You are on page 1of 73

1 .......................................................................................................1 2 The Establishment of the National Engineering Research Center for Offshore Windpower.....................................................................................

4 a) Positioning of the National Engineering Research Center for Offshore Windpower.................................................................................................4 b) Team building of the National Engineering Research Center for Offshore Windpower............................................................................................6 3 .....................................................................................10 1 ...............................................................10 1.1 Organization..........................................................................10 1.2 Construction of Bases....................................................................13 1.3 Construction of Testing Platform..........................................14 b) .....................................................15 2.2 The research and development projects undertook by Engineering center.............................................................................17 c) ................................................................................20 3.1 .......................................................................................20 3.2 Personnel training....................................................................................21 d) .....................................24 4.1 Radiation and diffusion capability of technology achievements.........................................................................................24 4.3 ...................................................................................27 Figure 3-2 Name of applied basic technical achievements transformation.........31 4.4 ...........................................32 e) ................................................................................35 5.1 Open Services................................................................................35 5.2 Personnel training....................................................................................36 5.3 Academic communication.............................................................36 f) ............................................................37 6.1 Organizational structure............................................37 6.2 .............................................................................................................46 6.3 operation system..................................................................................48 4 3 ...................................................................50 1 ............................................................................50 1.1 ...............................................................50 1.2 Strengthen applied research market adaptability..............................................................................................................51

1.3 To further strengthen international exchanges......52 b) three-year development plan for the future....................52 2.1 3 next three years construction and development planning.............................................................................................52 2.2 3 The next three years of technical development path .................................................................................................................................55 5 .......................................................................................................................59 6 ...................................................................................60

1
( ) ( ) 9 2004 4 9 2006 6 28 National R&D Center for Offshore Wind Power was established based on CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd. Haizhuang is a CSIC company doing strong in wind power equipment R&D, fomerly Chongqing Haizhuang Technology Development Corp. By the end of 2012, Haizhuang's total asset reached 6 billion RMB level. 2MW 2.5MW 850KW 5MW By introducing and innovating European technology, Haizhuang currently has a product serie contains 850KW, 2MW, 2.5MW and 5MW with different type which could satisfy different climate and geographic conditions. Off-grid and micro-grid system are also Haizhuang's products.

Being the largest shipbuilding group in China, CSIC's national-level labs for offshore engineering has enable Haizhuang with unique advantages in key offshore wind related technology as currency analysis, typhoon alerting and forcasting, offshore installation, etc.Strong intergration of CSIC offshore forces is significantly supporting Haizhuang with the strongest capability in offshore wind in China. 95%
1

) (

Many of worldwide mainstream turbine manufacturer were formerlyWind doing shipbuilding as turbines' core structure is similar to vessels. In this perspective, CSIC has excellent advantages of turbine supply chain. Currently, CSIC could manufactur the turbine components by 95% inside the group. As the leading wind company in CSIC, Haizhuang has the key technology of turbine components. - - 2012 9 2MW 2.0MW Haizhuang has estsablished solid strategic partnership with all the TOP 10 wind developer in China. With the high standard quality control protocol, Haizhuang is a stable company doing sustainable business. In the year of 2012, Haizhuang has been ranked NO.9 in China in annual newly installation and NO.1 in 2MW sector (doublefed). In Guodian's Jiangsu tecting wind far where different turbines are installed, Haizhuang has 2 sets of 2MW turbines ranking No.1 and No.3 in single turbine annual yield which could be strong proof of turbine quality. 2011 10 2 2MW 2012 3 In the tear of 2011, 2 sets of Haizhuang 2MW turbines were exported to the USA and got COD in March, 2012. The good performance has gained Haizhuang's imange in the States. 98% With the high standard quality assurance system, Haizhuang turbine get annual availablity at 98%+ level, Haizhuang got good reptutation from wind farms located in
2

different provinces. Haizhuang is growing towards a group level with a national R&D center, 5 manufacturing bases and a investment company established. Outside Chongqing, Haizhuang has bases in Inner Mongolia, Xinjiang, Yunnan, Jiangsu, and Gansu provinces pointing at all the reginal market in China. Haizhuang (Beijing) New Energy Investment Corp is doing active wind power development and investment in China. With decades' development and CSIC resources, Haizhuang is performing a stable strategy in technology R&D, advanced turbine manufacturing and investment, Haizhuang has the conditions and capabilities to develop the National Offshore Wind Enigeering Center..

2 The Establishment of the National Engineering Research Center for Offshore Windpower
a) Positioning of the National Engineering Research Center for Offshore Windpower
The National Engineering Research Center for Offshore Windpower was established in conjunction with Haizhuang Windpower Equipment Co., Ltd. Operated under Core competence and Cooperation mode the research center has designed as a national leading and global competitive institute, which fully utilzed the synergestic scientific resources inside CSIC Group, and competible with the offshore technology development of China. The Centers mission is R&D of general technology in the emerging offshore wind power industry and consistend develop and provide a stable public service platform, and the Center engaged itself in buiding of a offshore wind power scientific base which combined technologcal innovation, transfer of the research archivments, exchange the information and technolog and human resource training together. Following the Chinas development strategy of offshore wind energy and based on the R&D of offshore wind power geration system, a innovation platform of offshore turbine development and offshore wind farm construction of our own would be built, and it will accelerate the update of Chinese offshore technology, improve the mangagment of construction and operation for offshore wind project, and realize the nations target for the development of renewable energy.
4

The overall objective of the Center is to establish a fundamental base for design of offshore wind turbine, system integration, test and verification. The Center serves Chinese wind turbine manufacturing industry in the R&D for the critical and general technology such as design of offshore wind power system, integrated manufacturing, ocean environment, and provide comprehensive solution for offshore wind power equipment manufacturing and project construction, build a innovation platform of the independent design, make and integration of the offshore wind turbine that is fully compatible for Chinas climate, wind condition and geological characteristics, take the overall innovation ability of Chinese wind power industry to a new level. Haizhuang Windpower is a manufacturer of wind turbine generator. The company is responsible for the solution of bottlenecks in manufacture and operation of offshore wind power equipments as follows: 1 2 3 4 5 (1) Simulation and research of testing technique for Impact of ocean wind, wave, current and tide on WTG, tower and foundation. (2) Design of offshore WTG based on ocean wind resource and environment (3) Research of high reliability and serviceability based on ocean environment (4) Research and application of erosion protection technology for offshore WTG (5) Construction of foundation and erection of offshore WTG

b) Team building of the National Engineering Research Center for Offshore Windpower
3 29 Since its foundation, the member list of the Reporting Committee of the Feasibility has contained the representative from the direct official, Haizhuang Windpower, CSIC and other relevant companies and institutes. Meanwhile an Academic Committee has been established also. The Academic Committee included 3 Academicians from CNERI and 29 domestic and foreign top specialists of offshore wind power. The Director is responsible for the Center, and is directed and supervised by the Administration Committee. Under the Center there will be subsections as the R&D Center Denmark, the Department of Technology, Haizhuang R&D Center, Administration Office of Engineering Center, Lab Resources of CSIC, Technology Resource of Supply Chain. 153 129 24 31 44 78 The Center is operating in compliance with the regulations of CSIC(Chongqing) Haizhuang Windpower Equipment CO., Ltd. CSIC Group and under the principal of modern enterprise. It has utilized its synergistic advantages of the current technology economy and human resources, and has provided multilateral R&D, technical consultant and service, technological communication, promotion of new technology and education. The Center continuously enhance its team by introducing of talent with advanced technology, either full time or part time, by employment or guest invitation.
6

