaf
MOP
Sum
A5
Quantity
Unit
Unit Price
A5.1
A5.1.1
A5.1.1.1 basement
2500.00
SQM
100.00
SQM
765.00
SQM
765.00
SQM
860.00
SQM
8535.30
SQM
A5.1.2
Subtotal:
A5-29/103
MOP
Sum
A5.2
Quantity
Raised Floor
Supply and install heavy duty cememtitiou
infill raisd floor system. TATE, TOPTECH,
FLEXIBLE SPACE SYSTEMS, or MATRIX
raised floor, TATE Concore 3000 or
equipvalent, 600x600mm stringerbolt system.
Finished with electrostatic dissipative epoxy
coating system. Installed in equipment rooms.
50
Unit
SQM
Subtotal:
A5.3
Floor finishes
A5.3.1
50.00
SQM
40.00
SQM
40.00
SQM
8535.30
SQM
A5.3.2
A5.3.2
A5-30/103
Unit Price
MOP
Sum
Quantity
Unit
32.60
SQM
150.00
SQM
150.00
SQM
3.00
SQM
2400.00
1300.00
SQM
SQM
Subtotal:
A5.4
Plaster work
Work shall include bond agent, undercoat and
final coat.
Under coat: cement: portland cement; Lime:
sand mix: ready-mixed to BS 4721, using
sand to BS 1199, type A. Mix proportions:
1:1:6. Thickness: 10mm at walls and 5mm at
soffits.
A5-31/103
Unit Price
MOP
Sum
Quantity
Unit
Unit Price
Finish: Smooth
A5.4.1
2080.00
SQM
A5.4.1
1200.00
SQM
Subtotal:
A5.5
Wall Finishes
A5.5.1
200.00
SQM
200.00
SQM
200.00
SQM
1400.00
SQM
A5.5.2
Subtotal:
A5-32/103
MOP
MOP
Sum
A5.6
Quantity
Unit
Drywall
Level of finish: Level 5 by GA214
Apply manufacturer's standard joint filler and
skim coat prior to accept painting.
Fire resistive rating and number of drywall
layer per drawings and applicable code
requirements
Provide metal stud framing, bracing, bridging
as required;
A5.6.1
A5.6.1.1 Basement
375.70
SQM
9825.00
SQM
1989.00
SQM
1969.60
SQM
2085.00
SQM
385.00
SQM
225.00
SQM
225.00
SQM
A5.6.2
A5-33/103
Unit Price
Sum
Quantity
Unit
A5.6.4
5000.00
SQM
A5.6.5
7040.00
SQM
A5.6.6
5000.00
SQM
Subtotal:
A5.7
Wall Paint
A5.7.1
12000.00
Ceiling Finishes
A5.8.1
80.00
SQM
40.00
SQM
A5-34/103
MOP
SQM
Subtotal:
A5.8
Unit Price
MOP
Sum
Quantity
Unit
40.00
SQM
40.00
SQM
40.00
SQM
40.00
SQM
A5.8.3
16.00
SQM
A5.8.2
Subtotal:
A5.9
Ceiling Paint
A5.9.1
3500.00
A5-35/103
MOP
SQM
Subtotal:
A5.10
Unit Price
MOP
Sum
Quantity
2.00
Unit
Subtotal:
Sub-total:
A5-36/103
Unit Price
Set
MOP
MOP
Sum
A6
Quantity
A6-37/103
Unit
Unit Price
Sum
Quantity
Unit
A6.1
SET
A6.2
18
SET
A6.3
12
SET
A6.4
SET
A6.5
A6.5.1
15
SET
A6.5.2
SET
A6-38/103
Unit Price
Sum
Quantity
Unit
SET
SET
A6.6.3
SET
A6.6.4
SET
A6.6.5
SET
A6.6.6
SET
A6.6.7
SET
A6.6.8
SET
A6.6.9
SET
SET
A6.5.3
A6.6
Toilet Accessories
A6.6.1
A6.6.2
A6.6.10 Furnish and install towel bar, Bobrick B-53018 or accepted equal. (TB)
A6-39/103
Unit Price
Sum
Quantity
Unit
A6.6.11 Furnish and install shower seat. Bobrick B517/518 or accepted equal. (SS)
SET
SET
UNIT
SET
SET
SET
SET
SET
12
Ea
Ea
22
Ea
Ea
Ea
A6-40/103
Unit Price
Sum
Quantity
Unit
Ea
12
Ea
Ea
A6.7.2
Ea
A6.7
Toilet Compartment
A6.7.1
A6.7.1.1 1500mm(L)x900mm(W)x2400mm(H),
including (1) 600mm width door
Sub-total:
A6-41/103
Unit Price
MOP
Sum
Quantity
Unit
Misc
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
All systems and model numbers called out are
referecens to establish the standard of quality
and appearance ONLY. All material or product
with equipvalent quality shall be regarded as
acceptable.
