You are on page 1of 19

JOB SAFETY ANALYSIS (JSA) TANK REPAIR WORK

JSANumber: Area: TaskDescription Step 1. Activity Sitepreparation

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard
Poorcommunication betweenworkparties. Inexperiencedpersons/lack ofsafetyawareness Heatstress Noise

JSATitle: Activity:

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

Uncontrolled Risk ControlMeasures H M L M DESCONemployeesshallhavemandatorytraining.

ResidualRisk H M L L

VehiclesMovement

Workpermitfromtheclient,withallconcurringpartiessignatures approvalmustbeobtainedpriortostartofworkanddisplaywork permitatsite Safetyrequirementsstatedontheworkpermitmustbeavailableonsite andstrictlyfollowed Toolboxtalkshallbeconductedtoallpersonnelonsite&documented beforestartofwork. AppropriatePPEshallbewornbyallpersonnelatsite. AssignedtraineddedicatedBanksmanforjobwithreflectivejacket. Nowaternoworkpolicyshallbefollowed. WorkScheduleaccordingtoheatIndex Earprotectionshallbewornwhererequired. Noisemeterwillbemadeavailableatsite. Maintenanceofequipmentonregularbasis. Useofwelltrainedlicenseddrivers. Vehiclemovementsonsiteshallbecontrolledbybanksmanandspeed limitsaretobefollowed. Appropriatesignagetobeprovided.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step 2.

DESPRLK.KJSA002
KorangiandKeamariPRLTanks

JSATitle: Activity:

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

Activity Hazard Transportationof Failureofequipment Shellplate&Misc /crane/Trailer/Pickup/ Tanksmaterialsfrom Trucketc yard/storeware Roadtrafficaccident housetoWork duringtransportationof location Tanksshellplatesand ByUsingCrane othermaterial. ,Trailer,BoomTruck Pickupetc Bodypartinjuryduring loadingandunloading operation

Uncontrolled Risk ControlMeasures H M L M ConducttoolboxtalkandLMRApriortostartofworkatthe specificlocation. Ensuresatisfactoryconditionofequipment,properly inspected,stickerPlacedandforappropriatecolorcode. Allrigginggearshallbecertified. Syntheticbeltornylonslingshallbeusedinsteadofsteel wireropeforholdingofmaterial. Ensurecraneoperatorsandriggersfullyunderstandallwork tasksandhazards. Loadshallbesecuredonthetrailerbedtoprevent accidentalfall. Craneoperatorshallhavethethirdparty,certifiedand applicablelicense. Usepropertaglineduringloading/offloadingmaterial. AccessrouteshallbesurveyedbeforetransportingtheShell Plates,pipes&supportmaterialetc. Barricadewithappropriatesignboardontheeffectivearea. Riggersshallbeexperiencedandthirdpartycertified.

ResidualRisk H M L L

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Pinchpoint. Vehiclehittheexisting facility .

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Useleatherglovesforhandprotection. Keepawaybodyparts(hand,feet,head,etc)fromtheline offire(LOF). Suitablelengthoftrailershallbearrangedaccordingto lengthofShellPlates,pipespools,supportsetc. Redflagatthebackendoflongpipespoolshallbe provided. Sitespecifictrafficrulesshallbefollowed. Allvehiclemovementswillbecontrolledbyacertifiedbanks man. Banksmanshallbeprovidedforreversingvehicle.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step 3.

DESPRLK.KJSA002
KorangiandKeamariPRLTanks

JSATitle: Activity:

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

Activity (A)Bolting,Unbolting, removaloftankman holecoverandbolts etc. (B)Manwayand boxup.

Uncontrolled Risk Hazard H M L Heavy spools may slip and H fall on employees feet/legs Falling of bolts/nuts from height and usage of damaged /non-standard tools HandInjury Pressurizedequipments Fallingofperson DamagestoGasket, threadsofboltsand seat. Riskofboxupwithout Finalclearancefrom PRL

ControlMeasures

ResidualRisk H M L L

UseChainblocksandlowertoground. Oneendofthechainblockstobeengagedtohook provided. Usecorrectsizespannersandkeepthebolts/nutsinabag andtietheotherendofspanners/toolswithanylonropeto asupporttoavoidfallingwhileinuse. Ensurethatblindwastieoffwithropeorprotectedagainst fallonperson.. Usechainblocks,engagethecover/blindtothehook. Transfertheentireloadtothechainblocks,remove remainingboltsandlowertheblindtotheground. ShifttheBlind/covertosafeplaceawayfromthetank. UseproperPPEs(gloves) Makesurethatequipmentwillbedepressurizedbefore startofactivity,countercheckwithareaauthority. Useharnesswhileworkingatheightand100%tiepolicy mustbefollowed. Horizontalliftingatalltimesafterplacingthenewgasketto

