Dated 10-12-2011

START UP SEQUENCE OF THE EQUIPMENTS OF GSSP PLANT


The GSSP plant must be started by following the start up sequence of the equipments as given below. 0102030405060708091011121314151617181920212223I.D blower F.D Blower Furnace Scrubbing pump Final Bagging Belt Production Belt Vibratory Screen Bucket Elevator Dryer Dryer Feed Belt Granulator Granulator Feed Belt Main Feed Belt Roller crusher Outlet belt Roller Crusher Roller Crusher Feed Belt Undersize Recycle belt Lump crusher outlet Belt Lump Crusher Lump Crusher Feed Belt Scrubbing Recycle Belt Rotary Valves Screw Conveyor

Prepared By: M.Aslam, Chemical Engineer

Approved By: M.Akram Malik, Production Manager