1
ITEM
Ea
Ea
A7.1
A.7.2
Signage
Unless otherwise noted. Plaque Size and
Symbol: To be determined by Owner. Letter
style and size to be determined by Owner.
Braille: Stainless steel pin insert, Grade 2.
Colors: As required by Code and as selected
by Owner.
A.7.2.1
A7-42/103
Unit Price
Sum
A.7.2.3
Quantity
11
Unit
Ea
17
Ea
14
Ea
14
Ea
A.7.2.4
Ea
A.7.2.5
Ea
A.7.2.5
ITEM
A.7.2.6
19
Ea
A.7.2.7
ITEM
A.7.2.8
Ea
A7-43/103
Unit Price
Sum
Unit
SQM
A7.4
Corner Guard
A.7.4.1
14.00
Ea
A.7.4.2
0.00
Ea
A.7.4.3
6.00
Ea
A.7.4.4
16.00
Ea
A.7.5
16.00
Ea
SUBTOTAL:
A7-44/103
Unit Price
MOP
Sum
Item
No.
B
Description
Quantity
Unit
Structural
All steel work and components indicated in
the design documents, either listed or not
listed below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional necessary for
performance
of
the
work.
B1
B1.1
400.00
C2 (UC356x406x340kg/m)
115.00
PE1 (H150x150x31.5kg/m)
96.00
Ve1 (H150x150x31.5kg/m)
VM1 (UB838x292x226kg/m)
VM2 (UB533x210x122kg/m)
1.50
73.00
151.00
T
T
T
1.70
94.00
30.00
16.00
T
T
T
VM3 (PFC200x75x23.4kg/m)
BR1 (UB533x210x122kg/m)
BR2 (PFC200x75x23.4kg/m)
Staircase (PFC300x90x48.6kg/m)
B1.2
B-45/103
Unit Price
Sum
Item
No.
B1.3
Description
Quantity
Unit
C1 Column (1450x1450x100mm)
C2 Column (850x850x50mm)
C1x VM1 (150x760x16mm)
VM1xVM2 (150x440x12mm)
31.00
11.00
66.00
194.00
pcs
pcs
pcs
pcs
C2 G.PLATE (320.6x188.2x20mm)
66.00
pcs
11.00
6.00
12.00
60.00
36.00
20.00
pcs
pcs
pcs
pcs
pcs
pcs
40.00
pcs
1.00
sum
1.00
sum
B2
Concrete structure
B2.1
B2.2
B2.3
B2.4
1,856.00
m3
3,488.00
13,680.00
B-46/103
Unit Price
Sum
Item
No.
B2.5
Description
According to shop drawgins, supply labor and
grade B35 concrete for each structural
member, including concrete curing, necessary
material and construction procedure.
B2.6
B2.7
B2.8
Quantity
Unit
7,934.00
m3
165.00
m3
1,160.00
290.00
B2.9
1,143.00
B2.10
3,661.00
B3
Section 05 12 01
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional necessary for
performance of the work.
B3.1
B-47/103
630.00
tons
Unit Price
Sum
Item
No.
B4
Description
Quantity
Unit
Unit Price
Gantry
Furnish and install of 3.5Ton overhead ganyry
system.