The Center has 153 staffs, 129 employees and 24 guest researchers and postdoctors. The elite researcher team of 31 senior engineers, 44 intermediate engineers and 78 junior engineers bring out outstanding ability of research and innovation. 2.5MW 60Hz H102-2.0MW During the period of establishment, the Center has opened series of research for the critical and general technologies, which covers system design, integrated manufacturing, ocean engineering and erosion protection, expansion of the environment compatibility of WTG, optimization of the control strategy for wind power, energy management platform and cutting edge technologies of wind power. Such researches can reduce the costs and improve the efficiency of design and manufacturing of offshore wind power equipment and construction of offshore wind projects. Meanwhile the R&D for 2.5MW WTG, the WTG compatible with 60Hz grids in North America, the H102-2.0 MW WTG with extra long blades and the plateau type and inter-tidal type WTG has also been finished. 5.0MW 127m 151m IECI IECIIIB+ GL IEC 5MW 5MW 5MW In the same period, the development of 5.0 MW offshore WTG has been finished, which has used standard and modularized design, equipped with blade length of 127m and 151m, is compatible for IEC wind zone class I and III B+ respectively, which has expanded the available scope of utility. The turbine is fully compliance with the design standards of IEC and Germanischer Llody. The 2 turbines of this model has been installed in Longyuan Rudong Intertidal Demonstration Wind Park, Jiang Su province, which is operated by Longyuan Wind Power CO., Ltd. its the first 5MW offshore model installed with tripod foundation and erected by offshore wind turbine installation ship in China. The 2 turbines are currently running und good and stable condition, and have already archived full load generation. The domestic leading and global outstanding performance shows the strong research ability of the
7

Center. The load simulation and calculations platform for the offshore wind power and the analysis and test platform for the system control of the offshore wind power have been setup by the Center. At the same time the Center has utilized domestic advantage in offshore equipment, offshore engineering, resistance technology in extreme environments and resources inside CSIC Group, co-founded with 3 research institutes the Laboratory for the Research of Ocean Dynamic, the Laboratory for the Research of the Offshore Wind Turbine Generator Testing and the Laboratory for the Research of Erosion Protection of Offshore Wind Power Equipments. With said facilities the Center has won the ability in research and test of critical technology for the offshore wind power, and accomplished its set objectives. 10 17 4 4 15 6 10 89 20 2 During the establishment, the Center has undertaken 10 offshore wind power relevant research projects from local and state government, including 4 national projects, 17 patents have been applied, under which 4 for inventions, 6 applications are been accepted, 10 have be certificated, 89 papers are published, 20 technological achievements with own intellectual property are gained. The Center has also participated in formulating of 15 standards, has formulated 2 standards alone, that has greatly improved and regulated offshore wind power industry. 709 MECAL KK 10 The Center has very close contact with domestic engineering companies, design institutes, universities, scientific institutes and manufacturing enterprises, who have already strong performance in offshore wind power. 10 cooperation projects have been carried out with Chongqing University, North China Electric Power Unnivercity,
8

Chongqing Institute of Industrial Automation and Instrumention, Chongqing Academy of Science and Technology, CSIC(Wuhan) Lingjiu Electric CO., LTD. MECAL, kk-electronic in period of establishment. Such objective oriented projects of offshore wind power technology has guaranteed the transfer of research achievements into productions. 24 3 100 37 21 Today, the Center has cultivated 24 Masters and 3 Doctors/Postdoctors in the area of offshore wind power and trained over 100 professions in the area of engineering, management, sales related to offshore wind power. The Center has ever sent 37 person-time abroad for technological cooperation, training and education, 21 person-time for business visit. As an exchange platform, the Center has hold 3 times high level, large scale international forums of offshore wind power technology, and has been evaluated as important milestones of the development of the offshore wind power in China.

3
Operating Performance of the National Engineering Research Center for Offshore Windpower

Fundamental construction of the Center

1.1

Organization

-1 The Center has rearranged its existing and new scientific resources in categories of the Research of Application Foundation, the Research of Critical Technology, the Research of Application in the Engineering, the Research of Technology Promotion, Figure III-1 shows the scientific units of the Center and their research assignments.

10

5M W

2. 5M W

2M W 850k w

-1

11

the National Engineering Research Center for Offshore Windpower

Research Categories
the Research of Application Foundation

the Research of Critical Technology

the Research of Application in the Engineering

the

Research

of

Technology Promotion

Research Subjects Load analysis of wind turbine Win d turbine control ence ocean Dynamics to offshore wind power Influ of on protection technique Erosi ng technique of offshore wind Testi ote control and monitorin g offshore wind of wind power Rem Gridfriendly connection technique of offshore hore installatio n technique Offs Deve lopment of 5MW offshore wind turbine arch cutting edge technolog ies Rese of Deve lopment of 2.5MW offshore wind turbine and optimizati on 850kW wind of 2MW and Impr ovement

Research facilities Platform for Load Simulation and Calculation Platform for Analysis and Testing of System Control Laborator y of Ocean Dynamic Laborator y of Erosion Protection Laborator y of Wind Turbine Testing Technique Software Design Studio of Engineering Center and R&D Center Research Lab for Grid Connection of Engineering Center and R&D Center Figure III-1 Organization of the National Engineering Research Center for Offshore Windpower Research Lab for offshore wind turbine installation Research Lab for System Design Engineeri ng Center Mechanic al Lab of the Dep. of Techn. R&D Center

12

1.2 Construction of Bases

2MW The industrial base of the center is combined within the production project of 2MW Various Speed Constant Frequency Wind Turbine Generator of Haizhuang Windpower, and the manufacturing base of Haizhuang Windpower Jiangsu for offshore wind turbine and components.

2MW 2008 2010 3 2MW 50

The 2MW Various Speed Constant Frequency Wind Turbine Generator of CSIC(Chongqing) Haizhuang Windpower Equipment Co., Ltd. has been launched in 2008, and accomplished in March 2010. The launch of the production has achieved a advanced, high efficient and logistically smooth capacity of 500,000 kW/a with fully own intellectual property. The production facility includes erection equipments, assembly, measurements and testing equipments, commission platform, warehouse and logistic facility. 2MW the National Engineering Research Center for Offshore Windpower is located on the 2nd and 3rd floor by Haizhuang Windpower. The establish of the industrial base has greatly improved the hardware for the R&D of offshore wind turbine, and provided a possibility of mass production. 5MW 2013 2014 50 The production base of Haizhuang Windpower Jiangsu serves the production of 5MW and other offshore wind turbines. The facility of offshore turbine and components manufacturing is under ready-to-operate stage, and is been planed to be put into operation in 2013, and be expected to reach the annual capacity of production

13

of 500.000kW in 2014.

1.3 Construction of Testing Platform


5 5 Testing platform is the basic condition of technological R&D. In the past 3 years the Center has established 5 labs and simulation platform capable for fundamental research by itself or in cooperation with relevant research institutes inside CSIC Groups. With the establishment of such labs the R&D condition is been efficiently improved and enhanced.

-1 Table III-1 Labs and Testing platform of the Center

No. 1

Name Platform for Load Simulation and Calculation of Offshore Wind Power

Established by Self established Self established

Platform for Analysis and Testing of System Control for Offshore Wind Power Equipment
3 the National Engineering Research Center for Offshore Windpower

702 Cooperation with CSIC Research Institute No.702

Laboratory of Ocean Dynamic


4 the National Engineering Research Center 725 Cooperation with CSIC Research Institute No. 725

14

for Offshore Windpower Lab of Erosion Protection for Offshore Wind Power Equipments 5 the National Engineering Research Center for Offshore Windpower 712 Cooperation with CSIC Research Institute No. 712

Laboratory of Offshore Wind Turbine Testing Technique

b)
The R&D abilities of engineering and technology and the Transfer of the achievements 2.1 The R&D abilities and achievements of the Center

6 2 1 4 1 1 During the 3 years of the establishing 6 research subjects have been awarded including 4 awards of the Outstanding and Important New Products Chong Qing, 1 first prize, 2 second prizes and 1 third prize for the Progress in Science and Technology of CSIC Group, 1 Achievements Prize for the Progress in Science and Technology of Shipbuilding Industry Company Chon Qing. 17 4 13 6 10 17 Patents have been applied, including 4 new inventions, 13 utility models, 6 applications have been accepted, 10 have been granted. 13 Intertek 10 CE 1 2 8

15

13 Design Certificates of the new products developed by the Center have been given, including 10 Certificates by CCS(China Classification Society), CE Certificate by Intertek, 2 Certificate by China General Certification Center. 8 Tests including LVRT(Low Voltage Ride Through) and Assessment of Grid Adaptability by China Electric Power Research Institute have been passed. 89 52 Advanced Materials Applied Mechanics and Material Research Renewable Energy 9
89 papers have been written in the past 3 years, from which 52 papers have been published on top domestic and foreign academic journals such as Applied Mechanics and MaterialAdvanced Materials ResearchRenewable Energy, Acta Energiae Solaris Sinica, Journal of Vibration and Shock. 9 Bulletins of the National Engineering Research Center for Offshore Windpower have been released, on which the activities of wind power industry and of the Center in last 3 years would be fully recorded.