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Overtensioning Fallingofmaterialsand usageofdamaged /nonstandardtools

JSATitle: Activity: Uncontrolled Risk H M L H H

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L L

bedone. Ensuretestedandcertifiedchainblocksandslingsareused. Obtainboxupclearancefromprocess,inspection,operation andmaintenance Followstamicarbontensioningprocedure. Usecorrectsizespannersandkeepthebolts/nutsinabag andtietheotherendofspanners/toolswithanylonropeto asupporttoavoidfallingwhileinuse. Allpersonnelworkinginconfinedspacemusthave confinedspacetraining. PRLconfinedspaceprocedureshallbefollowed. Holewatcherisattentiveallthetimeduringconfined spaceactivity.LightingprovidedinCSEtobe24V. Easycommunicationbetweenholewatcherandsupervisor isestablishedallthetime. Ensurethatpassageandtransportroutisclearduring confinedspaceactivities.Properaccess/agreesshouldbe

4.

Confinedspaceentry.

LakeofCommunication Ventilation. Damagematerial

Oxygendeficiency

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard accumulationoftoxic gases

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Physicalhazards

Improperstackingof material

maintained. GastesttobedonebyAGTpriortoenteringintothe confinedspace. Atrainedandqualifiedindividualshouldoutsidethetank withtheresponsibilityofensuringthesafetyofauthorized entrants(Fabricator,Fitter,Weldere.tc)throughthe performancepreentrybriefing,checkingandinspecting PPE,equipmentandtoolsandperformingregular monitoringinensuringpersonworkinginsidepiperemains safeforentryandoccupation. Awrittenrescueplanthathasprovisionforconductinga timelyrescueofindividualsworkinginsidethepipe (ConfinedSpace)shouldbekeptonsite.Raisingthealarm intheeventofanemergencyusingtheradio/mobile phonesprovidedtothem. Ensureeffectivecommunicationsystemsfortheentryare tested. Properlightshouldbeprovidedlessthan25v. Allmaterialstackproperandcategorywise.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Unauthorized entrant

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

5.

Lifting/installation/ ofShell,roofand bottomplates,Pipe spools,supportsetc byUsinglifting equipmentscrane, trailer,boomtruck, chainblock,sling shackles)

Failureofequipment.

Fallofobjects/ Swinging.

Rescuearrangementshallbemadewhileworkingmore thanfivemeterinsidelargeboresize. PRLSHE&SProcedureshallbefollowed. Closesupervisionrequiredwhileworkinginside. Executetheworkunderclosesupervisionandpresenceof holewatcher. Properairsupplytobeprovidedorairmoverwillbe provided. Properventilationshallbethere. Workingcrewshellbetrainedforconfinedspaceworking. Certifiedandcolorcodedliftinggearstobeused. Equipmentshallbeinspectedpriortousebycompetent person. Competentandcertifiedoperatorandrigger&HiVisjacket fortheRigger. Barricadetheliftingarea/swingradiusandplacesafety cautionboards. Ensurethattheloadisadequatelysecuredandfixedtothe

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Overloading.

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Fallingfromthelifting beam.

Breakageofslings Unplannedlift Improperlifting techniques

hook. Thesafetylatchonthehookmustbecorrectlyclosed. LiftwithinSWL(Safeworkingload). Usetaglinestocontroltheliftingload. Supportstowhichliftinggearsareattachedshallbestrong enoughtowithstandtheliftingload.Andcertifiedby3rd party. Donotleavetheloadsuspended. Neverstand/walkon/underliftingload. Approvedliftingplantobefollowed. Experiencedhoist/craneoperatorshallbeassigned. Useproperliftingtechniques. Securealltools/objects.Useappropriatehandgloves. Allpersonnelworkinginconfinedspacemusthaveconfined spacetraining.Obtainconfinedspaceentrypermit. PRLConfinedspaceprocedureshallbefollowed. Holewatcherisattentiveatallthetimeandestablishgood

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Physicaland atmospherichazards.

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

6.

