You are on page 1of 2

WEST KINGSTON POWER PARTNERS HUNTS BAY B 69KV SUBSTATION

Document Review Record Sheet


Job Number: Document Issued By: Document Title: Document Number:
1) 2) 3) 4)

146-27 SEL 69kV Protection panels See below

Page: 1 of 2

K-LINE INTERNATIONAL COMMENTS ARE AS FOLLOWS:


DRAWING 110092A06612010401-I, SHEET 01: DRAWING 110092A06612010402-I, SHEET 02:

A) No Comments
DRAWING 110092A06613010403-I, SHEET 03: DRAWING 110092A06612010404-I, SHEET 04:

A) Auxiliary contacts 1 & 2 are missing for disconnect switches 89-22A, 89-22B, 89-24A & 89-24B. Auxiliary contacts 7 & 8 are missing for disconnect switches 89-22A & 89-24B. B) In Note for (**) should be mentioned 89-L22CS instead of 52-22CS.
5) DRAWING 110092A06612010405-I, SHEET 05:

A) OUT107 to be wired to panel terminal for RTU signal B) Please, indicate in the table for OUT201 RTU signal C) OUT209 and OUT210 should be wired to relay SEL502 (XIN and YIN respectively) for 50BF initiation.
6) DRAWING 110092A06612010406-I, SHEET 06:

A) Relay SEL387L, the trip A03-A04 is not Spare. This contact is used on sheet 05 for transfer trip, please, improve indication in table. B) Element T1 of relay SEL387L is not used, but in the table is indicated Direct transfer, please, improve. C) Relay SEL387L, the trip B03-B04 should be used to initiate 50BF-24 on the relay SEL501, please, improve wiring and indications D) Input for T1 of relay (terminals 4RF.99 & 4RF.100) to be specified, if any.
7) 8) DRAWING 110092A06612010407-I, SHEET 07:

A) Early trip for coil 2 is missing


DRAWING 110092A06612010408-I, SHEET 08:

A) Terminals TB3.3, TB3.4, TB4.3 & TB4.4 of 89-L22 are used on sheet -404 too. B) OUT211 & OUT212 are spare
9) DRAWING 110092A0661201040-I, SHEET 09:

A) Breaker fail initiation on XIN (50BF initiation on 52-22) and YIN (50BF initiation for 52-24) are not as in the relay logical diagram HUB-01-08-002. Client (Ansel) should review the scheme and propose the solution as in the existing substation.
K-Line International (Canada) Ltd. HUB-DocReviewSEL 2011-11-07/1

GENERAL NOTE:

1. Each SCADA point (S-1 through S-16, C1 through C6, A-1 through A20) as per attached List of Communication Points, HUB-01-06-004, to be marked on these drawings

Prepared by: Boris Mirkovic

Date: November 07/2011