17 ISO 9 2 / 6 ISO/TC8/WG3 2011 10 2013 9 Ports and Marine Operations Communication and Emergency Management Entry-level Qualification Technical Equipment LogisticsSupply Chain Information Flow Work and Living Condition Offshore Personnel Transfer Systems 7 ISO

The Center has formulate alone or participated in totally 17 industry standards, including 9 national and industrial standards by the National Technical Committee for Standardization of Wind Machinery, China Electric Power Research Institute, China Machinery Association Branch Association for Wind Power and ISO, 2 standards of Administration of Quality and Technology Supervision Chong Qing. The Center has participated in formulation of 6 national standards: Technical Specifications for Electric Pitch Control System of Wind Turbine Generator Units, Doubly fed variable speed constant frequency wind turbine, Measurement and assessment of Power
16

quality characteristics of Wind turbine generator system, Communications for monitoring and control of wind power plants. Overall description of principles and models, Acoustic noise measurement techniques of wind turbine generators systems, Design requirements for offshore wind turbines. And the Center has also been invited as formulator of ISO for offshore wind power standards to participate the formulation and discussion meetings of ISO work group TC8/WG3 for offshore wind power standards, who is only institute be invited for the formulating works of international standards for offshore wind power. From October 2011 to September 2013 the Center has participated formulation and discussion of 7 ISO Standards for the offshore wind power, such as Ports and Marine Operations Communication and Emergency Management Entry-level Qualification Technical Equipment Logistics- Supply Chain Information Flow Work and Living Condition Offshore Personnel Transfer Systems. By this means the Center has introduced the experiences of European offshore wind technology and project practices of offshore engineering and facilitated the progress and development of offshore wind industry of China.

2.2 The research and development projects undertook by Engineering center


10 4 6
Engineering center established for three years, and undertake the main technical difficulties of offshore wind and also took many research projects from national, provincial and the company, which has 10 science and technology projects above the provincial level, and 4 national projects, 6 the provincial project.

National research projects

15.0MW
Design, Integration and Demonstration of 5.0MW offshore wind turbines with doubly-fed constant frequency generation.Ministry of Science and Technology

2 5.0MW
The key technology research of 5.0MW offshore wind turbines. Ministry of Science and Technology

3
17

The key technology research of offshore wind turbines design. Ministry of Science and Technology

45.0MW
Development and industrialization of 5.0MW offshore wind turbines. (National Energy Administration)

Provincial research projects

1H872MW
Development and industrialization of H872MW wind turbines. (Chongqing Economic and Information Commission)

2 Mixing tower and Improve the capacity of wind farm. (Chongqing


Economic and Information Commission)

3H100-2.0MW
Development and industrialization of H100-2.0MW wind turbines. (Chongqing Economic and Information Commission)

4
The key technology research of ocean currents. (Chongqing Technology Committee)

5
National cooperation base construction. (Chongqing Technology Committee)

6
Demonstration application of distributed access to wind power in China.

3 5MW 5MW 5MW 2

18

SC AD A

5M W

-2
Figure 3 Organizational relations of the major projects and key technical points During these 3 years of the construction, engineering center with the help of HZ windpower company to make technology accumulation, and get the support from CSIC Group in marine equipment and engineering technical advantages. The center make the development of the 5 mw offshore wind turbine, key projects around the project application and wind turbines on engineering application. And the center applied the technical achievements of 5 MW offshore to the onshore wind turbines optimization and upgrading which promote the technological popularizing and radiation. The major projects and key technical points center undertake as shown in figure 3 to 2.

2.3 The centers technology transformation


efficiency

3 H102-2.0MW H60-2.0MW H87-2.0MW H93-2.0MW H102-2.0MW H932.0MW

19

Transformation of the centers technological achievements is carry out by the HZ windpower. After 3 years, the technical accumulation and transformation has been made outstanding achievements. Through the transformation, there has formed a sequence of wind turbines products cover a variety of natural environment and wind area, and developed a number of national and provincial key products, such as H102-2.0 MW wind turbine which won the award of the national ministry of science and technology. Besides this, wind turbine of H60-2.0 MW, the H87-2.0 MW, H93-2.0 MW and H102-2.0 MW also won the award of the Chongqing key new product, and H93-2.0 MW wind turbine for Chongqings excellent key new product.

2011-2012 2013 1-6 154%


At the same time, the centers technology conversion efficiency is also reflected in HZ windpower' s performance. With the increasing of technical ability and the strength of technical accumulation, the company's performance has a larger breakthrough. In 2011-2012, the period of adjustment in wind power industry, the company's annual installed capacity maintain a certain growth rate. According to Statistics from the Chinese wind energy association published in June 1, 2013, the companys newly installed capacity grew by 154%, which is the fastest growing in the domestic wind power equipment manufacturing industry. Respectively, the official Xinhua news agency and People's Daily separately published feature articles called " the mystery of the haizhuang windpower s bucking up" and why the haizhuang windpower can be risen during the contrarian. Both of them are pay tribute to The center and companys steady development strategy.

c)
The team construction and training of the talents

3.1
The team construction performance of the talents

20

3 2009 62 153 129 24


During these 3 years, the center has built a high level of high quality talent team. Now, it has 153 engineers which nearly three times compare with 62 engineers in 2009, including 129 fixed staff, research and postdoctoral visiting personnel 24 people. All of them have rich experience in project management and teaching.

20 2010 2012 16.1% 20.2% 24.2% 26.1%


In addition to hire permanent staff , , the center also hired technology backbone and management personnel from the CSIC Group during the forming period, and the other relevant institutions and enterprises of the CSIC also sent their engineering and technical personnel more than 20 people to the centre to work. The data of comparison between the early 2010 of and the end of 2012, the senior title personnel proportion increased from 16.1% to 16.1%, and the proportion of Dr. Master's personnel also increased from 24.2% to 24.2%, which is show the center played a huge role of supporting the form of attract and cultivate high-level talents

3.2 Personnel training



The center make full use of its own advantage of wind power equipment system integration and engineering construction, closely linked with the wind power enterprises, They combining with the university, adopt various forms to train specialized technical and management personnel in offshore wind power.

2012 24 3 100

21

By the end of 2012, the center has trained 24 people of postgraduate of offshore wind power, 3 post-doctoral in offshore wind power and all kinds of specialized personnel more than 100 person in engineering , management and marketing.

2000 21 50 / , ,
The center has trained specialized personnel more than 2000 people in engineering technology, management, and organized the 21 groups of 50 m/academic backbone to abroad for engineering technology exchange and shortterm technical training, which improve the their international vision, and also increase the international influence of the engineering center and its technological achievements during these three years.

3 2010 12 28 2010 24

During these three years, the center has held international industry BBS in academic exchanges 3 times. Mainly including: December 28, 2010, the first academic conference of the national engineering research center for offshore wind power in 2010 held in Beijing. The Academician Wu Yousheng from CAE was been hired as honorary director of the academic committee, The Academician Jin Donghan as director, and Other 24 experts formed academic Committee. The CSIC Groups deputy general manager Li Guoan attended the meeting and made a speech. The groups chief engineer, director of the ministry of equipment Sun Jianke, the president of HZ windpower Yang Benxin and other relevant departments of the leadership, experts and heads of the relevant departments from group headquarters also attended the meeting.

