The document outlines costs for soil investigation work from Kalpakkam to Kanchipuram for a 230KV transmission line project. It includes costs for 1) mobilizing and demobilizing equipment to the site, 2) erecting platforms in water to enable boring work at depths, including materials and labor, and 3) conducting standard penetration tests at intervals from the existing ground level down to 28.5 meters depth to identify the refusal strata for foundations.
The document outlines costs for soil investigation work from Kalpakkam to Kanchipuram for a 230KV transmission line project. It includes costs for 1) mobilizing and demobilizing equipment to the site, 2) erecting platforms in water to enable boring work at depths, including materials and labor, and 3) conducting standard penetration tests at intervals from the existing ground level down to 28.5 meters depth to identify the refusal strata for foundations.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The document outlines costs for soil investigation work from Kalpakkam to Kanchipuram for a 230KV transmission line project. It includes costs for 1) mobilizing and demobilizing equipment to the site, 2) erecting platforms in water to enable boring work at depths, including materials and labor, and 3) conducting standard penetration tests at intervals from the existing ground level down to 28.5 meters depth to identify the refusal strata for foundations.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Soil investigation work from Kalpakkam to Kanchipuram 230KV Transmission Line
s. Description Unit
No 1 Mobilisation and demobilization charges Per For men & Equipment to the site Rig
2 Erection of Platform in water to enable
boring work to the required depth Including all materials and labour for Per erecting and dismantling to the platform Bore After the last consisting of 3 bores in water Boring 100mm/150mm dia standard soil investigation bore hole upto refusal strata foundation.
3 Which ever comes earlier, Conducting
Standard penetration test at 1.0m or part there of upto 10m below EGC and at 2.0m interval from 10.0m to 20m.