Professional Documents
Culture Documents
3 OPTIONS: Whole Building Energy Simulation ASHRAE Advanced Energy Design Guides Core Performance Guide
Points
1 2 3 4 5 6 7 8 9
-cont-
-cont-
-cont-
30% 32% 34% 36% 38% 40% 42% 44% 46% 48%
26% 28% 30% 32% 34% 36% 38% 40% 42% 44%
10 11 12 13 14 15 16 17 18 19
** Up to 2 additional points are available to projects that implement performance strategies listed in Section 3, Enhanced Performance. For every 3 strategies implemented from this section, 1 point is available.
OPTION 1: Develop and implement a measurement and verification (M&V) plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2) as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003. The M&V period must cover at least 1 year of post-construction occupancy.
Intent: To encourage the development and use of gridsource, renewable energy technologies on a net zero pollution basis.
http://www.green-e.org/energy