2011 10 26 100 Anton de Roest 14 MECAL 2011


22


October 26, 2011, "the second annual meeting of academic committee of national offshore wind power engineering technology research center and highlevel technical BBS offshore wind" was held in Chongqing. The Academician Jin Donghan, Dr. Sun Honghang and Yang Benxin, director of the national engineering research center for offshore wind power, attended the meeting. As well as more than 100 experts and scholars from the main global wind power equipment research and development institutions also attended the meeting. Some experts including Academician Jin Donghan, deputy director Li Junfeng from he national development and reform commission of the energy research institute, Dutch MECAL company general manager Anton DE Roest and so on, made academic reports. The reports content including offshore wind power technology development at home and abroad, development trend of wind power industry standard, as well as the related special technology, and other aspects. This annual meeting and technical BBS is an item activity of international wellknown research institutions Chongqing Action in 2011, gathering some industrial personages, and provided a high-level communication platform for offshore wind power technology research and development in our country. It also deepen the mutual trust in the offshore wind field at home and abroad, enhance the confidence to participate in international cutting-edge technology and ability.

2012 2013 1 12 80 5MW 2MW

23

January 12, 2013, "The third high-level annual meeting of national offshore wind power engineering technology research center academic committee and wind power generation technology BBS" held in Rudong. Jiangsu province. More than 80 people attended the meeting, the Conference Name List including Director of National ministry of science and technology planning department Wang Junli, honorary director of the academic committee Academician Wu Yousheng, director of academic committee of Jin Donghan, Yang Benxin, director of the center, and some well-known experts and scholars in the wind power industry at home and abroad, leaders, the media. The meeting discussed "the future prospects of the development of wind power in China's, development status of offshore wind power and risk response, China classification society for the development of the offshore wind power". Experts, scholars and engineers make the reports about "macro guidance, technical progress, and cutting-edge technology". Among them, the center also make a introduction of developing of 5MW offshore wind turbines and improving of 2MW onshore wind turbines through independent innovation of technology breakthrough.

d)
Radiation and diffusion capability of technology achievements, influence on the development of the industry

4.1 Radiation and diffusion capability of technology


achievements


The center always adhere to: the combination of science and technology with economy, science and technology combined with production, research combination with learning. According to the national economy, social development and market needs, the center special for industries and fields to research independently and develop scientific and technological achievements in cooperation with the upstream development way, as well as adhere to continuously apply the technology achievements systematically.

24

At the same time, the center through cooperation transformation, technology transfer, technical service and other ways to realize the transformation of scientific and technological achievements into productivity.

LM KK

During these three years, the center makes full use of its own technology and industrial chain integration advantages, through joint research and development to make the upstream companies get the benefit from technical results, such as the LM wind power blade co., Chongqing heavy wind power gear box (wuhan) co., LTD., CSIC LingJiu electric co., LTD., Denmark KK electronics company. Also through the technology training, complete equipment and engineering services to support the development of other downstream enterprises, such as Longyuan Power, Huaneng Group, CGNPC, CLP and Yunnan Energy Investments.


Through the EPC, production base construction, equipment supply, the centers technological achievements to spread to most wind energy resource-rich provinces in China, including Inner Mongolia, Xinjiang, Jiangsu, Liaoning, Hebei, Shandong, Shanxi, Gansu, Yunnan, Guangdong, Zhejiang, Jiangxi and so on. At the same time, through equipment supply, joint research and development, the center realized the technological radiation to North America and Denmark. In the future, technology from the engineering center could also radiate to Brazil, Romania, Ukraine, Germany and other countries or regions. Technical cooperation and collaboration 4.2

25

The center and engineering companies in offshore wind field both at home and abroad, design institutes, universities, research institutes and production enterprises to maintain close contact, targeted to carry out research and engineering technology research in the field of offshore wind, ensure smooth bridge between research and industrialization of production, to drive the technological innovation, mechanism innovation to promote the healthy and rapid development of offshore wind power industry. In the process, engineering center core played a leading role, reflect the engineering center in offshore wind field of cohesion and coordination ability.

5.0MW 5MW // 5MW 200KW 5MW 2MW

The center carried out the evaluation index and the wind turbine blade matching sex research, and studies of 5.0 MW offshore wind power unit simulation technology, the dynamic analysis of 5 MW wind turbine transmission chain With Chongqing university; With north China electric power university, they carried out the island wind/wood/micro grid storage system research and development "and" 5 MW offshore wind turbine gear box and generator system integrated optimization design; Automatic control technology and shenyang university of technology institute conducted 200 kw wind turbine technology transfer; With chongqing jiaotong university opened under the wave loading with offshore wind turbines based research on dynamic response of the single pile; With chongqing institute of science and technology research to 5 mw offshore wind power unit reliability design. Cooperating with xinjiang university is highly effective and reliable wind power generation system research on key technology of cooperation; In cooperation with the China electric power research institute to carry out the national energy application technology research and engineering demonstration project ". With huazhong university of science and technology, China motor, pater electric and other institutions and enterprises to carry out the "2 mw brushless doubly-fed generator and converter industrialization" projects, etc.

5MW MECAL 5MW LM KK 5MW


26

Lehnhoff GL 5MW 5MW


In the 5MW offshore wind turbines developed, engineering center design company MECAL a partnership with the Netherlands, as a 5 mw project overseas consulting units. At the same time, engineering center and LM blade company, KK electronics, such as foreign enterprises to achieve cooperation, jointly completed 5 mw for the development of some parts. In addition, engineering center, also with the German Lehnhoff consultancy, Germany GL classification society and other overseas research institutions set up a partnership, and established the r&d center in Denmark. Thus, in the process of research and development of 5 mw offshore wind turbines, ideas, take the long, advantages of science and technology at home and abroad and technical force, has realized the technological achievements to the domestic and overseas radiation, ultimately to ensure that the 5MW offshore wind turbines has reached the international advanced level.

4.3
Technical achievements transformation and extension


The one of important mission of national engineering technology research center is to transform scientific and technological achievements into engineering practice, the basic research results into applicable technology innovation, so as to realize the conversion technology to productivity. Among them, the technological achievements include two parts, one is from the basis of colleges and universities, research institutes and other research institutions of scientific research results, the second is applied basic technological achievements obtained by engineering center itself.

4.3.1 The transformation of the basic scientific research

27

Basic scientific research need long time of accumulation of data, the results have significant scientific value, but the industry is worth not, significantly, this kind of research is usually carried out in professional research institutes or universities. National engineering technology research center, one of the most important task is to research results into such basic scientific problem has significant engineering products of industrial value.


The national engineering research center for offshore wind power through the form of joint construction of laboratory and research institutes, the basic scientific research ability, can fully grasp of relevant scientific research institutes of technology, and use the engineering center of industrial design, engineering and manufacturing ability, the results into the engineering application. Concrete results include:

1 725 725 5MW


(1) The anticorrosion technology transformation. Engineering center and the Chinese heavy industry 725 research institute jointly established the national engineering research center for offshore wind power, Marine wind power equipment anticorrosion research laboratory. 725 Marine anticorrosive technology has a long-term accumulation of data, can provide Marine steel structure anticorrosion technology and a number of data required. The national engineering research center for offshore wind power - sea wind power equipment anticorrosion research laboratory, on the basis of the existing technology accumulation, anti-corrosion technology of offshore wind turbines are studied, and through the engineering center will technology into engineering practice. Under water anodic protection technology, different height of the steel structure anticorrosion technology, etc., have been applied to the engineering center of 5 mw offshore wind turbines jacket and tower anticorrosive.

2 702 702
28

2011 5MW 6 2011 5MW


(2)Transformation of Marine hydrodynamics research achievements.

