13 11/8/2010 KBRC K 350 SRC 2 2
Spacer
18 ### KBRC K 350 SRC 1000 800 P3 Zone 33
22 ### KBRC K 350 SRC 1200 1000 P3 Zone 3
25 ### KBRC K 350 SRC 2 2 Spacer block
30 12/3/2010 KBRC K 350 SRC 1700 1819 P3 Zone 5 & 13
34 12/8/2010 KBRC K 350 SRC 2 2 Spacer block
P3 Zone 7 & 12
41 ### KBRC K 350 SRC 2800 2612
Raft Slab
44 ### KBRC K 350 SRC 850 765 P3 Zone 13

47 23/24/12/ KBRC K 350 SRC 1800 1860 P4 Zone 30,31


10
25,26/12/
48 KBRC K 350 SRC 2100 2232 P 3 Zone 16,18
10
54 ### KBRC K 350 SRC 3000 2816 P3 Zone 11,17

63 06&07/01 KBRC K 350 SRC 1400 1364 P 3 Zone 23