1.00
Ea
Sub-total:
B-48/103
MOP
Sum
Quantity
Unit
3
84
14
422
270
m
m
m
m
m
Gate valve
DN80
DN40
DN25
DN15
2
2
4
52
Nos
Nos
Nos
Nos
Non-return valve
DN80
DN40
1
1
Nos
Nos
lot
C5
sum
C6
lot
C7
sum
Plumbing
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
C1
C2
C3
C4
C-49/103
Unit Price
Sum
C8
C9
C10
sum
sum
As fitted drawings.
sum
Sub-total:
C-50/103
MOP
Quantity
Unit
22
108
22
m
m
m
3
2
2
4
2
2
2
Nos
Nos
Nos
Nos
Nos
Nos
Nos
lot
Nos
Item No.
Description
Drainage
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities,
quantities and dimensions defined in the
drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau International
Airport Co., Ltd (CAM). Unit prices shall
include all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
D1
D1.1
D1.2
D1.3
D1.4
D-51/103
Unit Price
Sum
D1.5
D2
D2.1
D2.2
D2.3
D2.4
D2.5
D2.6
D3
304
120
277
96
6
m
m
m
m
1
1
2
1
2
1
1
1
1
1
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
lot
44
Nos
565
set
sum
D-52/103
D4
D5
D6
sum
sum
As fitted drawings.
sum
Sub-total:
D-53/103
MOP
No.
Catogories
Electrical
E1
Power Distribution
E2
E3
Data Network
E4
Telecommunication
E5
E6
CCTV
E7
Elevator
Sub-total
SumMOP
Quantity
Unit
1.00
NO.
E1.1.2 Q.FS
1.00
NO.
E1.1.3 Q.FOAM
1.00
NO.
E1.1.4 Q.SPQ
1.00
NO.
4.00
NO.
6.00
NO.
6.00
NO.
1.00
NO.
E1.2.1 XV2(3x185+95+T95)
150.00
E1.2.2 XV3x150+95+T95
100.00
E1.2.3 XV3x120+70+T70
200.00
E1.2.4 XV3x95+50+T50
60.00
E1.2.5 XV3x70+35+T35
40.00
E1.2.6 XV3x50+25+T25
200.00
E1
Power Distribution
All systems and components indicated in the
design documents, either listed or not listed
below, shall be fully executed by the
Contractor in accordance with the qualities
and quantities defined in the drawings and
specifications. The work to be performed and
materials to be employed shall follow the
codes and regulations currently enforced in
Macau. All materials must be submitted for
approval by Macau International Airport Co.,
Ltd (CAM). Unit prices shall include all
materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
E1.1
E1.2
E1-55/103
Unit Price
Sum
E1.2.7 XV3x2.5+2.5+T2.5
200.00
E1.2.8 XV2x16+T10
1200.00
E1.2.9 FRV3x6+6+T6
300.00
E1.2.10 FRV3x70+35+T35
180.00
E1.2.11 FRV3x95+50+T50
E1.2.12 FRV3(3x1x400+1x240+T1x240)
120.00
180.00
m
m
400.00
1600.00
m
m
90.00
100.00
5.00
2.00
2.00
No.
No.
No.
No.
No.
1.00
1.00
8.00
No.
No.
No.
4800.00
650.00
m
m
55.00
20.00
No.
No.
162.00
No.
No.
No.
No.
No.
No.
No.
No.
No.
E1.4
E1.4.1
E1.4.2
E1.4.3
E1.4.4
E1.4.5
E1.4.6
E1.4.7
E1.4.8
E1.5 Cable
E1.5.1 VD20+V2x2.5+T2.5
E1.5.2 XV3x25+16+T16
E1.6 Normal Lighting
E1.6.1 10A One gang one way switch
E1.6.2 10A One gang two way switch
E1.7
E1.7.1
E1.7.2
E1.7.3
E1.7.4
E1.7.5
E1.7.6
E1.7.7
E1.7.8
E1.7.9
E1.8
Lighting Fixture
F1
F2
F3
F4
F5
F6
F7
S1
2 Hr. Emergency Battery
208.00
170.00
70.00
31.00
16.00
47.00
40.00
100.00
Cable
E1-56/103
E1.8.1 VD20+V2x1.5+T1.5
E1.8.2 VD20+V2x2.5+T2.5
18500.00
7500.00
m
m
1.00
No.
2.00
No.
E1.9
E1-57/103
MOP
Item No.
