Annexure-I 4a) Chirang (bifurcated from Bongaigaon)

1.

Summary of projects of Chirang (Assam) district approved by the 49 th Empowered Committee meeting held on 19/09/2011:
Sharin g ratio Total No. of Unit Unit cost Central share State share Total cost Central share released as a 1st installment Exp. as per QPR/UC Central share released as a 2nd installme nt Exp. as per QPR/UC Phycial Progress Status of UCs

S. N o.

Name of the project for

Rupee in lakh Administrative Approval 1 Installation of hand pumps Set up tube wells Tara 90:10 257 0.2480 57.3624 6.3736 63.736 28.6812 (12.12.11) 63.5135 (12.12.11) 21.825 (12.12.11) 234.684 (12.12.11) 45.5647 (12.12.11) 394.2684 0 Not released Not released Not released Not released Not released 0 Nil 100% UC required 100% UC required 100% UC required 100% UC required 100% UC required

90:10

987

0.1430

127.0269

14.1141

141.141

Nil

Construction of IAY houses Construction of ACRs in high and higher secondary schools Construction of toilets in schools Total

90:10

100

0.485

43.65

4.85

48.50

Nil

90:10

159

3.28

469.368

52.152

521.52

Nil

90:10

263

0.385

91.1295

10.1255

101.2550

Nil

788.5368

87.6152

876.152

2. Summary of projects of Chirang (Assam) district approved by the 51st Empowered Committee meeting held on 25/11/2011:
S. No . Name of the project for Sharin g ratio Total No. of Unit Unit cost Central share State share Total cost Central share released as a 1st installment Exp. as per QPR/UC Central share released as a 2nd installmen t Exp. as per QPR/UC Phycial Progress Status of UCs

Rupee in lakh

Administrative Approval 1 Construction of Anganwadi center Total 100:00 78 78 6.34 6.34 494.52 494.52 494.52 494.52 247.26 (21.12.11)_ 247.26 0 Not released 0 Nil 100% UC required

3. Summary of projects of Chirang (Assam) district approved by the 52 nd Empowered Committee meeting held on 29/12/2011:
S. No . Name of the project for Sharin g ratio Total No. of Unit Unit cost Central share State share Total cost Central share released as a 1st installment Exp. as per QPR/UC Central share released as a 2nd installmen t Exp. as per QPR/UC Phycial Progress Status of UCs

Rupee in lakh Administrative Approval 1 Construction of AWCs 100:00 38 6.34 240.92 240.92 120.46 (30.12.11) 260.00 (30.12.11) 380.46 0 Not released Not released 0 Nil 100% UC required 100% UC required

Construction of ITI with hostel at Amguri Total

100:00

520.0 0

520.00

520.00

Nil

760.92

760.92

4. Summary of projects of Chirang (Assam) district approved by the 54 Empowered Committee meeting held on 21/2/2012 :
S. N o. Name of the project for Sharing ratio Total No. of Unit Unit cost Central share State share Total cost Central share released as a 1st installmen t 23.3.12 Exp. as per QPR/UC Central share released as a 2nd installmen t Exp. as per QPR/UC Physical Progress Status of UCs

Administrative approvals 1 Construction of IAY Total 90:10 40 40

Rs. in lakh 0.485 0.485 17.46 17.46 4.94 4.94 19.40 19.40 8.73 8.73 0
Not released 0 Nil 100% UC required

Approvals during 12th Plan (2012-13)


Summary of projects of Chirang, (Assam) district approved by the 57th Empowered Committee held on 23.8.2012.
S. No. Name of the project Sharing ratio No. of Unit Unit cost Central share State share Total cost 50% as 1st installment to be released 31.08.12 99.90

Installation of direct action Tara hand pumps Total

90:10

888

0.25

199.80

Rs. In Lakhs 22.20 222.00

888

0.25

199.80

22.20

222.00

99.90