HotWorkActivity Welding,Cutting grinding,

ConfinedspaceHazards (InsideTanks). Oxygendeficiency Sparks/fire, H Electricshock,burnand explosioninside confinedspacewhile

communicationduringconfinedspaceactivity.Lighting providedinCSEtobe24V. Adequateventilationtobeprovided. Easycommunicationbetweenholewatcherandsupervisor isestablishedallthetime. Ensurethatpassageandtransportroutisclearduring confinedspaceactivities.Properaccess/agreesshallbe maintained. NotifiedtotheERT(EmergencyResponseteam)priorto starttheactivity. Worktobeexecutedunderclosesupervisionatalltimes. GastesttobedonebyAGTpriortoenteringintothe confinedspace. L

Weldinghabitatshallbeprovidedateachwelding/grinding location.Fireblankettobecertified/approved. Allinternalcombustibleenginesshallhavevalidinspection sticker.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard fitting,tacking, grindingetc.

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Activity UsageofPower brushforinternal cleaning,electrical Grinding,drill machine,Cuttingset etc, Usageofgas cylinderfor preheating. Repairworkof

Contactwithelectricity. MechanicalHazardsof Grinderetc

existingtanks, Removal / Erection ,shell bottom & roof plates,including removalofexisting structureandpipes spools / nozzles and stair etc

Eyeinjury Firehazards ElectricalShock /Hazards

Keepfireextinguisherstandby. Barricadeworkareaandplacethepropersignboards. Allpersonnelworkinginconfinedspacemusthaveconfined spacetraining. PRLconfinedspaceprocedureshallbefollowed. Provideproperrespiratorypersonnelprotectiveequipment. Properearthlingshallbeprovidedfortheelectrical equipment. GrindingandcuttingdisctobeasperRPMratiowith machine.Andmakesurethedatesofcutting/Grindingdisc arenotexpiredandnodamage. Grinding/Cuttingmachinewithdeadmanswitch. Faceshieldmustbeusedforcutting/grindingactivity. Areashallbefreefromcombustible/flammablematerial. Firewatchershallbeplacedforoverheadworking. AllElectricalequipmentshallbeinspectedandcolorcoded. (I.e.Cords,Plugsetc).

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Cylinderstorage.

Fallingofgascylinders Damagedhosecauseof gasleakage

Allportableelectricalequipments/cablesshallbeapproved declaredsafetouse.Allelectricalequipmenttobe groundedproperly. Ensureelectricalcablesareprotectedfromwater/spilled liquid UsecorrectPPEs(Leathergloves,SafetyGlassesforthe task). Ensureallcylindersaresecuredandcappedwithmetal chaininappropriatetrolleys. Protectivecovershallbeinplacewhilecylindersnotinuse. Gascylinderstobesecuredcorrectlyduringtransportation. Gascylinderssecuredverticallyandprotectedfromdirect sunlight/heat,greaseandanyoilyitems. Alwaysusetrolleytoshiftthecylinders. CylinderkeyshallbekeptwithCylindersandvalvecapplace afteruse. Ensurethatcylinderhosesdonotcomeincontactwithhot surface/greaseoilysubstance.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Backfire/fireexplosion

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Manualhandling/ Pinchpoints. Shiftingofmaterial Handinjury duringjob.

DonotiethehoseswithGItiewire. Ensurehosesareingoodconditionandwellguardedagainst anypossiblerunoverbyvehiclesorpossiblematerial transfer Allgasblowinghoses/weldingtorchesshallbeprovidedwith flashbackarresterand(NRV)nonreturnablevalve. Pressuregaugesshallbeinworkingconditionandno damage. Gascylindershallbestoredseparately.Oxygenand acetyleneseparately. Allpersonnelworkinginconfinedspacemusthaveconfined spacetraining. PRLconfinedspaceprocedureshallbefollowed. ToolboxtalkwillbeconductedbySupervisor. Supervisorwillberesponsibletocompletesafeactivitypre Checklistsheetdailybeforestartofwork. UseappropriatePPESasperjobrequirement. Maintaingoodhousekeepingtoavoidinjuries.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Dropofmaterial. Keepingloadawayfrom body Muscularskeletaldisease, Backpain Liftingbybendingback Liftingunmanageable load

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Planbeforemanuallifting Usemanualhandling/liftingAidsliketrolleyetc. Ensurenoobstructionatjobpoint,access/egress Whenlongperiodofmanualhandlingisrequired,give appropriatebreaks. Keeptheloadasclosetobodyaspossible. Movefeetratherthantwistingbackduringmanual handling. Avoidwearingtightclothingwhichmayrestrictbody movement Ensurestronggrippingduringmanualhandling Bendyourkneesandnotbackduringmanualhandling/ lifting Uselegsathepivotpointtoraiseorlowerbodywiththe backstraightenedwhenliftingorloweringload Shouldersshouldbekeptlevel. Lookahead,notdownattheload,onceithasbeenheld

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard Exhaustion/Fatigue

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

7.