E2
Description
Quantity
Unit
E2.1
Distribution Equipment
E2.1.1
E2.1.2
Intelligent Controller
14 NO.
E2.1.3
Card Reader
16 NO.
E2.1.4
13 NO.
E2.1.5
Break Glass
12 NO.
E2.1.6
11 NO.
E2.1.7
Switch
2 NO.
E2.1.8
Software
1 NO.
2 NO.
E2-58/103
Unit Price
Sum
E2.1.9
Equipment rack
1 NO.
E2.1.10
1 NO.
E2.1.11
E2.2
Wiring
E2.2.1
Multi-core Cables
3000 m
E2.2.2
1500 m
E2.2.3
E2-59/103
MOP
Item No.
E3
Description
Quantity
Unit
Data Network
All systems and components indicated in
the design documents, either listed or
not listed below, shall be fully executed
by the Contractor in accordance with the
qualities and quantities defined in the
drawings and specifications. The work to
be performed and materials to be
employed shall follow the codes and
regulations currently enforced in Macau.
All materials must be submitted for
approval by Macau International Airport
Co., Ltd (CAM). Unit prices shall include
all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
E3.1
Distribution Equipment
E3.1.1
Core Switch
NO.
E3.1.2
Access Switch
NO.
E3.1.3
NO.
E3.1.4
84
NO.
E3.1.5
20
NO.
E3.1.6
NO.
E3.1.7
Equipment rack
NO.
E3.1.8
NO.
E3.2
Wiring
E3-60/103
Unit Price
Sum
E3.2.1
CAT 6 cable
E3.2.2
E3.2.3
10,000
1,500
Sub-total
E3-61/103
MOP
Item No.
E4
Description
Quantity
Unit
11,000
1,500
Telecommunication
All systems and components indicated in
the design documents, either listed or not
listed below, shall be fully executed by the
Contractor in accordance with the qualities
and quantities defined in the drawings and
specifications. The work to be performed
and materials to be employed shall follow
the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau
International Airport Co., Ltd (CAM). Unit
prices shall include all materials,
equipment, labor and all preparation work
and additional cost necessary for
performance of the work.
E4.1
Distribution Equipment
E4.1.1
CAT5 E cable
E4.1.2
E4.1.3
E4.1.4
300P Connection-BOX
126
NO.
NO.
E4-62/103
Unit Price
Sum
E4.1.5
100P Connection-BOX
E4.1.6
NO.
Sub-total
E4-63/103
MOP
Item No.
E5
Description
Quantity
Unit
NO.
60
NO.
E5.1
Distribution Equipment
E5.1.1
E5.1.2
Speaker
E5.1.3
NO.
E5.1.4
NO.
E5.1.5
Power Amplifier
NO.
E5.1.6
NO.
E5.1.7
CD Player
NO.
E5-64/103
Unit Price
Sum
E5.1.8
Switch
NO.
E5.1.9
PA System Software
NO.
E5.1.10
Equipment rack
NO.
E5.1.11
NO.
E5.2
Wiring
E5.2.1
Speaker cable
E5.2.2
6,000
CAT.5 cable
300
E5.2.3
500
E5.2.4
Sub-total:
E5-65/103
MOP
Item No.
E6
Description
Quantity
Unit
CCTV
All systems and components indicated in
the design documents, either listed or not
listed below, shall be fully executed by the
Contractor in accordance with the qualities
and quantities defined in the drawings and
specifications. The work to be performed
and materials to be employed shall follow
the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau
International Airport Co., Ltd (CAM). Unit
prices shall include all materials,
equipment, labor and all preparation work
and additional cost necessary for
performance of the work.
E6.1
Distribution Equipment
E6.1.1
E6.1.2
24
NO.
E6.1.3
14
NO.
E6.1.4
NO.
E6.1.5
Switch
NO.
E6.1.6
Network Recorder
NO.
E6.1.7
Equipment rack
NO.
14
E6-66/103
NO.
Unit Price
Sum
E6.1.8
E6.2
Wiring
E6.2.1
Signal cable
E6.2.2
CAT.6 cable
E6.2.3
NO.
m
3,500
Sub-total:
E6-67/103
MOP
0.00
Item No.
