20.12.12 Sub.

: - Preservation of Utility steam Boiler Present System: - Presently there are two modes of power plant operation: -

1. 5 GT +5 HRSG+ 1 Boiler 2. 4 GT + 4 HRSG + 3 Boiler +1 STG The operation of either option is based on fuel price and the condition of availability of equipment. During the first mode of operation three boilers will be idle and in the second mode of operation one Boiler remains kept idle while the other three are in service. Constraint: As per the standard practice, if the boiler is kept idle for more than one week the preservation of boiler is must to avoid any corrosion from inside the water tube. But in present system the preservation of boiler is not possibly due to non-availability of separate hydrazine dosing system. Proposed System: It is proposed to provide one trolley mounted pump along with dosing tank, by which the preservation of any boiler can be done. The detailed sketch is attached herewith.
Put up for approval please.

Proposed Scheme for Hydrazine Dosing

LG

Hyd. Dosing Tank for Boilers Cap. - 100 Lit. Ejector

To BLR SH HDr

Sampling line

From Boiler Bottom HDR

Hyd.Dosing Pump

PG

Material Required: Dosing tank SS 304 with 100 Lits. Capacity and one gauge glass. Centrifugal Pump 01 with discharge press. 10.0 Kg/Cm2 and discharge capacity 10 MT/hr. Inlet Line Size- 1 with flange joint type . Discharge Line size- 1 with flange joint type Approximately length of pipe 20 Mts. Isolation valves: - 5 nos. size- 1

You might also like