MEASURMENT SHEET

Sr. no. ITEM NOS. L B H QTY UNIT


A CIVIL WORK UP TO PLINTH LEVEL
1 EXCAVATION UP TO 1.83 MT
F1 2 1.250 1.350 1.83 6.18
F2 4 1.500 1.600 1.83 17.57
F3 26 1.600 1.700 1.83 129.42
F4 8 1.700 1.800 1.83 44.80
F5 9 1.950 2.100 1.83 67.44
F6 10 2.100 2.250 1.83 86.47
F7 4 2.100 2.100 1.83 32.28
CF1 4 2.180 3.525 1.83 56.25
SF1 4 1.85 5.31 1.83 71.91
SF2 2 3.00 3.07 1.83 33.71
546.02 CM
2 EXCAVATION 1.83 TO 2.44 MT
F1 2 1.250 1.350 0.61 2.06
F2 4 1.500 1.600 0.61 5.86
F3 26 1.600 1.700 0.61 43.14
F4 8 1.700 1.800 0.61 14.93
F5 9 1.950 2.100 0.61 22.48
F6 10 2.100 2.250 0.61 28.82
F7 4 2.100 2.100 0.61 10.76
CF1 4 2.180 3.525 0.61 18.75
SF1 4 1.85 5.31 0.61 23.97
SF2 2 3 3.07 0.61 11.24
182.01 CM

3 Refilling of excavated foundation pit


total qty of excavation
Column 728.03
728.03
Less quantity of RCC footing -81.09 CM
Net of refilling 646.93 CM

4 PCC LAYYING (1:4:8)


H = 0.10 MT
F1 2 1.25 1.350 0.10 3.38
F2 4 1.50 1.600 0.10 9.60
F3 26 1.60 1.700 0.10 70.72
F4 8 1.70 1.800 0.10 24.48
F5 9 1.95 2.100 0.10 36.86
F6 10 2.10 2.250 0.10 47.25
F7 4 2.10 2.100 0.10 17.64
CF1 4 2.18 3.525 0.10 30.74
SF1 4 1.85 5.31 0.10 39.29
SF2 2 3.00 3.07 0.10 18.42
UGWT PCC work 2 4.49 0.63 0.10 5.68
304.05 SM

5 PCC LAYING ( 1:4:8 ) WORK BELOW GB


HORIZONTAL GROUND BEAM
12 2.23 0.43 0.10 11.51
20 3.21 0.43 0.10 27.56
20 2.28 0.43 0.10 19.61
12 1.43 0.43 0.10 7.38
Stair Case & Lift Side GB1 8 2.40 0.43 0.10 8.26
VERTICAL GROUND BEAM
6 3.08 0.43 0.10 7.93
8 13.08 0.43 0.10 45.00
4 11.40 0.43 0.10 19.61
4 7.93 0.43 0.10 13.64
Stair Case & Lift Side GB1 2 3.02 2.85 0.10 17.19
177.67 SM

6 RCC FOOTING (1:2:4 )

F1 2 1.05 1.15 0.15 0.36


F2 4 1.3 1.4 0.15 1.09

F3 26 1.4 1.5 0.15 8.19

F4 8 1.5 1.6 0.15 2.88

F5 9 1.75 1.9 0.15 4.49

F6 10 1.9 2.05 0.25 9.74

F7 4 1.9 1.9 0.60 8.66

Combined Footing CF1 4 1.98 3.33 0.60 15.80

Shear Wall Footing SF1 4 1.65 5.11 0.60 20.24

Shear Wall Footing SF2 2 2.8 2.87 0.60 9.64

81.09 CM

7 RCC COLUMN UP TO G.L H = 2.44

CC1,CC7,CH1,CH7 8 0.23 0.45 1.98 1.64


CC4,CH4 4 0.23 0.45 1.98 0.82
CA4,CB4,CD4,CE4,CF4,CG4,CF2,CF3 12 0.38 0.38 1.98 1.06
3.52 CM
8 RCC COLUMN UP TO G.L ( 230 X 380 ) H = 2.44

CB1,CB7,CI1,CI7,CK1,CK7 8 0.23 0.38 1.98 15.84


CB3,CB5,CI3,CI5,CK3,CK5 8 0.23 0.38 1.98 15.84
CC3,CC5,CH3,CH5 8 0.23 0.38 1.98 15.84
CI4,CK4 2 0.23 0.38 1.98 3.96
CJ4 1 0.23 0.38 1.98 1.98
53.46 RM
9 RCC COLUMN UP TO G.L ( 230 X 300 ) H = 2.44