Engineering center and the Chinese heavy industry 702 to build the national engineering research center for offshore wind power, Marine power research laboratory, with 702 of ocean dynamics data accumulation and research strength, mastered the hydrological characteristics of China's coastal waters and kinetic characteristics of the seabed, on the basis of the offshore wind turbine parts of sediment impact characteristics were studied. In 2011, the national engineering research center for offshore wind power to east China survey design institute designed for 5 mw offshore wind power unit 6 pile jacket, and in the second half of 2011, the success of the installation to ensure the smooth lifting of the 5 mw offshore wind turbines.

3 712 712 5MW 884 5MW


(3) The transformation of wind generator detection technology. Engineering center and the Chinese heavy industry 712 jointly formed by Marine wind power unit testing research laboratory, using 712 testing technology in the power system to accumulate, the establishment of a wind turbine power system test platform. 5 mw offshore wind turbines are engineering center developed on the use of the high-speed permanent magnet synchronous generator is generator manufacturers the Chinese heavy industry 884 factory testing, the test results will be used to guide the 5 mw offshore wind power unit of the system design and control parameters optimization.

4 5MW
(4) Military technology transfer. Marine machinery and equipment of whole sealing and heat dissipation structure is originally applied Yu Junpin technology. Development of 5 mw offshore wind turbines in the center of the engineering application of the technology, and realized the transformation of the military technology to civilian goods.

29

4.3.2
Applied basic technical achievements transformation

2.5MW 5MW 850kW 2MW


The national engineering research center for offshore wind power depends on the sea with wind power company research and development center and the department of scientific research strength, the multiple application of offshore and onshore wind turbines based key technologies are studied, including the system design of wind turbine technology, reliability, improve technology, on-line condition monitoring, remote monitoring, wind power increases, optimization control technology, etc., have been at the 850 kw of installed wind power company, 2 MW, 2.5 MW, 5 MW power levels of applied in wind turbines. The specific name of the transformation of technological achievements such as shown below. With a supporting institution sea wind power company's engineering and construction conditions, national engineering research center for offshore wind power has the ability to turn research fully and promote to the industry, implementation technology value-added.

-2 1 2 3 4 5 7 8 9 10 11 5MW 2.0MW H102-2.0MW H100-2.0MW H103-2.5MW H52-850kW H60-850kW 2.0MW 2.0MW 2.0MW60HZ

30

12 13 14 15 16 17

2.0MW 70m/80m

Figure 3-2 Name of applied basic technical achievements transformation No Result Way tansformation 1 5MW wind turbine research and n generation of 2.0MW wind n self-transformatio n wind turbine research and n wind turbine research and n wind turbine research and n wind turbine research and n self-transformatio n self-transformatio n self-transformatio n self-transformatio n 13 14 An island of micro grid n Cost reducing for 2.0MW wind turbine n self-transformatio self-transformatio self-transformatio self-transformatio self-transformatio self-transformatio self-transformatio self-transformatio of

development 2 the second

turbine research and development 3 H102-2.0MW development 4 H100-2.0MW development 5 H103-2.5MW development 7 H52-850kW development 8 H60-850kW development 9 10 The typhoon type of 2.0MW wind turbine research and development 2.0MW wind turbine for intertidal zoned research and development 11 2.0MW 60HZ wind turbine research and development 12 Distributed wind power generation wind turbine research and

31

15 16 17

Development of control system n Development of Remote Monitor System n Mountain transportation for tower of 70m/80m n

self-transformatio self-transformatio self-transformatio

4.4
Impact on industry technology progress and the function of the industry competition

5MW 3 9 2MW 2MW 111

Engineering center of national science and technology support plan the successful design of the 5 mw offshore wind power unit and connected to the grid, is engineering center to carry out the innovative technology of the landmark result of the research and development. The wind generator with completely independent intellectual property rights, after 3 years of technical research, successively in transmission system, control system, key technology such as Marine corrosion has achieved a major breakthrough in the field, with the nine national patent technology, the unit of similar models in the current implementation "three of the most", namely, the "largest rotor diameter and the nose the lightest weight, generating the highest", which greatly improved the world competitiveness of China's offshore wind turbine. At the same time for 2 mw wind turbine key technology research and engineering design, through technology optimization, quality improvement, improve efficiency and load for wind turbines, which can improve the utilization rate and capacity, the failure rate greatly reduced, and successfully developed the 2 mw rotor diameter is 111 meters is suitable for the low wind speed area of wind turbines, for enhancing the power performance and improve the competitiveness of wind power industry has great role in promoting.


32

2011 6 2013 12 2 2012 2013 18 259

Engineering center initiated by participating in state and local government departments concerned about industry long-term planning, upstream and downstream industry chain of offshore wind power radiation, diffusion effect, thus promoting the development of industry technology. Such as engineering center is involved in launched by the Chinese academy of engineering of the strategic emerging industry training and development of strategic consulting projects, in which the wind power industry consulting for renewable energy group. The project time is in June 2011 to December 2013, the purpose is to provide policy reference for the national "much starker choices-and graver consequences-in planning and the suggestion. The consulting projects include the wind power industry as well as the offshore wind development present situation at home and abroad to summarize, the development trend of the industry and the key technology and the anticipation of disruptive technologies or breakthrough technology, pointed out that the development of industry roadmap, and focus on research and development direction of industry policy advice. This project has for two years, at the end of 2012 project results summary for the white paper China's strategic emerging industry development report 2013, published by science press, Beijing, China academy of engineering.

- - - - - - Engineering Center assume that the contents of the White Paper on Chapter 18, " wind power industry " ( Page 259 ). Engineering Center chaired by the Chongqing municipal government launched the " Twelve Five" Chongqing strategic emerging industries of wind power industry cluster building program project, which includes
33

the right of Chongqing wind power equipment industry status quo and the main summary of the problems presented in Chongqing wind power industry cluster building ideas and building goals and industry chain cluster configuration and construction layout suggestions, and industry chain cluster construction of key projects and safeguards provided advice . 5MW 200kW Engineering Center vigorously carry out the wind, waves, currents, tides and other environmental factors on the wind turbine, tower and foundation interaction and impact simulation and experimental research, completed for wave loads - foundation tower Coupling Dynamics Simulation Technology. Carried out wave loads - Wind load - wind turbine coupled dynamics simulation. Conducted a marine corrosion failure mechanism and infrastructure of the extent of damage. For wave loads foundation - miniature tower flume experiment, with the wind, waves, currents, tides and other environmental factors on the wind turbine, tower and foundation interaction and impact simulation and test the ability to provide public services for the sector platform.

34

e)
Capacity and effectiveness of external development services

5.1 Open Services


712 725 702 18 9 Through the establishment of open issues form, engineering center attracted domestic Institute,such as CSIC 702 Institute, 712 Institute, 725 Institute, Chongqing Institute of Science and Technology, Chongqing University, North China Electric Power University and other research institutes and universities to participate in significant research and development engineering centers of 18 cooperation projects, in addition, the initiative to undertake domestic engineering center also commissioned a major wind power companies transverse research and development topics for research and development of the domestic wind power enterprises to provide technical services, 3 years to undertake research and development 9 topics. Through the innovation model, engineering centers and research cooperation made a lot of scientific and technological achievements, to domestic and foreign wind power companies through publicity, marketing, not only in the field of wind power industry domestic and overseas show the scientific and technological achievements with independent intellectual property rights, but also supports a large number of domestic and overseas project development and implementation process of the project successfully achieved technological achievements transformation, transfer and diffusion of radiation, promote wind power equipment manufacturing, control and other areas of technological progress. 850kW/2MW/2.5MW/5MW 20

35

In 3-year period, the engineering center homegrown 850kW/2 MW/2.5MW/5MW key wind turbine technology innovation results in a large number of more than 20 major projects successfully achieved industrialization and foreign service, and create a good economic.

5.2 Personnel training


98 2000 Engineering Center established three-year period, the Haizhuang Windpower company attach great importance to R & D personnel and engineering and technical personnel training, the intensity of technical exchanges and cooperation with foreign countries has been greatly improved, inviting Chinese Academy of Engineering and other experts and scholars carried out with a variety of training 98 times, training all kinds of engineering and technical personnel and research and development staff of more than 2,000 people. 21 50 Engineering Center trips were organized 21 batches 50 preson-time academic backbone abroad for engineering and technical exchanges and short-term technical training in 3-year, to enhance technical and R & D staff of international perspective, but also increased technological achievements Engineering Center's international influence.