Inspections(NDT) PWHT,Radiography

Inexperienceperson Radiation

Chemicalhazard

securely. Materialhandlingtoolsorequipment,suchasbarrowsand trolleys,shouldhavehandleheightsthatarebetweenthe shoulderandwaist. Suchtoolsorequipmentshouldbewellmaintained,with wheelsthatrunsmoothly. Assistanceshouldbeprovidedtohandlersnegotiatinga slopeorramp. Loadsshouldtraveloverasmooth&evensurface. Onlytrainedandcertifiedpersonneltobeallowedto performingofNDTactivities. PersonaldosymeterforallinvolvedinRadiographyactivity. Certified,Calibratedandproperlytaggedequipmentstobe usedforNDT.Colorcodingtobeverified. NootherpersonallowedtoenteringinNDTtestingarea. Areatobebarricadedwithsignboard.Exclusivezoneasper procedure. Supervisortoconfirmthattestperformerisinfully

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Activity

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

Hazard Personnelinjury. Fire Electricalshock

ControlMeasures

ResidualRisk H M L

PWHT/Preheating Byusingdirectflame/ Electricheating

8.

Minormaintenance work,Connection /Disconnectionand OperationofDiesel Generatorset/ Weldingmachines /ovens/Distribution boards/grinderfor powersupplypurpose includingrepairwork.

Fire/Explosion Sparks.

Spillageoffuel/Oil

ElectricShock

protectedclothingandequippedwithallnecessaryPPE, followallrequirementofNDTasperprojectspecification. ProperPPEshallbeused. Fireextinguishershallbeprovidedatsite. Electricboardshallbeinspectedbyqualifiedelectrician priortouse. Whenelectricmaintenanceorrepairworkisrequired assignedatrainedelectricianforthejob. Colorcodedelectrictoolsshallbeused. Obtainallnecessaryapprovalspriortostartthejob. Standbyfireextinguisher/Firewatcher. Barricadethearea. SWITCHOFFDG(Dieselgenerator)ifanyemergencyalarmis sounded.Switchofftheenginewhilefueling. Fuelingwillbedoneindaytime. Ensurenoconflictingjobsinvicinitybeforestartofjob. DGmusthavePRLinspectionsticker.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

Workingduring extendedhour/night

Inadequatelightingin andaroundworkareas, causingshadowsor poorlylitworkareas thatcouldresultin unsafeactsandinjuries takingplace PoorCommunication

10

EmergencyProcedure /Response

Ensurealllightsareintrinsicallysafeandarepreinspected. Closesupervisionduringactivity. Onlycompetentelectriciantoperformthejob. Properearthingshallbeprovided. AdequatelightingatworkareaandAccess/Egressarea. Emergencyroutetomusterpointtobeclearlyilluminated. Propercablemanagement Useclearsafetyglassfornightworkforgoodvisibility. WarningLightsandsignboards. TrainedFlagmanforequipmentmovementprovidedwith signaltorch. Closesupervisionrequiredwhileworkinginnightshift. EducatetheworkforceaboutEmergencyProcedure. Allsafetysignboardshallbedisplayedproperlyatsite. IncaseofanyEmergencyallworkwillbestopped,Shut downallrunningequipment&Machineriesandreportedto MusterPoint

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

JSANumber: Area: TaskDescription Step Activity

DESPRLK.KJSA002
KorangiandKeamariPRLTanks Hazard ImproperAccess/Egress

JSATitle: Activity: Uncontrolled Risk H M L

TANKREPAIRWORK
ErectionandrepairworkofTanks Date 05/12/2012

Repair work of existing tanks, bolting, unbolting, removal / erection of shell bottom & roof plates , including removal of existing structure and pipes spools / nozzles , stair and NDT Radiography work

ControlMeasures

ResidualRisk H M L

11. Housekeeping

Tripsandfall

SharpObjects

Equipmentdamage

ProperAccess&Egressshallbeavailable. AllWorkforcesshallknowtheMusterPointlocation. PRLEmergencyProceduretobefollowed. Emergency#00000000 PRL Medical#00000000 Allwastegeneratedshallbecontainedanddisposedoffin designatedwasteskips. Donotstorematerials/equipmentsinsidetheplantarea. UseProperPersonalprotectiveequipmentforhandlingof waste. Allmaterialsshallberemovedfromthesitetoasafe storagelocationimmediatelyafterthework.

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

Approved_____________________________________________________________ SignaturePrintDate PerformingParty____________________________________________________________ SignaturePrintDate

JOB SAFETY ANALYSIS (JSA) TANK MODIFICATION AND REPAIR WORK

You might also like