You are on page 1of 3

DAILY PROGRESS SHEET

(NORTH ZONE)

Directions of Worthy Secretary HUD & PHED Conveyed to the XENs / P.Es Transparency in tendering process is to be emphasized in true spirit. Observance of SOPs be ensured. Tehsil Meeting with SDOs, Sub Engineers, CDO, CBOs & Community should be conducted. No Pipe should remain in unprotected & exposed position to avoid damage & weathering action. No trenches for sewer laying should remain without precautionary measure. Full Cooperation should be extended to the User Committees of the handed over water supply schemes by S/Es & CDOs for their operation & maintenance. 7- Directions for Chlorination of Water Supply Schemes should be conveyed to TMAs & Water User Committee 123456Sr. No 1 2 3 4 5 PHE Divsison/PMU LAHORE. Lahore Kasur Sheikhupura Daily Activity of XEN / Project Engineer Visited Urban Water Supply & Sewerage Scheme Raiwind with SDO & S/E. Office work. Visited Urban Sewerage Scheme Kot Abdul Malik with SE, SDO & S/E & Meeting with DCO, MNAs & MPAs regarding 4-Sector programme. Office work. Office work. Office work. Construction of Fully covered Nullah alognwith Managtanawala Road, Jala Pur Bhattian with SDO, S/E & CDO. Preparation for opening of Nullah Bhaid. Visited Rural Drainage Scheme Than Waday with SDO, S/E & CDO. Meeting with DCO regarding expected Chief Minister visit. Attended DCO office regarding payments of 25.000 Million package schemes. Laying of 500 mm i/d MS pipe between stage 7 & 5 in progress. Visited Rural Water Supply Scheme Dhamial with SDO, S/E & CDO. Attended Commissioner office, Rawalpindi regarding visit of Chief Secretary. Visited Water Supply Scheme Niromi Dhan with SE, SDO, S/E, CDO, CBM & Contractor. Visited Const: of Nullah & Sewer, Choa Saiddan Shah with SDO & S/E.

Nankana Sahib Okara GUJRANWALA. 6 Gujranwala 7 8 9 10 11 Hafizabad Sialkot Narowal Gujrat M.B. Din

RAWALPINDI. Bulk Water 12 Supply Scheme Muree 13 14 15 Rawalpindi Attock Jhelum

16

Chakwal SARGODHA.

17 18 19 20

Sargodha Khushab Mianwali Bhakkar

Visited Rural Water Supply Scheme 9/ML & Deowal with SE, SDO, S/E & CDO. Visited Rural Water Supply & Sewerage Scheme Gunjial with SDO, S/E & Contractor. Office work & visit of Comp: Water Supply & Sewerage Scheme Mianwali. Preparation of revised detailed estimate of Urban Sewerage Scheme, Jandanwala.

DAILY PROGRESS SHEET


(NORTH ZONE) DATED: 03/11/2010.

tions of Worthy Secretary HUD & PHED Conveyed to the XENs / P.Es. dering process is to be emphasized in true spirit. s be ensured. SDOs, Sub Engineers, CDO, CBOs & Community should be conducted. ain in unprotected & exposed position to avoid damage & weathering action. er laying should remain without precautionary measure. ould be extended to the User Committees of the handed over water supply schemes by the XENs, SDOs, eir operation & maintenance. nation of Water Supply Schemes should be conveyed to TMAs & Water User Committees.

Remarks

Not feeling well. Scheme under test operation.

Expected Chief Minister visit. Request for posting of SDO, Pasrur. To resolve community dispute.

Meeting with community regarding investigation of source.

For community meeting. Contractor mobilized. Tender of flood affected schemes received on 2/11/2010. SDO Chakwal absent from Duty. S/Es of Urban Sewerage Scheme Chakwal transfered. Contractor mobilized to start work. Consturction of OHR in progress. Laying of 24" i/d sewer in progress.

ASSISTANT DIRECTOR (P&D) O/O CHIEF ENGINEER (SOUTH)


PUBLIC HEALTH ENGG DEPARTMENT LAHORE

DAILY PROGRESS SHEET


(SOUTH ZONE) DATED: 15/01/2011. Directions of Worthy Secretary HUD & PHED Conveyed to the XENs / P.Es. Transparency in tendering process is to be emphasized in true spirit. Observance of SOPs be ensured. Tehsil Meeting with SDOs, Sub Engineers, CDO, CBOs & Community should be conducted. No Pipe should remain in unprotected & exposed position to avoid damage & weathering action. No trenches for sewer laying should remain without precautionary measure. Work on energization of Electric connection by WAPDA be enhanced. Full Cooperation should be extended to the User Committees of the handed over water supply schemes by the XENs, SDOs, S/Es & CDOs for their operation & maintenance. Directions for Chlorination of Water Supply Schemes should be conveyed to TMAs & Water User Committees. Daily Activity of XEN / Project Engineer Office work / Tender Issue Office work Visited Rural water supply scheme 256/257-GB with SDO & Sub Engineer Assumed charge & Attended DCO meeting Attended office of Director Housing at Lahore as D.R against Mr. Shahzad Majeed Ex. Xen Sahiwal Visited Rural water supply schemeThatha Sadiqabad with SDO & Sub Engineer Assumed charge Attended Railway Headquarter at Lahore Visited Rural water supply scheme Basti Layallpur with SDO & Sub Engineer Office work / Tender Issue On Leave (Medical / due to Heart problem) Visited Urban sewerage scheme Khanpur with SDO & Sub Engineer Work on underwater sewer and treatment plant in progress Visited Urban sewerage & water supply scheme D.G Khan with SDO & Sub Engineer Visited Rural drainage scheme Kaki with SDO & Sub Engineer Visited Rural water supply scheme Bawbli with SDO & Sub Engineer Attended Audit team XEN Muzafargarh holding dual charge Inspection note will be submitted For estimate preparation For railway crossing permission of Urban sewerage scheme Borewala Staff quarter under construction Chairman CBO Mobile = 03458748824 (Anwar) OHR under construction Attended Audit team Rising main laying in progress Chairman CBO mobile = 0345-2020256 (Tariq)

12345678-

Sr. PHE No Divsison/PMU FAISALABAD. 1 2 3 Faisalabad Jhang T.T. Singh MULTAN. 4 5 Multan Sahiwal

Remarks

6 7 8 9

Khanewal Pakpattan Vehari Lodhran BAHAWALPUR.

10 11 12 13

Bahawalpur Bahawalnagar R.Y. Khan S.S. R.Y. Khan Project D.G KHAN.

14 15 16 17 18

D.G Khan Muzaffargarh Rajan Pur Layyah CRBC, DG Khan

For post operation follow up Managed by T.M.A not by C.B.O. Pump house under construction

ASSISTANT ENGINEER (P&D) O/O CHIEF ENGINEER (SOUTH)