5.3 Academic communication


31 615 Engineering Center established three-year, a number of research institutions domestic and overseas, enterprises and universities to carry out academic exchange activities, invited Chinese Academy of Engineering, and many other experts carried out with various academic exchange activities 31 times, to participate in academic exchange activities reached 615 person-time.

36

f)
Organizational structure, system build and operation mechanism innovation

6.1 Organizational structure


Engineering Center relying on CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd. to established. Engineering Center. Director is responsible for the implementation of the system, meanwhile accepting the Management Committee operational guidance and supervision. Establis the Danish research center, technology dept., research and development centers, engineering centers office, the machine room is under the technical department, offshore wind turbine installation laboratory and offshore wind turbine grid access research, under the R & D Center, establis Software design Laboratory, System design Laboratory and Applied basic Laboratory, under the Engineering Center Office, establis the technology exchange service center and central office. In addition , institutional settings including CSIC laboratory resources and Supply chain technology resources, whereCSIC laboratory resources jurisdiction National Offshore Wind Engineering Research Center - Ocean Power Research Laboratory, National offshore Wind Engineering Research Center - marine wind turbine testing research laboratory, National offshore Wind Engineering Research Center - ocean wind power equipment corrosion research laboratory. -3

37

-3

Figure 3- 3 Engineering Center Organization

38

39

Manage ment Committee

Scient ific committee

Dire ctor/Vice Director

Inter nal public resources

Denma rk R&D Center

Techn ology Dept.

R&D Center

Engine ering Center Office

CSIC Laboratory Resource

Supply chain technology resources

Machi ne room

Softwar e design Laboratory

Technical communication service center

Offshore power research laboratory

Offshore wind turbines installed laboratory

System design Laboratory

Manage ment Office

Offshore wind turbines detection research laboratory

Grid access laboratory

Applie d basic Laboratory

Marine wind power equipment anticorrosion research laboratory

1 Management Committee
40

Main Responsibilities: responsible for Engineering Center development strategy, development strategy formulation, supervision and review of the financial budget report and its implementation, coordination between the relevant cooperation units. -3

-3

Table 3-3 The name list of the Management Committee

41

Title Direct or

Name Yang Benxin

Basic information General manager assistant of China Shipbuilding Industry Corporation President of CSIC (Chongqing) Haizhuang Windpower Co., Ltd Section chief of National ministry of science and technology development planning department platform base Section chief of National ministry of science and technology department of energy, high and new technology Vice Director of Chongqing Science And Technology Commission Director of CSIC of Science and Technology Dept. General manager of CSIC (Chongqing) Haizhuang Windpower Co., Ltd

Vice Director

Cao Yuzhong Zheng Fangneng Xu Qing Luo Jiyan Yu Shqoing

Comm ittee member

Wang Junli Tao Youchuan

Section chief of National ministry of science


and technology development planning department research Vice general manager of CSIC (Chongqing) Haizhuang Windpower Co., Ltd, head of the professor Director of China Ship Scientific Research Center Section chief of Chongqing science and technology commission planning department Section chief of Chongqing science and technology commission high&new department

Comm ittee member

Weng Zhenping Chen Jun Xiao Feng

2 3 29 Engineering Center Scientific Committee brought together 3 Chinese Academy of Engineering, domestic and overseas wind power technology experts 29 preson.
42

Main responsibilities: regular meetings of the Scientific Committee meeting to study and discuss domestic and overseas technological developments, development, planning engineering center direction of the work; responsible for the engineering centers commitment or ongoing project evaluation and inspection, project director of the center for the daily management advice; engineering center regularly technical characteristics, quality of personnel, hardware and software basis for evaluation of major projects, tasks, organization and implementation of the development and engineering centers are suggested. -4
-4

Name Wu Yousheng

/ Title / Honorary Chairman /Academician of China Engineering Academy

Area Ship Engineering

Organisation 702 China Ship Reserching Center (CSIC 702)

Jin Donghan

/ Chief of Scientific Commitee/Academician of China Engineering Academy

Marine Engineering

711 CSIC 711

Gu Xinyi

/ Deputy Chief of Scientific Commitee/ Academician of China Engineering Academy

Oil Machine

Shengli Petroleum Administrative Bureau

Yang

/ Energetics
43

North China Electric Electric

Name Yongping

/ Title Deputy Chief of Scientific Commitee/ Professor, docotoral supervisor

Area

Organisation University

He Yulin

/ Deputy Chief of Scientific Commitee/ Professor, docotoral supervisor

Mechanics

University of Chongqing

Fang Shujia

Researcher

Electronics

CSIC and China Shipbuilding Engineering Commitee

Sun Dezhuang

Researcher

Ship and Ocean engineering

CSIC Dalian Institute 725 CSIC 725

Sun Mingxian Qi Hesheng

Researcher

Corrosion and protection

Senior Professor Engineer

China Agriculture Machinery Association


Natioanl Climate Change researching and international cooperation center Huazhong University of Science and Technology

Wind power

Li Junfeng

Researcher

Energy Policy Vessel Electronics

Li Weijia

/ Professor, docotoral supervisor

44

Name Chen Yingqiu

/ Title / Docotoral supervisor, Researcher

Area Ship and Ocean engineering Renewables

Organisation CCS

Zhu Junsheng Zhang Liang

/ Deputy DirectorGeneral/ Senior Engineer / Professor, docotoral supervisor

IREC

Ship and Ocean engineering

Harbin Engineering University

Yang Xiaosheng He Dexin Shi Pengfei

Researcher Researcher Professor level Senior Engineer

Wind development Wind Technology Mechanics

Guodian Longyuan Group IREC IREC China Hydro

Zhao Shengxiao Jia Limin

Professor level Senior Engineer / Professor, docotoral supervisor

Wind Power

China Hydro Hua Dong Institute

North Jiaotong University Smart Control and Automation Certification


45

Qin Haiyan

Researcher

GC Certification

Name

/ Title

Area and Testing

Organisation

Guan Xiaohong Dai Huizhu

/ Professor, docotoral supervisor / Researcher, docotoral supervisor

Control Engineering Renewables and Interconnecti on Grid Integration Project Management Electrical Engineering

Xi'an Jiaotong University

China EPRI

Norbert Hennchen Frank Nielsen HenrikSimo nsen Yang Benxin Yu Shaoqing

PH.D

FREQCON FREQCON LM LM Blade KK KK Electronics HZ windpower

PH.D

PH.D

Researcher Researcher Researcher&scholar

Mechanics Electromech anical Mecha nics

HZ windpower HZ windpower HZ windpower

Tang Wenbing

Researcher

6.2

46


Engineering Center fully relies on the support which comes from CSIC (Chongqing) HZ windpower Equipment Company and China Shipbuilding Industry Corporation. Based on the policy of modern management, it conducts the daily management and operation in the full use of the comprehensive advantages of relying on scientific research, management, talent and basic conditions, to carry out joint technology research, technical consulting, technology services, foreign exchange, promotion of achievements and personnel training etc.. At the same time, it actively introduces high-tech talent, insisting on the combination of full-time and part-time, fixed and visiting combination employing mechanism.


Engineering Center introduces competition and talent-oriented mechanism, market demand-oriented policy, scientific and technological achievements of engineering, industrialization basic tasks, while the implementing of diversification mechanism to science, industry, trade, industry, academia, research organically as a whole. Engineering Center makes the allocation, reward, discipline and team building efforts to create a relaxed environment. Truly conducive to scientific and technological achievements of engineering, is conducive to the stability of high-level personnel and training. Engineering Center implementation projects incentives for commitment to national and provincial key projects of R & D project team for project awards, project leaders, project members according to their contribution to the project to give the corresponding reward. Meanwhile, in order to motivate employees, employees of the acquired knowledge of the results to be winning, actively encourage employees declare the results, the formation of papers and patents, or as a working initial results are summarized in the "Engineering Center Briefing" published, so that each employee I can feel its associated knowledge management, thus the rise of a knowledge innovation, knowledge sharing and application of knowledge, good atmosphere.