E7
Description
Quantity
Unit
Unit Price
Elevator
All systems and components indicated in
the design documents, either listed or not
listed below, shall be fully executed by the
Contractor in accordance with the qualities
and quantities defined in the drawings and
specifications. The work to be performed
and materials to be employed shall follow
the codes and regulations currently
enforced in Macau. All materials must be
submitted for approval by Macau
International Airport Co., Ltd (CAM). Unit
prices shall include all materials,
equipment, labor and all preparation work
and additional cost necessary for
performance of the work.
E7.1
Set
Sub-total:
E7-68/103
MOP
Sum
No.
Catogories
SumMOP
Mechanical
F1
HVAC system
F2
Sub-total
Item No.
F1
Description
Quantity
Unit
HVAC system
All systems and components indicated in
the design documents, either listed or not
listed below, shall be fully executed by
the Contractor in accordance with the
qualities and quantities defined in the
drawings and specifications. The work to
be performed and materials to be
employed shall follow the codes and
regulations currently enforced in Macau.
All materials must be submitted for
approval by Macau International Airport
Co., Ltd (CAM). Unit prices shall include
all materials, equipment, labor and all
preparation work and additional cost
necessary for performance of the work.
F1.1
F1.1.1
F1.1.1.1
F1.1.1.2
F1.1.1.3
6
3
2
F1-70/103
no
no
no
Unit Price
Sum
F1.1.2
F1.1.2.1
1.2.2
1
4
nos
nos
3
4
52
nos
nos
nos
nos
F1.1.2.6
F1.1.2.7
nos
F1.1.3
lot
F1.1.4
lot
F1.1.5
F1-71/103
no
F1.1.6
lot
F1.2
F1.2.1
F1.2.1.1
F1.2.1.2
F1.2.1.3
F1.2.1.4
EF-G-1
EF-G-2
EF-G-8
EF-G-9
1
1
1
1
no
no
no
no
F1.2.1.5
F1.2.1.6
F1.2.1.7
F1.2.1.8
F1.2.1.9
F1.2.1.10
F1.2.1.11
F1.2.1.12
F1.2.1.13
F1.2.1.14
F1.2.1.15
F1.2.1.16
F1.2.1.17
F1.2.1.18
F1.2.1.19
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
no
no
no
no
no
no
no
no
no
no
no
no
no
no
no
F1.3
F1.3.1
lot
F1-72/103
F1.3.2
lot
F1.3.4
lot
F1.3.5
lot
F1.4
F1.4.1
72
set
set
no
set
F1.4.2
F1.4.3
F1.4.4
F1.5
MISCELLANEOUS
F1.5.1
set
set
set
set
F1.5.2
F1.5.3
F1.5.4
F1-73/103
F1.5.5
set
F1.5.6
set
F1.6
Sub-total:
F1-74/103
MOP
F2
Quantity
Unit
set
set
F2.1
Equipment
F2.1.1
F2.1.2
F2-75/103
Unit Price
Sum
F2.1.3
set
F2.2
F2.2.1
Pcs
F2.2.2
Pcs
F2.2.3
lot
lot
lot
set
F2.2.4
F2.2.5
F2.3
F2.3.1
F2.4
MISCELLANEOUS
F2.4.1
set
set
set
F2.4.4
set
F2.5
F2.4.2
F2.4.3
F2-76/103
Sub-total:
F2-77/103
MOP
Item
No.
Description
Quantity
Unit
Fire Service
All systems and components indicated in the
design documents, either listed or not listed below,
shall be fully executed by the Contractor in
accordance with the qualities and quantities defined
in the drawings and specifications. The work to be
performed and materials to be employed shall
follow the codes and regulations currently enforced
in Macau. All materials must be submitted for
approval by Macau International Airport Co., Ltd
(CAM). Unit prices shall include all materials,
equipment, labor and all preparation work and
additional cost necessary for performance of the
work
G1
G1.1
Sprinkler System
Fire pump sets including motors and all
necessary accessories:
- SP-1 and SP-2
- SJ-1
G1.2
no.
no.
no.
G1.3
- 32mm dia.
2,200
- 40mm dia.
250
- 50mm dia.
100
- 65mm dia.
100
- 100mm dia
350
- 150mm dia.
600
- 80mm dia.
G-78/103
Unit Price
Sum
G1.4
G1.5
G1.6
30
- 150mm dia.
