Recharge wells
S.NO
3
4
8
.
nstruction of 2 Nos. Recharge wells
DESCRIPTION (Scope of work )
De-Watering of Pond
TOTAL R
GST @ 1
G. Total Rs.
UNIT
job
ce of borewell
r.
harge pond so as to maintain the
atural drainage .the cost is to include the
hieve the desired objective of seepage
eving desired quantum of recharge as
sposal of surplus and refilling of requisite Cum.
at site only
job
TOTAL RS.
GST @ 18°/o
QTY Price (Rs.)
1.00 15000
1.00 5000
454000
2.00
1500000
10000.00
2.00 102800
3.00 90000
20.00 25000
1 10000
2201800
396324
2598124
I
S.No. S.No. Description Qty Unit Rate
1 1 Mobilization & demobilization of drilling rig at site 1 Job 15000
along with other related equipments,which are required
for working
2 1 De-Watering of Pond 1 Job 5000
3 1 boring/drilling 250-300 mm dia with 40m.bgl depth 40 Per mtr 800
including excavation of water circulation pit as per
design
2 assessment of litholog samples 3 Per Sample 25000
3 preparation of litho charts by corroborating drill cut 1 Job 2000
samples so as to decipher the exact aquifer
4 casing of blind and slotted pvc pipes 150mm dia to the 36 Per Mtr 2000
depth of 36m.bgl (IS: 4985) with 6kg/cm2 pressure in
borehole
5 laying of filter media around annular space of borewell 360 cft 100
6 conduction of infiltration test 1 Job 5000
7 development of wells with air compressor 1 Job 5000
4 1 Excavation work & Dressing for creating recharge pond 10000 cum 150
so as to maintain the topography of the perennial
dendtric and natural drainage
5 1 Making of 2m. dia,0.23m .thick & 1m height brick 1 Job 20000
circular recharge structures
2 Pea Gravel pakig 314 cft 100
6 1 Making of Brick De-Silting chamber 2 X2x 1.5mwith 1 nos 30000
0.230m .Wall & with PCC
7 1 P/ F of 300 mm Dia RCC NP-2 Pipe from Catchment 20 mtr 1250
area to Recharge Pond
8 1 Manually Suppression of top loose Soil 1 Job 10000
Total
Price
15000
5000
32000
75000
2000
72000
36000
5000
5000
1500000
20000
31400
30000
25000
10000
1863400