SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Glass & Glazing Pre-Installation Inspection SAIC-M-1059 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
________________________________________
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

External Windows are prohibited for in plant buildings and out of plant
buildings located near enough to a plant where it is possible to receive SAES-B-014
A1
3.5 kPa gauge (0.5psig) Peak Side-on Overpressure or more from a Sec. 5.8
Vapor Cloud Explosion.

The rough opening shall be larger in both width and height than the
SAES-M-100
A2 actual net dimension of the product to be installed.
Sec. D
(1997 UBC, Sec. 2404.1)

Glass Shall be transparent or patterned wired flat glass, clear or tinted, SAES-M-100
A3
intended for general glazing applications.(1997 UBC, Sec 2404.4.1 & .2) Sec. D

Non-wired glass shall be 6 to 25mm's thick within a tolerance of -7% to SAES-M-100


A4
+4% and + 6.4mm on length and width.(1997 UBC, Sec 2404.4.1 & .2) Sec. D

Glass shall not contain cracks; surfaces shall be clear, sharp, defined
SAES-M-100
A5 and free of obvious flaws that effect appearance and function.
Sec. D
(1997 UBC, Sec 2404.4.1 & .2)

Wired glass shall be 6 or 10mm's thickness within a tolerance of from


SAES-M-100
A6 -12% to +27% and from +4.8mm's on length and width.
Sec. D
(1997 UBC, Sec 2404.4.1 & .2)

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003
2- 1997 UBC -- Uniform Building Code, 1 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1