- 200mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
G1.7
no.
no.
no.
- 100mm dia.
G1.8
no.
- 150mm dia.
no.
- 200mm dia.
no.
no.
no.
no.
no.
- 150mm dia.
no.
- 200mm dia.
G1.9
no.
no.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
no.
no.
Globe valves:
G-79/103
G1.10
Pipeline strainers:
- 150mm dia.
no.
- 200mm dia.
G1.11
no.
no.
no.
no.
- 200mm dia.
G1.12
no.
no.
no.
Expansion joints :
- 50mm dia.
no.
- 100mm dia
no.
- 150mm dia.
no.
- 200mm dia.
G1.13
G1.14
no.
no.
no.
no.
no.
- 200mm dia.
10
no.
no.
no.
no.
- 50mm dia.
no.
- 80mm dia.
no.
- 100mm dia
no.
- 150mm dia.
no.
- 200mm dia.
G1.15
no.
no.
no.
no.
no.
G-80/103
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
- 200mm dia.
no.
no.
G1.17
no.
no.
1,000
no.
50
no.
no.
no.
no.
no.
no.
no.
G1.18
G1.19
Vortex inhibitors :
- 150mm dia.
no.
no.
G1.22
G1.21
no.
no.
- 200mm dia.
G1.20
no.
no.
- 100mm dia.
no.
- 150mm dia.
no.
no.
no.
no.
G-81/103
G1.23
G1.24
Others:
- Sprinkler guards
- Sprinkler water shields
(75mm diameter)
- Sprinkler rosettes
(ceiling plates)
- Stainless steel baffles
- Pressure gauges c/w
stop valves
- Damped pressure gauges c/w
stop valves
- Air vents c/w stop valves
G1.25
no.
100
no.
100
300
no.
no.
no.
20
20
5
no.
no.
no.
no.
G2
FH / HR SYSTEM
G2.1
G2.2
no.
no.
no.
G2.3
60
250
- 65mm dia.
- 100mm dia
- 150mm dia.
300
m
m
G-82/103
G2.4
m
m
- 150mm dia.
- 200mm dia.
G2.5
G2.6
50
200
Gate valves:
- 25mm dia.
20
no.
- 50mm dia.
12
no.
- 65mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
G2.7
no.
no.
no.
no.
no.
- 100mm dia.
G2.8
no.
no.
no.
- 150mm dia.
no.
no.
no.
no.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
no.
G2.9
Globe valves:
- 50mm dia.
G2.10
no.
Foot valves:
- 65mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
G-83/103
no.
G2.11
G2.12
no.
Pipeline strainers:
- 65mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
- 200mm dia.
G2.13
no.
no.
no.
- 200mm dia.
G2.14
no.
no.
no.
no.
Expansion joints:
- 50mm dia.
no.
- 100mm dia
no.
- 150mm dia.
no.
- 200mm dia.
G2.15
G2.16
no.
no.
no.
no.
no.
no.
no.
- 100mm dia
no.
- 150mm dia.
no.
no.
no.
G2.17
G2.18
G2.19
no.
12
no.
- 100mm dia.
G-84/103
22
no.
no.
G2.20
Vortex inhibitors:
no.
- 65mm dia.
no.
- 100mm dia
no.
- 150mm dia.
no.
- 200mm dia.
G2.21
no.
no.
G2.23
Others:
- Pressure gauges c/w
stop valves
- Damped pressure gauges c/w
stop valves
- Air vents c/w stop valves
G2.24
no.
no.
no.
10
no.
10
no.
10
no.
no.
sub - total (b)
G3
G3.1
G3.2
- 50mm dia.
- 65mm dia.
- 80mm dia.
100
- 100mm dia
100
- 150mm dia.
- 100mm dia.
- 150mm dia.
- 200mm dia.
- 250mm dia.
G-85/103
G3.3
Gate valves:
- 25mm dia.
no.
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
- 150mm dia.
no.
G3.5
no.
no.
- 80mm dia.
no.
no.
no.
- 50mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
no.
- 50mm dia.
G3.7
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
no.
- 150mm dia
no.
- 200mm dia
G3.8
no.
no.
Pipeline strainers :
- 65mm dia
no.
