(From 15:00 Previous to 15:00 today) Date : 19 Month: 7 Year: 2011 Project name: TOPSIDE H4 STRUCTURE I.

MANPOWER Contractor PVC-MS Welders Cutter 29 26 Fitter 76 Helper 14 Scafolder PainterElectrical Other 6 0 2 2 Total 155 Accum. 258 Accum. 2 2 16

DAILY CONSTRUCTION SITE REPORT

II. MAIN EQUIPMENTS


Equipments Crane 30 ton Crane 50 ton Crane 250 ton Previous Today 4 1 1 4 1 1 Accumulate Equipments 8 2 2 UT machine MT machine Welding mach. Previous Today 1 1 8 1 1 8

III. ACTIVITIES
1. Cutting Description PL25 Plan 16 Today 13 Accumulate 156 Pl Tom. 10 Remark Total cut 156/ 226 pcs Remark PL12: W 6/10; PL 15: W 6/9 PL PL20: F 12/20, PL 25: F 0/15 Remark PL 12: 3/10 PL 15: 5/9 PL 20: 10/20 PL25 : 0/15 Remark

2. Fit-up (for flange/web plate connection) Description PL12: W 6/10; PL 15: W 6/9 PL PL20: F 12/20, PL 25: F 0/15 3. Welding for PL Description CD1-11/1+11/2, 18/1+18/2, 22/1+22/2 Plan 3 Today 3 Accumulate 8 Pl Tom. 5 Plan 2 Today 1 Accumulate 6 Pl Tom. 5

4. Assembly (for beams) Description Plan CD1-34, 22, 2 CD3-1 5. Test (UT, MT) Description CD1-3/1+3/2, 2/4+2/3, 35/3T+35/4T, 35/3B+35/4B, 44/3+44/4, 44/5+44/6, 11/1+11/2, 39/1+39/4 6. Painting Description 7. Assembly (for deck) Plan 3

Today 3

Accumulate 7

Pl Tom. 2

Today 8

Accumulate 14

Pl Tom. 3

Remark

Plan

Today

Accumulate

Pl Tom.

Remark

Page 1 of 4

Description

Plan

Today

Accumulate

Pl Tom.

Remark

8.Other activities Preparing for Automatic welding machine for CD1-10 Fabricating for Cellar Deck Conductor-Temporary stip

VI.Safety

Reported by Fabrication Team

Page 2 of 4

(From 15:00 Previous to 15:00 today) Date : 18 Month: 7 Year: 2011 Project name: TOPSIDE H4 STRUCTURE I. MANPOWER Contructor PVC-MS Welders Cutter 19 16 Fitter 54 Helper 10 Scafolder PainterElectrical Other 2 0 2 Total 103 Previous Today 0 0 8 8 1 1 8 Accum. 103 Accum. 1 1

DAILY CONSTRUCTION SITE REPORT

II. MAIN EQUIPMENTS


Equipments Crane 30 ton Crane 50 ton Crane 250 ton Previous Today 0 0 0 4 1 1 Accumulate Equipments 4 1 1 UT machine MT machine Welding mach.

III. ACTIVITIES
1. Cutting Description PL30: CD1-14:2, 21/2:2, 22/3, 34/2:2 PL25 Plan Today 8 0 17 Accumulate Remark/ Plan for Tommorrow PL25: CD1-07/3, 11/3, 39/2, 18/3, 26/2, 27/3, 27/4, 29/4, 31/2: 9 CD3-3/4, 3/5, 10/3, 10/4, 19/3, 19/4, 19/5: 7

PL12: CD3-02/1:2, 12/2:1, 12/3:1, 08/1:1, 23/2:1 5 2. Fit-up (for top/bottom/web plate connection) Description W: CD3-1/1+1/2, 12/1+12/2+12/3T& B: CD3-11/1+11/2, 20/1+20/2 CD1-21/1+21/2 3. Welding for PL Description CD1: 2/3+2/4, 43/3+43/4, 43/5+43/6, 41/1+44/2, 44/3+44/4 4. Assembly (for beams) Description Plan CD1-03, 01 CD3-21 2 5. Test (UT, MT) Description CD1-1/3+1/4, 1/5+1/6, 3/3T+3/4T, 3/3B+3/4B, 2/6+2/5, 29/1+29/2 6. Painting Description Plan 6 Plan Today 5

Accumulate Remark/ Plan for Tommorrow 5 Continouing CD320/1+20/1 CD1- 35/1+35/2, 27/1+27/2

Plan

Today 5

Accumulate Remark/ Plan for Tommorrow 5 3 CD1-2/1+2/2, 18/1+18/2, 43/1+43/2

Today

Accumulate Remark/ Plan for Tommorrow Continouing CD1-03, 01 2 4 CD3-21 Accumulate Remark/ Plan for Tommorrow 6 3

Today 6

Plan

Today

Accumulate Remark/ Plan for Tommorrow

Page 3 of 4

7. Assembly (for deck) Description Plan Today Accumulate Remark/ Plan for Tommorrow

8.Other activities Preparing for Automatic welding machine for CD1-10 Fabricating for Cellar Deck Conductor

VI.Safety

Reported by Fabrication Team