47

In addition, in order to solve the problem of access career development, engineering center established creative "project - research and development Management" employee career development paths. In that way, the same level of three types of employees can achieve barrier-free flow of work according to that Engineering Center faster into the development of a virtuous circle. 10 In the system construction, engineering centers introduced more than 10 engineering center management systems involved in targeted technology professionals, project management, intellectual property, facilities management.

6.3 operation system


(1) 1. 2. 3. 4. 5. 6. Engineering Center installed independent participation in outside business activities with the help of HZ. Engineering Center's main responsibilities include: 1. Collecting CSIC laboratory resources and supply chain technology resources, taking responsible for product development and the product of continuous technical improvements; 2. Advancing technological achievements pilot and industrial applications; 3. Carrying out domestic and international technical cooperation; 4. Setting offshore wind power generation technology standards 5. Nurturing the talents in the field of offshore windpower; 6. Promoting and applicating offshore wind power technology. (2) Engineering Center jointly conducted by the management committee decision management. It takes full advantage of CSIC in research, management, personnel and other aspects of the comprehensive advantages as well as basic conditions to carry out the advantages of the construction. R & D and technological achievements of all intellectual property rights will be owned by engineering centers. The technology

48

research outcome will be in the promotion, transformation, and pilot by HZs priority. (3) Engineering Center achieved economic benefits, mainly for their own development; Engineering Center main economic sources of CSIC and Sea Windpower technology development and investment company fees, national and Chongqing research funding and transfer of results technical service fees. (4) 20 5MW Engineering Center implements an open, flowing full appointment. With in the period of buiding Engineering Center, in addition to the employment of staff, many hired CSIC member units of technicians and management personnel to the engineering center office. In strong support of CSIC, CSIC subordinates related institutes and enterprises to send people to Engineering Center office or sending a senior engineering and technical staff of nearly 20 people, major innovative project engineering center - 5MW offshore wind turbine development work and other research work smoothly. Achieve openness and fluidity.

49

4 3
work to improve and future three-year development plan

the development process can be improved working

1.1
industry technology can further enhance the scope of radiation National Offshore Wind Engineering Research Center, during the planning process, has achieved good results in the field of offshore wind power technology and is the leading domestic level position . Engineering center for offshore wind technology breakthroughs have a positive influence on the onshore wind, with the support of HZ. But from the entire industry, the influence is still less enough. This problem is due to a primary center construction project support unit of the enterprise, with universities or research institutes exists major differences: the enterprise profitable demand, the need to expand its market share, it is bound with other companies to form the same type of competition. It results unit of the enterprise as the main support center for technical engineering services industry radiated power is not enough.
50

When engineering once completed, it will enhance public awareness of the platform services, strengthening public platform construction. In the resource sharing, information and other aspects open uphold a more positive attitude; using a central research resources and capabilities, as much as possible to undertake horizontal issues for offshore wind power and the entire wind power industry to provide more technical support.

1.2 Strengthen applied research market adaptability


National Offshore Wind Engineering Research Center belongings to the application of engineering technology research center. Found that three-year period in the preparation, application-oriented research and basic science research focuses are very different. Applied research projects need to keep up the progress of industrial technology, changes in the market conditions and policy trends and timely adjustment of research. Wind power industry is fiercely competitive, technology upgrades speed is very fast. However, the application for a national research project cycle is longer, time node relatively fixed, difficult to cope with changing market conditions. In order to improve market adaptability, engineering centers are often based on internal research project project manner, in order to grasp the research cycle and flexible funding, technology development and industrial efficiency to achieve a virtuous circle. We propose to apply for such type of research-based engineering center, preresearch system in accordance with the military way of establishing scientific research system. In addition to project funding, the project centers provide continuous support for research funding and support flexible research project forms. It should also be

51

authorized engineering technology research center industry much-needed training professional and technical class talent, build degree awarded points for the whole industry to provide adequate human resources. If they can take these policies and measures, is expected to play an engineering center in the offshore wind industry leading position and further lead the industry technical standards and promote progress.

1.3 To further strengthen international exchanges


National Offshore Wind Engineering Research Center, during the planning process, the number and frequency of foreign exchange is not too high. I hope after the completion of the engineering centers, the National confer greater international exchange of space. It will provide more support for experts participating in international conferences, international cooperation, sending personnel to study abroad, exchanging with other experts.

b) three-year development plan for the future


2.1 3 next three years construction and development planning
China's offshore wind power industry is in a period of rapid development to solve the energy shortage, promote energy conservation and improve the living environment. Industry is expected to scale and broad development prospects, the National Offshore Wind Engineering Research Center shoulder heavy responsibilities.

52

Engineering Center, once completed, will focus on the development of offshore wind power industry, the overall situation, with the technical results obtained during the preparation, and further improve the center's technical strength, promote technology to the industrial transformation, opening up new areas of research, and to strengthen the public service platform and industrial innovation platform construction. Concrete will contain the following: 2.1.1 3 4~5 10~15 3~5 The next three years, in the current basis, continue to increase offshore wind power technology research and development input. Follow the national offshore wind power development in the strategic plan, and actively carry out forward-looking offshore wind power technology research and development, and strive to undertake national key scientific research projects 4 ~ 5, 10 provincial and ministerial research 15, R & D expenditure of 3 to 5 billion.

30 10 100 Strive to achieve greater breakthroughs in scientific research, more than 30 patent applications, of which more than 10 patents and published more than 100 academic papers. Offshore wind power base in scientific issues, engineering design, optimization and application of computing technology breakthroughs in key areas, a deeper grasp the core technology of offshore wind power. 2.1.2 Strengthen offshore wind innovation platform construction 5 3 Preparation period has completed five laboratory and simulation test platform for the construction work. In the next three years, will further strengthen the innovation platform construction, the new micro-grid ocean island platform and a number of new experimental research platforms, and enhance research capabilities.
53

Improve the existing platform social service functions, through laboratory open to joint research and development, papers, monographs and published in the form, so that R & D platform engineering centers and technological achievements to serve the society and industry. 2.1.3 Enhance the depth and breadth of radiation technology 3~5 Engineering Center, once completed, will further deepen a cooperative relationship with the current universities, research institutes, enterprises and foreign well-known research institutions of cooperation, more research on the establishment of cooperation. Further play a unifying role engineering center, with more universities and research institutes to establish relations of cooperation, and strive to add three to five cooperative units, which integrate the advantages of technical resources within and outside the industry together for the offshore wind industry to provide technical support and security. Strengthen the upstream and downstream industry technical radiation capacity, improve offshore wind power components manufacturing and procurement standards, provide technical support to parts enterprises, enhance the upstream radiation; increase downstream enterprises total package, complete sets of equipment, training of personnel the number and activity level, and enhance the industry downstream of radiation. 3 It should expandthe geographical scope of radiation technology and increased technological achievements coverage. Through product sales, self-built wind farms, joint research projects with local governments and other forms of demonstration
54

projects, to achieve technological achievements to the provinces, municipalities and autonomous regions of radiation. In the next three years, and strive not currently covered by provinces, municipalities and autonomous regions to form a breakthrough, expand coverage. Unit while enhancing exports and cooperation with foreign research institutions, to increase funding for research and development centers in Denmark, personnel and project investment, strengthen scientific research to overseas radiation. 2.1.4 Establish a higher level of talent 3 3 3 300 250 40% 35% Engineering center in three years construction period, personnel has been greatly expanded. In the next three years, it will continue to introduce, recruitment, secondment and other forms, to further expand personnel. Engineering center in three years and strive to personnel number doubled to more than 300 people, of which less than 250 permanent staff person including senior titles talent to increase the percentage to 40%, and increase the percentage of doctors and masters to 35 percent, and by strengthening personnel training and other means to enhance professionalism. 3 3 3 Continue to strengthen international and domestic trade exchanges. Has held three sessions in international trade on the basis of academic exchange forum in the next three years, continues to grow at an annual forum held three sessions way. Actively participate in academic exchanges both inside and outside the industry, expanding Engineering Center's academic influence, grasp the industry advanced technology and offshore wind industry trends, leading the forefront of technology. While participating actively in the national strategic consulting projects, it will provide industry trends, forecasts and industry policy advice to the project to make the center of social responsibility.