-100mm dia
no.
G-86/103
G3.9
no.
- 100mm dia.
G3.10
no.
Expansion joints :
- 50mm dia
G3.11
no.
- 100mm dia
no.
- 150mm dia
no.
- 200mm dia
no.
- 250mm dia
no.
Vortex inhibitors :
- 65mm dia.
no.
- 100mm dia.
no.
G3.12
Non-ferrous filters :
G3.13
no.
G3.14
no.
G3.15
Pudle flanges:
- 50mm dia.
no.
- 25mm dia.
20
no.
- 50mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 65mm dia.
no.
- 250mm dia.
G3.16
G3.17
no.
Others:
- Pressure gauges c/w
no.
no.
no.
G4
G-87/103
G4.1
- FARP - 01
G4.2
no.
- FARP - 02
no.
-FDCP - 01
no.
no.
G4.3
G4.4
no.
no.
10
no.
- FARP - 02
no.
-FDCP - 01
G4.5
no.
no.
no.
no.
G4.6
60
no.
G4.7
60
no.
G4.8
10
no.
G4.9
240
no.
G4.10
60
no.
G4.11
20
no.
G-88/103
G4.12
G4.13
no.
30
no.
110
no.
40
no.
G4.14
20
no.
G4.15
G4.16
G4.17
- 80mm dia
no.
- 100mm dia.
no.
- 150mm dia
no.
- 200mm dia
no.
no.
- 80mm dia
no.
- 100mm dia.
no.
- 150mm dia
G4.18
no.
no.
- 200mm dia
no.
no.
no.
no.
no.
G4.19
G4.20
G-89/103
70
no.
no.
G4.21
no.
G4.22
no.
G4.23
20
no.
G4.24
20
no.
G4.25
no.
11
11
no.
20
no.
20
no.
50
no.
G4.27
- 2.5mm
mm
G4.29
m
m
cores,
mm
- 4-cores, 1.5mm
cores,
mm
MICS cables:
- 2-cores, 1.5mm
cores,
G4.31
2000
- 4-cores, 1.5mm
- 2-cores, 1.5mm
G4.30
no.
no.
120
G4.26
G4.28
no.
mm
Armoured cables :
G-90/103
3,000
m
m
- 2-cores, 1.5mm
- 2-cores, 2.5mm
cores,
G4.32
G4.33
100
mm
- 2-cores, 2.5mm
cores,
mm
m
100
500
- 32mm dia.
G4.35
- 25mm dia.
1000
- 32mm dia.
G4.36
m
m
- 100mm x 100mm
G4.34
m
m
no.
500
G4.37
G4.38
Connection
of F.S. direct telephone line
including all deposit and the rental charges up
to
the
expiry
of
DLP
G4.39
G4.40
no.
no.
actuation
lot
no.
10
no.
sub total (d):
G5
G-91/103
G5.1
G5.2
G5.3
no.
no.
no.
- 32mm dia.
- 40mm dia.
- 50mm dia.
35
- 100mm dia.
G5.4
no.
m
m
- 32mm dia.
- 40mm dia.
- 50mm dia.
- 80mm dia.
- 100mm dia.
G5.5
no.
G5.6
no.
G5.7
no.
G5.8
no.
G-92/103
G5.9
G5.10
no.
G5.11
no.
G5.12
G5.13
G5.14
no.
G5.15
no.
G5.16
G5.17
no.
no.
no.
no.
no.
G5.18
no.
G5.19
no.
G5.20
no.
- Sirens
no.
no.
no.
G5.21
G-93/103
G5.22
no.
G5.23
no.
G5.24
no.
G5.25
G5.26
1.5mm
mm
G5.27
G5.28
-cores,
30
mm
-cores,
mm
10
- 100mm x 100mm
G5.29
m
100
- 32mm dia.
Rigid PVC conduits including junction boxes
and all necessary accessories:
- 20mm dia.
m
50
- 32mm dia.
G5.30
m
m
- 25mm dia.
G5.31
m
m
G5.30
m
m
30
G-94/103
G6
G6.1
no.
- FWJ-1
no.
no.
G6.2
G6.3
no.
- FWJ-1
no.
no.
no
no
- FCJ-1
G6.4
G6.5
no.