CD2,CD6,CG2,CG6 8 0.23 0.30 1.98 1.09


CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 1.98 1.09
CD3,CD5,CG3,CG5 8 0.23 0.30 1.98 1.09
3.28 RM

10 RCC COLUMN UP P.L H = 0.46

CC1,CC7,CH1,CH7 8 0.23 0.45 0.46 0.38


CC4,CH4 4 0.23 0.45 0.46 0.19
CA4,CB4,CD4,CE4,CF4,CG4,CF2,CF3 12 0.38 0.38 0.46 0.00
0.57 CM
11 RCC COLUMN UP P.L ( 230 X 380 ) H = 0.46

CB1,CB7,CI1,CI7,CK1,CK7 8 0.23 0.38 0.46 3.68


CB3,CB5,CI3,CI5,CK3,CK5 8 0.23 0.38 0.46 3.68
CC3,CC5,CH3,CH5 8 0.23 0.38 0.46 3.68
CI4,CK4 2 0.23 0.38 0.46 0.92
CJ4 1 0.23 0.38 0.46 0.46
12.42 RM
12 RCC COLUMN UP P.L ( 230 X 300 ) H = 0.46

CD2,CD6,CG2,CG6 8 0.23 0.30 0.46 0.25


CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 0.46 0.25
CD3,CD5,CG3,CG5 8 0.23 0.30 0.46 0.25
0.76 RM

13 Shear Wall Up to Plinth Level SW4 & SW5 2 7.44 0.15 2.44 36.31
36.31 SM
14 GROUND BEAM
HORIZONTAL GROUND BEAM
12 1.90 0.23 0.30 22.80
20 2.55 0.23 0.30 51.00
20 2.05 0.23 0.30 41.00
12 1.30 0.23 0.30 15.60
Stair Case & Lift Side GB1 6 2.40 0.23 0.30 14.40
VERTICAL GROUND BEAM
3 0.23 4.97 0.30 14.91
8 0.23 11.36 0.30 90.88
4 0.23 10.00 0.30 40.00
4 0.23 7.35 0.30 29.40
Stair Case & Lift Side GB1 2 0.23 2.97 0.30 5.94
325.93 RM
15 SOG ( Slab on Ground Level )
4 2.13 5.95 0.10 50.69
4 3.09 12.88 0.10 158.94
4 2.28 11.20 0.10 102.14
4 1.34 6.45 0.10 34.57
2 2.78 7.69 0.10 42.76
Deduct Lift -2 1.90 1.67 0.10 -6.35
382.76 SM
16 UNDER GROUND WATER TANK RCC WORK -
Bottom Raft 2 2.70 4.19 0.15 22.63
Short Tank Wall 2 2.40 0.15 2.20 10.56
Long Tank Wall 2 0.15 4.49 2.20 19.76
Top Slab 2 2.70 4.49 0.10 24.25
77.19 SM

B GROUND FLOOR :-
17 Ground Floor Column from plinth to First Slab ( 230 X 380 )

CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80


CB3,CB5,CI3,CI5 8 0.23 0.38 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.38 2.73 21.80
CI4,CK4 2 0.23 0.38 2.73 5.45
CJ4 1 0.23 0.38 2.73 2.73
73.58 RM
18 Ground Floor Column from plinth to First Slab ( 230 X 300 )

CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80


CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
65.40 RM
19 Ground Floor Column from plinth to First Slab ( 230 X 450 )
CC4,CH4 4 0.23 0.45 2.73 1.13
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
22.93 CM
20 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
21 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM
22 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
C FIRST FLOOR :-
23 First Floor Column in RM ( 230 X 380 )
CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80
CB3,CB5,CI3,CI5 8 0.23 0.38 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.38 2.73 21.80
CI4,CK4 2 0.23 0.38 2.73 5.45
CJ4 1 0.23 0.38 2.73 2.73
73.58 RM
24 First Floor Column in RM ( 230 X 300 )
CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80
CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
65.40 RM
25 First Floor Column ( 230 X 450)
CC4,CH4 4 0.23 0.45 2.73 1.13
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
22.93 CM
26 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
27 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM

