You are on page 1of 14

Construction of 2 Nos.

Recharge wells
S.NO

3
4

8
.
nstruction of 2 Nos. Recharge wells
DESCRIPTION (Scope of work )

Mobilization & demobilization of drilling rig at site along wit


equipments,which are required for working.

De-Watering of Pond

boring/drilling 250-300 mm dia with 40m.bgl depth includin


circulation pit as per design.the cost is to include
a) assessment of litholog samples
b) preparation of litho charts by corroborating drill cut sam
exact aquifer
c) to prepare well assembly
d) casing of blind and slotted pvc pipes 150mm dia to the d
with 6kg/cm2 pressure in borehole
e) laying of filter media around annular space of borewell
f) conduction of infiltration test
g) development of wells with air compressor.
Excavation work & Dressing for creating recharge pond so
topography of the perennial dendtric and natural drainage
appropriate storage of rainwater so as to achieve the desir
thru' return flow facilitating the target of achieving desired q
stipulated in cgwa noc.The cost includes disposal of surplu
earth.The excavated soil is to be disposed at site only

Making of 2m. dia,0.23m .thick & 1m height brick circular r


with pea Gravel pakig,

Making of Brick De-Silting chamber 2 X2x 1.5mwith 0.230

P/ F of 300 mm Dia RCC NP-2 Pipe from Catchment area

Manually Suppression of top loose Soil

TOTAL R
GST @ 1
G. Total Rs.
UNIT

t site along with other related LS

job

depth including excavation of water


clude

g drill cut samples so as to decipher the

mm dia to the depth of 36m.bgl (IS: 4985) No.s

ce of borewell

r.
harge pond so as to maintain the
atural drainage .the cost is to include the
hieve the desired objective of seepage
eving desired quantum of recharge as
sposal of surplus and refilling of requisite Cum.
at site only

brick circular recharge structures no.s

.5mwith 0.230m .Wall & with PCC, no.s

atchment area to Recharge Pond rm.

job

TOTAL RS.
GST @ 18°/o
QTY Price (Rs.)

1.00 15000

1.00 5000

454000

2.00
1500000

10000.00

2.00 102800

3.00 90000

20.00 25000

1 10000

2201800
396324
2598124
I
S.No. S.No. Description Qty Unit Rate
1 1 Mobilization & demobilization of drilling rig at site 1 Job 15000
along with other related equipments,which are required
for working
2 1 De-Watering of Pond 1 Job 5000
3 1 boring/drilling 250-300 mm dia with 40m.bgl depth 40 Per mtr 800
including excavation of water circulation pit as per
design
2 assessment of litholog samples 3 Per Sample 25000
3 preparation of litho charts by corroborating drill cut 1 Job 2000
samples so as to decipher the exact aquifer
4 casing of blind and slotted pvc pipes 150mm dia to the 36 Per Mtr 2000
depth of 36m.bgl (IS: 4985) with 6kg/cm2 pressure in
borehole
5 laying of filter media around annular space of borewell 360 cft 100
6 conduction of infiltration test 1 Job 5000
7 development of wells with air compressor 1 Job 5000
4 1 Excavation work & Dressing for creating recharge pond 10000 cum 150
so as to maintain the topography of the perennial
dendtric and natural drainage
5 1 Making of 2m. dia,0.23m .thick & 1m height brick 1 Job 20000
circular recharge structures
2 Pea Gravel pakig 314 cft 100
6 1 Making of Brick De-Silting chamber 2 X2x 1.5mwith 1 nos 30000
0.230m .Wall & with PCC
7 1 P/ F of 300 mm Dia RCC NP-2 Pipe from Catchment 20 mtr 1250
area to Recharge Pond
8 1 Manually Suppression of top loose Soil 1 Job 10000
Total
Price
15000

5000
32000

75000
2000

72000

36000
5000
5000
1500000

20000

31400
30000

25000

10000
1863400