- 32mm dia.
- 40mm dia.
- 50mm dia.
- 65mm dia.
- 80mm dia.
- 100mm dia
- 150mm dia.
- 80mm dia.
- 100mm dia
200
- 200mm dia.
m
m
G-95/103
G6.6
- 32mm dia.
- 40mm dia.
- 50mm dia.
- 65mm dia.
- 80mm dia.
8700
300
1,500
- 200mm dia.
2,200
- 250mm dia.
500
- 100mm dia.
- 150mm dia.
- 300mm dia.
- 400mm dia.
G6.7
G6.8
200
- 40mm dia.
- 50mm dia.
- 65mm dia.
- 80mm dia.
30
- 100mm dia
80
- 150mm dia
200
- 200mm dia
30
no.
- 32mm dia.
no.
- 40mm dia
no.
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
11
- 150mm dia.
no.
no.
- 200mm dia.
25
no.
- 250mm dia.
25
no.
11
no.
- 300mm dia.
no.
- 400mm dia.
- 25mm dia. (PN25)
no.
no.
no.
no.
no.
G-96/103
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
- 32mm dia.
no.
- 40mm dia
no.
- 50mm dia.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
20
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
- 300mm dia.
no.
- 350mm dia.
no.
- 400mm dia.
no.
no.
no.
no.
no.
no.
no.
no.
no.
G6.10
no.
no.
no.
no.
no.
no.
- 32mm dia.
no.
- 40mm dia
no.
- 50mm dia.
no.
- 65mm dia.
no.
G-97/103
- 80mm dia.
no.
- 100mm dia.
G6.11
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
- 300mm dia.
no.
- 400mm dia.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
10
- 250mm dia.
G6.12
no.
no.
- 300mm dia.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
G-98/103
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
no.
no.
no.
2
no.
- 80mm dia.
no.
- 100mm dia
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
no.
Expansion joints:
- 100mm dia
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
20
- 300mm dia.
G6.15
no.
G6.14
no.
no.
- 150mm dia.
no.
no.
no.
- 40mm dia
no.
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
- 200mm dia.
no.
- 250mm dia.
no.
- 300mm dia.
no.
- 400mm dia.
no.
- 450mm dia.
no.
no.
G-99/103
G6.16
G6.17
no.
- 40mm dia
no.
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
- 300mm dia.
no.
- 400mm dia.
no.
no.
- 150mm dia.
no.
- 200mm dia.
no.
G6.18
G6.19
G6.20
G6.21
870
no.
11
no.
no.
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
10
no.
no.
- 150mm dia.
no.
- 200mm dia.
G6.22
G-100/103
G6.23
G6.24
G6.25
G6.26
no
70,000
litre
no.
no.
1
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 100mm (PN25)
no.
-200mm (PN25)
10
no.
Vortex inhibitors:
no.
- 65mm dia.
no.
- 80mm dia.
no.
- 100mm dia.
no.
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
no.
- 400mm dia.
G6.27
no.
no.
no.
- 150mm dia.
no.
- 200mm dia.
- 250mm dia.
no.
no.
- 300mm dia.
G6.28
no.
- 32mm dia.
no.
- 40mm dia
no.
- 50mm dia.
no.
- 65mm dia.
no.
- 80mm dia.
- 100mm dia.
no.
1
- 150mm dia.
no.
- 200mm dia.
no.
- 250mm dia.
G6.29
no.
10
no.
no.
G-101/103
- 300mm dia.
G6.30
no.
- 200mm dia.
no.
- 300mm dia.
no.
- 400mm dia.
G6.31
G6.32
16
no.
no.
no.
- 25mm dia.
no.
- 80mm dia.
no.
- 100mm dia
G6.33
no.
no.
no.
no.
G6.35
11
no.
10
1
G6.36
no.
lot
G6.37
Others:
no.
no.
no.
no.
G6.38
G7
30
G7.1
4.5 kg / 5 k CO
2 fire
extinguishers
G-102/103
no.
no.
G7.2
9 litres water/CO
fire extinguishers
10
G7.3
G7.4
Sand Buckets
G7.5
Fire blankets
G7.6
no.
no.
no.
no.
no.
no.
no.
no.
G-103/103