Professional Documents
Culture Documents
Control Number: Req. Group: Sign: Name: Approved By: Modal Analysis, Structral Analysis
Reviewed By:
Requester By:
Analysis Detail Specifications : Sr. No. 1 2 3 4 5 6 7 8 9 10 Part / Component Details Sr. No. 1 2 3 4 5 6 7 8 9 10 11 Sr. No. 1 2 Expected Target Schedule (Target Date ): Acceptance by Engineering Services SCHEDULE Dates Start Finish CONTROL NUMBER Details of Testing Details of Parts Aggregate Oil Filter Part Name Specific Boundary Conditions Aggregate Size Modulus Of Elasticity(GPa) Density(g/cm3) Material Properties Poisson's Ratio Yield Strength (MPa) Tensile Strength (MPa) Displacement Constraint Applied Acceleration Applied Force/Torque Pressure/Temp Others
Please Attach Separate sheet for Additional Details, If Required Specifications 75 2.75 Material: EN AC 46000 140 240 Remarks
Please Attach Separate sheet for Additional Details, If Required Procedure / Conditions
Actual Work Iteration No. Start Date Finish Date Analysis Request Closure Analysis Reports Handed Over to (Name) Sign : To C&T: 1 2 3