CIVIL WORKS
A SCHEDULED ITEMS
1 Clearing Jungle (dense) by cutting, 14/2 100 Sft
removing all Shrubs, trees upto 6 inches
(152 mm) girth etc and taking out their
entire roots and filling the hollows with
earth concrete with dressing,consolidating
and watering the filling including stacking
the serviceable materials and disposal of
useless materials and directed lead upto
10 chains (305Rm) cost of earth included.
9 Providing and laying first class solid brunt 124/2 100 Cft
brick masonry set in cement mortar 1:6 in
straight or curved walls 9" to 13 1/2" (228
mm to 343 mm) thick including scaffolding,
racking out joints and curing etc complete
in foundation, basement and plinth
(foundation and basement masonry upto 5
feet (1.52 R.m) depth and plinth upto 4 feet
(1.2Ru.m) height from ground level)
10 Providing and laying 1.5" (38 mm) thick 69/8 100 Sq.ft.
DPC with cement concrete 1:2:4 cast in
situ using graded screened bajri of 3/4 inch
(19mm) and down gauge including
compacting, curing, form work and its
removal etc. complete with applying a coat
of hot bitumen ( max asphalt 80/100 or
equivalent) using 35 lbs. per hundred
square feet (1.7Kg/sm) on DPC after
complete drying and cleaning the surface
with double layer of polythene sheet of 500
gauge.