28 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
D SECOND FLOOR :-
29 Second Floor Column ( 230 X 380 )
CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80
CB3,CB5,CI3,CI5 8 0.23 0.38 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.38 2.73 21.80
CI4,CK4 2 0.23 0.38 2.73 5.45
CJ4 1 0.23 0.38 2.73 2.73
30 Second Floor Column ( 230 X 300 ) 73.58 RM
CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80
CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
65.40 RM
31 Second Floor Column ( 230 X 450 )
CC4,CH4 4 0.23 0.45 2.73 1.13
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
22.93 CM
32 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
33 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM
34 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
E THIRD FLOOR :-
35 Third Floor Column ( 230 X 380 )
CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80
CI4,CK4 2 0.23 0.38 2.73 5.45
CC4,CH4 4 0.23 0.38 2.73 0.95
28.20 RM
36 Third Floor Column ( 230 X 300 )
CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80
CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CB3,CB5,CI3,CI5 8 0.23 0.30 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
CJ4 1 0.23 0.30 2.73 2.73
109.00 RM
37 Third Floor Column in CM ( 230 X 450 )
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
22.75 CM
38 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
39 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM
40 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
F FOURTH FLOOR :-
41 Fourth Floor Column ( 230 X 380 )
CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80
CC4,CH4 4 0.23 0.38 2.73 0.95
22.75 RM
42 Fourth Floor Column ( 230 X 300 )
CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80
CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CB3,CB5,CI3,CI5 8 0.23 0.30 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
CI4,CK4 2 0.23 0.30 2.73 5.45
CJ4 1 0.23 0.30 2.73 2.73
117.18 RM
43 Fourth Floor Column ( 230 X 450 )
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
21.80 CM
44 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
45 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM
46 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
G FIFTH FLOOR :-
47 Fifth Floor Column ( 230 X 380 )
CB1,CB7,CI1,CI7 8 0.23 0.38 2.73 21.80
CC4,CH4 4 0.23 0.38 2.73 0.95
22.75 RM
48 Fifth Floor Column ( 230 X 300 )
CD2,CD6,CG2,CG6 8 0.23 0.30 2.73 21.80
CA3,CA5,CJ3,CJ5,CF5 8 0.23 0.30 2.73 21.80
CB3,CB5,CI3,CI5 8 0.23 0.30 2.73 21.80
CC3,CC5,CH3,CH5 8 0.23 0.30 2.73 21.80
CD3,CD5,CG3,CG5 8 0.23 0.30 2.73 21.80
CI4,CK4 2 0.23 0.30 2.73 5.45
CJ4 1 0.23 0.30 2.73 2.73
117.18 RM
49 Fifth Floor Column ( 230 X 450 )
CC1,CC7,CH1,CH7 8 0.23 0.45 2.73 21.80
21.80 CM
50 Shear Wall
SW1 2 2.15 0.15 2.73 11.74
SW2 4 2.45 0.15 2.73 26.75
SW3 4 3.31 0.15 2.73 36.15
SW4 4 1.82 0.15 2.85 20.75
SW5 2 1.90 0.15 2.85 10.83
106.22 SM
51 Stair Case
Stair Case Beam B1 2 2.40 0.15 0.38 4.80
B2 2 2.40 0.15 0.45 4.80
Stair Case 20 1.20 24.00
33.60 RM
Stair Case Pardi Near Landing 1 2.40 0.10 0.91 2.18
Stair Case Pardi on Waist Slab 2 2.35 0.10 1.00 4.70
6.88 SM
52 Slab
4 2.13 5.95 0.13 50.69
4 2.78 12.88 0.13 142.97
4 2.51 13.02 0.13 130.72
4 1.38 6.55 0.13 36.16
Passage Nr. Stair Case 2 2.70 2.79 0.13 15.04
Sunk Slab 4 14.00 0.20 0.13 11.20
Duct Deduction -4 0.91 1.55 0.13 -5.64
381.14 SM
H SIXTH FLOOR :-
53 Terrace to Stair Cabin Column ( 150 X 300 )
CE4,CF4 4 0.15 0.30 2.66 10.64
10.64 RM
54 Terrace to Stair Cabin Column ( 230 X 300 )
CF5 2 0.23 0.30 2.66 5.32
55 Terrace to Stair Cabin Beam ( 150 X 380 ) 5.32 RM
B1 2 2.60 0.15 0.28 5.20
B1 4 2.25 0.15 0.28 9.00
B1 2 1.03 0.15 0.28 2.06
B3 2 2.40 0.15 0.28 4.80
21.06 RM
56 Terrace to Stair Cabin Beam ( 150 X 450 )
B2 2 2.94 0.15 0.35 5.88
B4 4 1.25 0.15 0.35 5.00
B5 2 2.40 0.15 0.35 4.80
15.68 RM
57 Shear Wall
Stair-Case Cabin 4 2.40 0.15 2.54 24.34
4 3.31 0.15 2.54 33.56
SW4 4 1.82 0.15 2.66 19.36
SW5 2 1.90 0.15 2.66 10.11
87.37 SM
58 Slab
2 2.70 3.31 0.13 17.87
2 2.70 5.82 0.10 31.43
Less Lift Area ( SW4 & SW5 ) -2 1.90 1.82 0.10 -6.92
42.39 SM
I SEVENTH FLOOR :-
59 Stair Cabin to Lift Room Roof Column ( 150 X 300 )
CE4,CF4 4 0.15 0.30 1.65 6.60
CE5 2 0.15 0.30 1.55 3.10
9.70 RM
60 Stair Cabin to Lift Room Roof Column ( 230 X 300 )
CF5 2 0.23 0.30 1.65 3.30
3.30 RM
61 Stair Cabin to Lift Room Roof Beam ( 150 X 380 )
B6 4 2.40 0.15 0.28 9.60
B7 4 2.40 0.15 0.28 9.60
B8 4 2.94 0.15 0.28 11.76
B9 4 1.40 0.15 0.28 5.60
36.56 RM
62 Shear Wall
Stair-Case Cabin 4 2.40 0.15 1.55 14.88
4 3.31 0.15 1.55 20.52
35.40 SM
63 Slab
2 2.70 3.31 0.10 17.87
2 2.70 4.79 0.10 25.87
43.74 SM
64 Inside Waterproofing Work :-
Base of Under Ground Water Tank 2 2.40 4.19 1.00 20.09
Inside Under Ground Water Tank 4 2.40 1.00 2.30 22.08
Inside Under Ground Water Tank 4 4.19 1.00 2.30 38.50
80.67 SM
65 Outside Waterproofing Work :-
Outer Side of UGWT 4 2.70 1.00 2.45 26.46
Outer Side of UGWT 4 4.19 1.00 2.45 41.01
67.47 SM

