You are on page 1of 1

From: Sims, David C Sent;Thu ltAar 12:52:45ZO1e 11

;:rffl

ffiilf;"o'uV"",

Patrick waters, L; Frank; Sprasue, JonathanHort, D; ChartesFrazeile, A;

Cc: Guide,John Subject: Macondo Update lmportance: Normal Horizon at Macondo IJSSE: Goodwcck,no incidents. Operations sincelast ThuMay: . Squeezed shoe,performed 16" FIT to 12.55ppg EMW, ' cteaned rathole orr from l1,5g6'to r2,3-50r, rargc amounts sharc/marr of ca'ingsand high gas ' Dri'ed 14'3/4"x 16" holefrom 12,350' 10*,:os' witrr l |.9 ppg mud. Targer iep*r for l3-5/8" liner r.ras 13.500'. Took 38 bbl kick' shut in with 360 psi on casing, Attenrptto openfloar and checkDp pressure but drillpipe waspackedoffand stuck. Estimated porepressure kick zoneis 12 6 _ 12.7ppg. in Mobilized wireline tools and prepare proceduesand equipment kiil the well. to Ran 2'80'gauge ring and setdonn on crossover bet*cenHWDp and DCs ar 12,964,MD. Plan Forward: ' Ruu stuckpipe'/tentp to ide'tiS wheretlre log BHA is stuckor packedoff a'd to confirm that no florv exists in theannulus. Seta bridgc plug rn the BHA belorvthe stuck Doint Scvcrthe BHA abovethe stuckpoint Circulatethe influx out of tle annulususing the Driller,s Method Circulate weightrnud(est. 12.6 12,7ppg) kill Ccrncntthc opcnholc TesfBOPs Sidetrack Cost: Cunently $10MM over AFE. we will rikelydouble by thetime*e getbackto thisequivalent that deptb the sidetrack. on David Sims Drilling Bngineering Teanr Leader GOM Deepwatcr/DeepGas Explorationand Appraisal Work- 281-366-0J60 Mobile- 7t3-304-5600 Home- 2El-578-86_s3 Fa,x 281-366-3835 Mailto:simsdc@Bp.com

t
I

T
I

t
T
I
t

JOA,.)
tlxhibit No. Worldwide C,ourt ers, [nc.

TAL

BP-HZN-2 179MD100004560

I I
H

TREX-07097 EXHIBIT

You might also like