You are on page 1of 1

FAST-TRACK RAIL THE LATEST ROUTE REVISIONS

Extension to the north

10 miles

M42

Birmingham

M6

Coventry

The green tunnel - an opentopped cutting disguised with tree and hedge planting - past Chipping Warden and Aston Le Walls in Northamptonshire will be extended. A 500m continuous tunnel from Little Missenden to the M25, protecting the Chilterns, above, will replace two proposed shorter tunnels.

M40

Northampton

M1

Bedford

The route will curve to avoid English Heritage sites near Edgcote, including a 15thcentury battlefield and Grade I listed Edgcote House.

Milton Keynes

Phase one running by 2026 Manchester

Second phase running by 2033 Leeds

The green tunnel will be extended and deepened around the towns of Wendover and South Heath in BuckinghamOxford shire, reducing noise for local residents.

A new 2.75-mile tunnel along the Northolt Corridor in west London will reduce impact to homes around Ruislip.

M11

M25

CHILTERNS
Birmingham

M40

London Euston Heathrow

Heathrow

Euston

M4

M3

M25

You might also like