66 R.C.C. CHHAJJA
1st floor
Lintel Level 8 1.60 0.38 0.15 4.86
8 3.51 0.38 0.15 10.67
8 1.60 0.38 0.15 4.86
8 1.54 0.38 0.15 4.67
Sill Level 12 1.60 0.38 0.15 7.30
32.36 SM
2nd floor 32.36
3rd floor 32.36
4th floor 32.36
5th floor 32.36
161.80 SM

67 R.C.C. LINTEL (door / window , vent) ( 150 X 150 )


1st floor
BED 16 1.68 0.15 0.15 26.88
BED 8 1.14 0.15 0.15 9.12
BED 8 1.37 0.15 0.15 10.96
Living 8 1.38 0.15 0.15 11.04
Living 4 2.36 0.15 0.15 9.44
Lift 2 1.36 0.15 0.15 2.72
1st floor 70.16
2nd floor 70.16
3rd floor 70.16
4th floor 70.16
5th floor 70.16
350.80 RM
68 R.C.C. LINTEL (door / window , vent) ( 115 X 150 )
1st floor
BATH&WC 8 2.08 0.12 0.15 16.60
BED 8 1.14 0.12 0.15 9.12
KITCH 8 2.17 0.12 0.15 17.32
BATH&WC 16 0.81 0.12 0.15 12.88
BED 8 1.26 0.12 0.15 10.04
1st floor 65.96
2nd floor 65.96
3rd floor 65.96
4th floor 65.96
5th floor 65.96
329.80 RM

