Details of the structural, geotechnical and foundation systems are to be designed by Qualified Persons.
100
50
GAP TO BE FILLED UP WITH CEMENT MORTAR (1: 3)
R.C. SLAB
100
R.C. SLAB
1:40
EQ
1:40
50
20
EQ
MASS CONCRETE
BENCHING
OF THE DRAIN
< 3.0m
> 3.0m TO 4.5m
REINFORCED CONCRETE
1:30 FALL
1:30 FALL
1 1:
1 1:
U-DRAIN
BOX CULVERT
NOTES:
1 EXPANSION JOINTS SHALL BE PROVIDED AT MAX. 35m INTERVALS AT THE BASE AND WALLS
OF ALL CAST-IN-SITU DRAINS. SUCH JOINTS SHALL HAVE A GAP OF 13mm PACKED WITH AN
ALL PRECAST UNITS SHALL BE LAID CLOSE. THE MAXIMUM ALLOWABLE GAP IS 50mm. ALL GAPS SHALL BE FILLED WITH 1:3 MIX CEMENT MORTAR.
3
100
4 5
REINFORCED
CONCRETE
MAIN REINFORCEMENTS SHALL HAVE MINIMUM CLEAR COVERS OF 70mm. (WATER FACE) AND 50mm (EARTH FACE)
DRAWING NO . 3
HANDPITCHED HARDCORE ALONG THE WIDTH (SEE TABLE)
10
THE CONSTRUCTED DRAINS SHALL NOT CAUSE PONDING AT THE EMBANKMENTS OF U-DRAINS & TRAPEZOIDAL DRAINS AND AT THE TOP SLAB OF BOX CULVERT.
1:30 FALL
1 :1
1:30 FALL
11
IN THE DESIGN OF U-DRAINS, UPHEAVE MUST BE CONSIDERED. THE WALLS OF U-DRAINS SHALL BE DESIGNED TO WITHSTAND A LIVE LOAD SURCHARGE OF 10 kN/m ON THE BANKS.
2
12
IN THE DESIGN OF TRAPEZOIDAL DRAINS, STABILITY OF THE SLOPE AND UPHEAVE MUST BE
2 CONSIDERED. A LIVE LOAD SURCHARGE OF 10 kN/m ON THE BANKS SHALL BE TAKEN INTO ACCOUNT.
13
(PILING AND FOUNDATION DETAILS TO BE DESIGNED BY QP.)
FOR DRAINS THAT ARE ADJACENT TO ROADS AND ARE AFFECTED BY VEHICULAR LOADING, A LIVE LOAD SURCHARGE OF 20 kN/m SHALL BE TAKEN INTO CONSIDERATION IN THE DESIGN OF DRAINS.
2
14
BOX CULVERTS SHALL BE DESIGNED TO WITHSTAND BRIDGE LOADING IN ACCORDANCE WITH LAND TRANSPORT AUTHORITYs STANDARDS.
TRAPEZOIDAL DRAIN
15 ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.
DRAWING NO. 1