You are on page 1of 1

i

No.

Description ofActivity

Controlling Procedure/ Doc,

Specification Acceptance Criteria

QA/QC Record to be used to verify Compliance Subcon

Inspection Point Contractor Company

Comments/Remarks

8
8.1 8,2

INTERNAL PIPING CONNECTIONS

Fit-up inspection ofpipe to pipe, pipe to fittings joint Visual inspection ofpipe to pipe, pipe to fittings weld joint Magnetic Particle Examination orLiquid Penetrant Examination of permanent attachment welds and temporary attachment weld removal areas on Group IV,IVA, V and VI materials

IFC Drawings IFC Drawings

IFC Drawings IFC Drawings

Visual Inspection Report

H H

W/S

8,3

API 650

API 650

MT/PT Report

W/S

Delete No. 8.3, MT or PT of permanent attachment welds and temporary attachment weld removal areas on Group IV, IVA, V and VI materials are applicable for Shell Plates only as per API 650, Sec. 7.2.3.5.

,}