69 BRICK WALL MASONARY ( 6" WALL ) (150mm)


BED 8 2.55 0.15 2.73 55.59
BED 8 1.90 0.15 2.73 41.42
BED 4 0.74 0.15 2.73 8.07
BATH 4 1.11 0.15 2.73 12.10
LIVING 4 1.03 0.15 2.73 11.23
LIVING 8 1.38 0.15 2.73 30.08
Lift 2 2.250 0.15 2.73 12.26
VERTICAL (in to in)
BED 6 2.600 0.15 2.73 42.51
BED 8 2.855 0.15 2.73 62.24
KITCHEN 8 1.875 0.15 2.73 40.88
LIVING 2 1.380 0.15 2.73 7.52
LIVING 4 0.990 0.15 2.73 10.79
LIVING 2 2.900 0.15 2.73 15.81
DEDUCTION
MD 8 0.99 0.15 2.28 -18.06
W1 6 1.38 0.15 1.37 -11.34
W1A 2 1.30 0.15 1.37 -3.56
W2 16 1.22 0.15 1.37 -26.74
W3A 16 0.91 0.15 1.37 -19.95
Lift Door -2 0.99 0.15 2.28 -4.51
UGWT Brick Masonary work UP to Plinth LVL. 4 0.633 0.15 0.50 1.27
1st floor 266.32
2nd floor 266.32
3rd floor 266.32
4th floor 266.32
5th floor 266.32
Terrace floor 8 18.88 0.15 1.00 151.04
4 2.52 0.15 2.54 25.60
Lift Machine Room 2 15.00 0.15 2.54 76.20
Dedut -2 0.99 0.15 2.13 -4.22
2 1.20 0.15 2.54 6.10
Chhjja wall 24 4.07 0.38 0.15 37.12
Chhjja wall 24 1.22 0.38 0.15 11.13
TOTAL 1634.58 SM

70 4" BRICK WALL HORIZONTEL


HORIZONTAL
Wash 8 2.28 0.115 0.91 16.60
KITCHEN 8 2.05 0.115 2.73 44.69
BED 8 2.55 0.115 2.73 55.59
BATH&WC 8 2.13 0.115 2.73 46.43
WC 8 0.91 0.115 2.73 19.84
LIVING 8 0.67 0.115 2.73 14.61
VERTICAL
BALC 8 0.80 0.115 0.91 5.79
BED 8 2.86 0.115 2.73 62.24
BED 8 2.81 0.115 2.73 61.26
LIVING 8 1.80 0.115 2.73 39.24
BATH&WC 8 1.73 0.115 2.73 37.61
403.89
DEDUCTION
W3 8 0.91 0.115 1.14 -8.30
V1 16 0.46 0.115 0.75 -5.52
D2 16 0.91 0.115 2.28 -33.20
D3 24 0.75 0.115 2.28 -41.04
1st floor 315.83
2nd floor 315.83
3rd floor 315.83
4th floor 315.83
5th floor 315.83
TERRACE
TOTAL 1579.15 SM

71 SANDFACE PLASTER (OUTER PLASTER)


1st floor 1 160.00 2.85 456.00
near toilet duct 4 4.92 3.15 61.99
W1 3 1.38 1.22 -5.05
W1A 1 1.30 1.22 -1.59
W2 8 1.22 1.22 -11.91
W3A 6 0.91 1.22 -6.66
Wash Wall Deduct 8 2.28 1.82 -33.11
492.79 SM

2nd floor 492.79


3rd floor 492.79
4th floor 492.79
5th floor 492.79
TERRACE 1 110.00 1.00 110.00
Bath & WC Duct 4 4.92 1.30 25.58
Stair Cabin & Lift machine Room 2 25.00 2.66 133.00
Lift Machine Room 2 16.10 2.66 85.65
OHWT 2 12.10 1.32 31.82
Deduct -6 0.99 2.13 -12.65
Deduct -2 0.91 0.99 -1.80

