Lecture 3 - Steel Piles & Jack Arch Flooring
Lecture 3 - Steel Piles & Jack Arch Flooring
MATERIAL
PART – 2
JACK ARCH FLOORS
BRICK JACK ARCH FLOORING FIRST THE M.S. JOISTS ARE PLACED AND
SECURED IN POSITION.
TOP CONCRETE AND FLOORING SHOULD NOT BE LAID
UNLESS THE BRICK WORK IS CURED FOR 15 DAYS CENTERING OF SEGMENTAL PIECE OF TIMBER
WITH CHORD LENGTH EQUAL TO THE SPAN OF
THE ARCH AND CONFORMING TO THE SOFFIT IS
MADE TO REST ON THE LOWER FLANGE OF THE
R.S.J. WITH THE CURVED SURFACE UPWARDS.
CONCRETE LAID
THE FNISHED IS COMPACTED
FLOOR BY VIBRATOR
IS CURED FOR OR
10 DAYS AND
MANUALLY
CENTERING. THE FLOORING
IS THEN IS THEN
REMOVED. DONE.
FIRST THE WOODEN
BLOCK, THEN THE RODS AND THEN THE PLATE.
THE ARCH MAY THEN BE PLASTERED