(NORTH ZONE)
Directions of Worthy Secretary HUD & PHED Conveyed to the XENs / P.Es Transparency in tendering process is to be emphasized in true spirit. Observance of SOPs be ensured. Tehsil Meeting with SDOs, Sub Engineers, CDO, CBOs & Community should be conducted. No Pipe should remain in unprotected & exposed position to avoid damage & weathering action. No trenches for sewer laying should remain without precautionary measure. Full Cooperation should be extended to the User Committees of the handed over water supply schemes by S/Es & CDOs for their operation & maintenance. 7- Directions for Chlorination of Water Supply Schemes should be conveyed to TMAs & Water User Committee 123456Sr. No 1 2 3 4 5 PHE Divsison/PMU LAHORE. Lahore Kasur Sheikhupura Daily Activity of XEN / Project Engineer Visited Urban Water Supply & Sewerage Scheme Raiwind with SDO & S/E. Office work. Visited Urban Sewerage Scheme Kot Abdul Malik with SE, SDO & S/E & Meeting with DCO, MNAs & MPAs regarding 4-Sector programme. Office work. Office work. Office work. Construction of Fully covered Nullah alognwith Managtanawala Road, Jala Pur Bhattian with SDO, S/E & CDO. Preparation for opening of Nullah Bhaid. Visited Rural Drainage Scheme Than Waday with SDO, S/E & CDO. Meeting with DCO regarding expected Chief Minister visit. Attended DCO office regarding payments of 25.000 Million package schemes. Laying of 500 mm i/d MS pipe between stage 7 & 5 in progress. Visited Rural Water Supply Scheme Dhamial with SDO, S/E & CDO. Attended Commissioner office, Rawalpindi regarding visit of Chief Secretary. Visited Water Supply Scheme Niromi Dhan with SE, SDO, S/E, CDO, CBM & Contractor. Visited Const: of Nullah & Sewer, Choa Saiddan Shah with SDO & S/E.
Nankana Sahib Okara GUJRANWALA. 6 Gujranwala 7 8 9 10 11 Hafizabad Sialkot Narowal Gujrat M.B. Din
16
Chakwal SARGODHA.
17 18 19 20
Visited Rural Water Supply Scheme 9/ML & Deowal with SE, SDO, S/E & CDO. Visited Rural Water Supply & Sewerage Scheme Gunjial with SDO, S/E & Contractor. Office work & visit of Comp: Water Supply & Sewerage Scheme Mianwali. Preparation of revised detailed estimate of Urban Sewerage Scheme, Jandanwala.
tions of Worthy Secretary HUD & PHED Conveyed to the XENs / P.Es. dering process is to be emphasized in true spirit. s be ensured. SDOs, Sub Engineers, CDO, CBOs & Community should be conducted. ain in unprotected & exposed position to avoid damage & weathering action. er laying should remain without precautionary measure. ould be extended to the User Committees of the handed over water supply schemes by the XENs, SDOs, eir operation & maintenance. nation of Water Supply Schemes should be conveyed to TMAs & Water User Committees.
Remarks
Expected Chief Minister visit. Request for posting of SDO, Pasrur. To resolve community dispute.
For community meeting. Contractor mobilized. Tender of flood affected schemes received on 2/11/2010. SDO Chakwal absent from Duty. S/Es of Urban Sewerage Scheme Chakwal transfered. Contractor mobilized to start work. Consturction of OHR in progress. Laying of 24" i/d sewer in progress.
12345678-
Sr. PHE No Divsison/PMU FAISALABAD. 1 2 3 Faisalabad Jhang T.T. Singh MULTAN. 4 5 Multan Sahiwal
Remarks
6 7 8 9
10 11 12 13
Bahawalpur Bahawalnagar R.Y. Khan S.S. R.Y. Khan Project D.G KHAN.
14 15 16 17 18
For post operation follow up Managed by T.M.A not by C.B.O. Pump house under construction