You are on page 1of 1

CLEM7 TUNNEL

LEGEND
Northbound

GET STRAIGHT TO IT
Southbound
Tunnel Entrance/Exit
2
CLEM7 souTHBOUND
1 The CLEM7 will get you where you want to go
1 Entry from Lutwyche Road northbound
faster, safer and for less.
2 Entry from Lutwyche Road southbound
5
NORTH TO SUNSHINE COAST 3 Entry from Inner City Bypass eastbound The 6.8km CLEM7 will:
6 4 Entry from Inner City Bypass westbound
• Take you between Woolloongabba and
CLEM7 norTHBOUND Bowen Hills at 80km/hr in less than five minutes.
ST
WE
5 Exit to Lutwyche Road northbound • Bypass the Brisbane CBD
B
7 6 Exit to Lutwyche Road southbound
IC
• Avoid up to 24 sets of traffic lights
TO
H
RT
8 O
7 Exit to Inner City Bypass eastbound

N
• Reduce cross-city travel time by up to 30%.

D
OA
8 Exit to Inner City Bypass westbound

ER
TWYCHE ROAD NORTH

CH
Brisbane’s first road tunnel will link with five

LUTWY
existing major roads, including the Pacific
BOWEN HILLS

AD
3
Motorway, Ipswich Road, Shafston Avenue,

CHE RO
Lutwyche Road and Inner City Bypass.
ENTRANCE/EXIT

ICB EAST TO LU
SS
PA

LUTWY
Y 4
B
TY

I
C
R
AIRPORT

NE
IN
Bowen Hills Entrance / exit

LEGEND
CE
RA

Northbound
ER
ST

Southbound
UL
PA

Tunnel Entrance/Exit
ST

CLEM7 souTHBOUND
1 Exit to Shafston Avenue eastbound

CLEM7 norTHBOUND
2 Entry from Shafston Avenue westbound

Story Bridge

KANGAROO POINT
ENTRANCE/EXIT
1
SH
2 A
FS
TO
N
TUNNEL

TUNNEL

AV
E
Brisbane City N
UE

KANGAROO POINT Entrance / exit

LEGEND
Northbound
Southbound
Tunnel Entrance/Exit
SOUT

CLEM7 souTHBOUND
1 Exit to Pacific Motorway southbound
H EA

The Gabba 2 2 Exit to Ipswich Road southbound


Mater
ST F

Hospital CLEM7 norTHBOUND


REEW

3 Entry from Pacific Motorway northbound


AY

1 4 Entry from Ipswich Road northbound

A FEAT OF
ENGINEERING
WOOLLOoNGABBA The CLEM7 consists of two separate tunnels,
with one each dedicated for north-and-south-
ENTRANCE/EXIT
PA
C
I bound traffic.
FI

PA
C

C The main tunnels were excavated by two


M

IF
O

IC
massive tunnel boring machines that were
TO
RW

4
M

more than 260m long and 12.4m in diameter.


O

AY
TO
PA

RW

More than 11,000 people worked on the


CIF

3
AY
OAD
IC

design and construction of the CLEM7,


MO

which commenced September 2006.


IPSWICH R
TOR
WAY

WOOLlOONGABBA Entrance / exit


SOUTH TO GOLD COAST

You might also like