TOTAL 2835.54 SM

72 PLASTER (INTERNAL PLASTER)


BED ROOM 8 12.18 - 2.58 251.40
KITCHEN 8 7.90 - 2.58 163.06
WASH 8 3.00 - 2.58 61.92
WASH 8 3.00 1.03 24.72
BED ROOM 8 10.98 - 2.58 226.63
Passage Nr. Bath & WC 8 5.17 2.58 106.71
LIVING 8 10.83 - 2.58 223.53
BATH 8 5.43 - 2.58 112.08
W/C 8 3.64 - 2.58 75.13
PASSAGE Nr. Stair & Lift 2 14.03 - 2.58 72.39
Stair-Case Flight 4 2.10 1.20 10.08
Stair-Case Landing 2 1.33 2.40 6.38
Stair Pardi 4 2.10 2.15 18.06
Stair Pardi 2 2.40 1.15 5.52
Chhjja 10 19.35 0.38 0.15 73.53
10 18.75 0.38 0.15 71.25
10 5.95 0.38 0.15 22.61
10 5.65 0.38 0.15 21.47
16 4.37 0.38 0.15 26.57
8 1.52 0.38 0.15 4.62
8 1.22 0.38 0.15 3.71
16 4.07 0.38 0.15 24.75
8 4.37 0.38 0.15 13.28
4 1.52 0.38 0.15 2.31
8 4.07 0.38 0.15 12.37
4 1.22 0.38 0.15 1.85 278.33
DEDUCTION
D1 16 0.99 2.13 -16.87
D2 32 0.91 2.13 -31.01
D3 48 0.75 2.13 -38.34
W1 3 1.38 1.22 -2.53
W1A 1 1.30 1.22 -0.79
W2 16 1.22 1.22 -11.91
W3 16 0.91 0.99 -7.21
W3A 16 0.91 1.20 -8.74
V1 16 0.46 0.60 -2.21
1st floor 1460.66
2nd floor 1460.66
3rd floor 1460.66
4th floor 1460.66
5th floor 1460.66
TERRACE 1 160.00 1.15 184.00
Lift Machine Room 2 14.88 2.54 75.59
OHWT 2 10.90 1.20 26.16
4 2.52 2.54 25.60
2 1.20 2.54 6.10
Dedut -2 0.99 2.13 -4.22
DEDUCTION -2 0.99 2.13 -4.22
DEDUCTION -2 0.91 0.99 -1.80
7610.54 SM

73 PLASTER OPEN COLUMN


GROUND FLOOR
CB1,CB7,CI1,CI7 8 1.22 2.73 26.60
CC1,CC7,CH1,CH7 8 1.22 2.73 26.60
CD2,CD6,CG2,CG6 8 1.06 2.73 23.11
CA3,CA5,CJ3,CJ5,CF5 8 1.06 2.73 23.11
CB3,CB5,CI3,CI5,CK3,CK5 8 1.22 2.73 26.60
CC3,CC5,CH3,CH5 8 1.22 2.73 26.60
CD3,CD5,CG3,CG5 8 1.06 2.73 23.11
CC4,CH4 4 1.36 2.73 14.82
CI4,CK4 2 1.22 2.73 6.65
CJ4 1 1.22 2.73 3.32
Lift Shear Wall 2 11.08 2.73 60.39
SW1 2 4.60 2.73 25.07
SW2 4 5.20 2.73 56.68
Stair-Case Flight 4 2.10 1.20 10.08
Stair-Case Landing 2 1.33 2.40 6.38
Stair Pardi 4 2.10 2.15 18.06
Stair Pardi 2 2.40 1.15 5.52
382.69 SM

74 FLOORING AREA AREA


1st floor 1 304.00 304.00
2nd floor 1 304.00 304.00
3rd floor 1 304.00 304.00
4th floor 1 304.00 304.00
5th floor 1 304.00 304.00
1520.00 SM
75 TOILET FLOORING AREA
1st floor 8 0.83 6.64
2nd floor 8 0.83 6.64
3rd floor 8 0.83 6.64
4th floor 8 0.83 6.64
5th floor 8 0.83 6.64
33.20 SM

76 BATH FLOORING AREA


1st floor 8 1.70 13.60
2nd floor 8 1.70 13.60
3rd floor 8 1.70 13.60
4th floor 8 1.70 13.60
5th floor 8 1.70 13.60
68.00 SM
77 GLEZED TILES DADO
Bath 1st floor 8 4.61 2.10 77.45
W.C 1st floor 8 2.89 1.22 28.21
105.65
2nd floor 105.65
3rd floor 105.65
4th floor 105.65
5th floor 105.65
528.27 SM

78 KITCHEN DADO
1st floor 8 2.25 0.65 11.70
2nd floor 11.70
3rd floor 11.70
4th floor 11.70
5th floor 11.70
58.50 SM

79 SKIRTING IN ROOM
1st floor
Room 8 50 400.00
STAIRE PASSAGE 2 17 34.00
434.00
2nd floor 434.00
3rd floor 434.00
4th floor 434.00
5th floor 434.00
TOTAL 2170.00 RM

80 WOODEN FRAME ON WINDOW


1st floor
W1 12 1.38 0.15 16.56
12 1.22 0.15 14.64
W1A 4 1.30 0.15 5.20
4 1.22 0.15 4.88
W2 32 1.22 0.15 39.04
32 1.22 0.15 39.04
W3 48 0.91 0.15 43.68
48 0.99 0.15 47.52
W3A 16 0.91 0.15 14.56
16 1.20 0.15 19.20
V1 32 0.46 0.12 14.72
32 0.60 0.12 19.20
Err:522 RM

