Professional Documents
Culture Documents
List of Equipments / Softwares Required For III and IV Semester Labs
List of Equipments / Softwares Required For III and IV Semester Labs
Sl No 1
Quantity 10
1 + 10 users
7. Equipments required for PC Hardware and Networking Lab (batch size : 20) 5 Groups of 4 students each
Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Name of the Equipment / Software PCs (Athlon, AMD, Intel) Digital multimeter External HDD and DVD Wrist band Printer, Scanner, Web camera Crimping tool Punching tool for I/O boxes LAN tester RJ45 connectors Cat 6 cable bundle Switches (8/16/32 port) Network Interface card (RJ 45) Network Interface card (Wireless) Wireless router MS-Windows OS (Client and Server) Linux