2nd floor Err:522


3rd floor Err:522
4th floor Err:522
5th floor Err:522
TERRACE
Err:522 RM

81 POLISHED KOTAH STONE TAPPA


GROUNDFLOOR
TAPPA 14 1.2 0.25 16.80
RISER 16 1.2 0.18 19.20
36.00
1st floor 36.00
2nd floor 36.00
3rd floor 36.00
4th floor 36.00
5th floor 36.00
216.00 RM
82 POLISHED KOTAH STONE PASSAGE
kitchen below granite 8 2.8 0.6 13.44
PASSAGE 2 6.68 13.36
landing 2 2.4 1.33 6.38
33.18
1st floor 33.18
2nd floor 33.18
3rd floor 33.18
4th floor 33.18
5th floor 33.18
199.10 SM
83 GRANITE STONE FOR KITCHEN
1st floor
PLATFORM 8 2.25 0.65 11.70
VERT. SIDE PATTA 16 0.60 1.20 11.52
23.22
2nd floor 23.22
3rd floor 23.22
4th floor 23.22
5th floor 23.22
TOTAL 116.10 SM

84 TERRACE WATER PROOFING WORK AREA


CABIN 2 20.75 41.50
TARRACE 4 85.02 340.08
381.58 SM
85 TERRACE WATER PROOFING VATTA ON TEERACE FLOOR
Terrace Cabin 1 160 160
1 20.77 20.77
8 1.22 9.76
CB1,CB7,CI1,CI7 8 1.22 9.76
CC1,CC7,CH1,CH7 8 1.06 8.48
CD2,CD6,CG2,CG6 8 1.06 8.48
CA3,CA5,CJ3,CJ5,CF5 8 1.06 8.48
CB3,CB5,CI3,CI5 1 1.22 1.22
CC3,CC5,CH3,CH5 1 1.22 1.22
CD3,CD5,CG3,CG5 1 1.22 1.22
CC4,CH4 1 1.22 1.22
CI4 1 1.22 1.22
CJ4 1 1.06 1.06
232.89 RM
86 ALLUMINIUM SECTION
1st floor
W1 6 1.38 1.22 10.10
W1A 2 1.30 1.22 3.17
W2 16 1.22 1.22 23.81
W3 24 0.91 0.99 21.62
W3A 8 0.91 1.20 8.74
67.45
2nd floor 67.45
3rd floor 67.45
4th floor 67.45
5th floor 67.45
TOTAL 337.23 SM

87 DOOR / WINDOW FITTING (wood frame)


1st floor
D1 8 0.99 2.13 16.87
D2 16 0.91 2.13 31.01
D3 24 0.75 2.13 18.00
LIFT DOOR 1.4 0.80 2.00 1.12
1st floor 67.00
2nd floor 67.00
3rd floor 67.00
4th floor 67.00
5th floor 67.00
TOTAL 335.01 SM

88 BATHROOM SUNK WATER PROOFING


1st floor
BATH 8 3.43 27.44
WC 8 1.92 15.36
42.80
2nd floor 42.80
3rd floor 42.80
4th floor 42.80
5th floor 42.80
TOTAL 214.00 SM

89 BATHROOM & Chajja SUNK VATTA


Chajja
Lintel Level 8 1.60 12.80
8 3.51 28.08
8 1.60 12.80
8 1.54 12.28
Sill Level 12 1.60 19.20
Bath 4.61
1st floor 89.77
2nd floor 89.77
3rd floor 89.77
4th floor 89.77
5th floor 89.77
448.85 RM

90 WHITE WASH 2835.54


same as sandface plaster 2835.54 SM

91 Waterproofing Work for OHWT :-


Inside OHWT 2 2.40 3.05 1.00 14.62
Inner Side of OHWT 4 2.40 1.00 1.20 11.52
4 3.05 1.00 1.20 14.64
Outer Side of OHWT 4 3.35 1.00 1.14 15.21
4 2.70 4.49 1.14 55.04
111.02 SM

92 Waterproofing Vatta Work for OHWT :-


Inside OHWT 4 2.40 1.00 1.00 9.60
Inside OHWT 4 3.05 1.00 1.00 12.20
21.80 RM