2.2 3 The next three years of technical development path


55

The next three years, engineering technology development center will mainly focus on offshore wind power basic theoretical research, offshore wind power equipment product development and optimization, and offshore wind power key technology ecosystem. 2.2.1 The basic theory of offshore wind power research According to China from the Bohai Sea to the South China Sea resources to collect and collate data, China's coastal areas have a certain geographical and hydrological characteristics in common. Offshore Wind Engineering Research Center for Chinese coastal waters have done to be characterized, to carry out offshore wind power base bias applied research projects. Such as marine power for offshore wind turbine load effects on marine wind conditions for wind turbine optimal control, offshore wind corrosion, marine micro-siting of offshore wind power foundation design and construction, marine environment crew protection, offshore wind on the marine environment the impact. 2.2.2 Continuous updating of wind turbine products 1 5MW 5MW 5MW 5MW units stereotypes and small batch production National Offshore Wind Engineering Research Center at the planning stage, the development of a 5MW offshore wind turbines now in Jiangsurudong installed and functioning electricity. Engineering Center established, will be available, based on stereotypes 5MW offshore wind turbines, and continuing to make technical improvements to reach the international advanced level. Enhance the reliability of the unit, automation and intelligence, to improve power generation capacity. 5MW Through technical updates, from prototype to achieve 5MW units into small
56

batch production, spread to the market. By quickly bringing new technology and new equipment design into business value and achieve the transformation of the industrial technology research and development, to engineering center construction purposes. 2MW 2 2013 2MW 2MW 2013 2MW 2MW Engineering Center established, will be strengthened at offshore wind projects in the technological achievements of the radiation, continue to promote the existing mature product 2MW wind turbine improvements and upgrades. On the basis of existing models in the 2013 R & D of new units, load calculation techniques through refinement of existing models for detail improvements, has introduced new models. Not much change in the unit cost of the premise, to improve power generation capacity by lengthening the blade, thereby reducing electricity costs. In new products, the existing structure to make larger 2MW unit optimization, launched the second generation of 2MW unit, making it compatible with a longer blade, and can accommodate more wind zone and the environment. 3 SCADA Preliminary work on the project center technical achievements continues to deepen and expand the scope of application of new technologies. Developing a new generation SCADA, distributed generation, islanding microgrid technology, brushless doubly-fed technology. 4 For the refinement of wind power applications, the use of new technologies to improve existing products, making it suitable for different wind zones and natural conditions, the introduction of products with a difference, as applicable in the ocean, cold, high altitude, dust such as different environmental conditions, as well as for lowspeed, low air density, various types of turbulent wind conditions differentiated wind turbine products.

57

2.2.3 CMS

In offshore wind basic theoretical research and product development, the engineering center will also apply to offshore wind power demand as the starting point, the wind power ecosystems key technology research and application of a study. The best example should be the unattended wind turbine technology, relying on the CMS pre-fault diagnostics and remote diagnostics, wind power equipment life management systems. These research direction made up a direction of power system automation, aimed at enhancing the intelligence level of wind turbines to reduce dependence on maintenance personnel, with the right to run automatically determine the ability of the state to improve equipment availability.

58

5
National Offshore Wind Engineering Research Center spent the three-year construction on completion of the program objectives. With offshore wind power technology research and development of hardware and software conditions, built high-quality personnel, and domestic and foreign universities, research institutes and enterprises have established close cooperative relations in the field of offshore wind conditions with a leading research and development capabilities. 5MW During the project to build a center to 5MW offshore wind turbine research and development as the core, in the cabin layout, electrical system, load calculations, unit control, marine power, marine corrosion, enhancing reliability, grid-friendly, remote monitoring, and other emerging applications direction launched a series of studies, and have achieved excellent research results. Through the implementation of these projects and engineering centers in offshore wind power technology to master the key technology of the core, to the domestic advanced level, which greatly promoted the domestic offshore wind power technology. 2MW 850kW Engineering Center during construction, and vigorously promote the transformation of scientific research and engineering technology to the industry of radiation. Most technological achievements have been applied in the support unit
59

Haizhuang 2MW wind power companies such as Universal and 850kW on the unit, and formed a remarkable business benefits, fully illustrated National Offshore Wind Engineering Research Center for technical achievements with practical engineering conditions and Engineering Center has the technical achievements of engineering capabilities. Engineering centers through joint research and development, technical training, product supply, total package, technical exchanges, and actively promote the technological achievements of the radiation, the current offshore wind power research and technological achievements has covered most of the provinces, municipalities and autonomous regions, and radiation to Denmark , Holland and other countries and regions. It fully fulfilled the engineering center social responsibilities and obligations.

Introduction to the academic committee of experts


( ) , (ISSC) ITTC PRADS1998 2001 2006-2010 20022006 1986 1997 19982002

Wu Yousheng (China ship scientific research center), honorary director of the China ship scientific research center, Chinese academy
60

of engineering, the international famous experts ship mechanics, the CPPCC national committee. National outstanding contributions and government experts, science and part-time member of the general armaments department, the defence industry expert advisory committee, national science and technology achievement prizes at the national defense project review committee, deputy director of the standing committee of the international ship structure assembly (ISSC), international towing tank assembly (ITTC) members of the committee, international ship practical design conference (PRADS) President (1998 ~ 1998), member of standing committee, the standing director of China mechanical society (2006-2010), vice President (2002-2006), vibration engineering society of China, deputy director, executive director of the China society of naval architecture and Marine engineering. Be awarded the national title for great contributions to the young and middle-aged experts in 1986. In 1997 was awarded as national outstanding returned students. In 1998 ~ 2002 was elected to the ninth National People's Congress, as multiple international and domestic academic organization, chairman of the standing committee and journal editors. To undertake the project national key technology research for a long time.
() 711 CIMAC 2013 CIMAC

Jin Donghan (Shanghai research institute of Marine diesel engine) national offshore wind power engineering technology research center academic committee, director of the Chinese academy of engineering, Shanghai institute of Marine diesel engine, (the Chinese heavy 711 research institute) director, chief engineer, the 7th council vice director of China internal combustion engine society, special engine branch, director of the committee, vice director of China internal combustion engine industry association, international society for internal combustion engine (CIMAC) director, director, CIMAC congress executive chairman in 2013.

Gu Xnyi petroleum administration bureau (victory) national offshore


61

wind power engineering technology research center academic committee, deputy director of the Chinese academy of engineering, petroleum mining machinery experts, senior victory petroleum administration bureau chief senior experts, countries have made outstanding contributions and government experts, Highest in shandong province science and technology prizewinners He Liang; hori.
973

Yang Yongping (north China electric power university) national offshore wind power engineering technology research center academic committee, deputy director, professor, doctoral supervisor, north China electric power university, vice President, national energy expert advisory committee, ministry of science and technology industry overall energy saving and emission reduction expert group members, advanced science and technology "twelfth five-year" energy strategic planning expert and renewable energy led, ministry of science and technology "twelfth five-year" energy 973 program strategic planning experts, ministry of science and technology to address climate change "twelfth five-year" science and technology special planning experts, managing director at the Chinese academy of engineering thermal physics, standing director of China energy research institute, the ministry of education science committee, China's colleges and universities of the institute of engineering thermal physics, national pacesetter project and the ministry of education in the new century talents, winner of national outstanding youth fund.

He Yulin (chongqing university) deputy director of the national offshore wind power engineering technology research center academic committee, national famous teachers, professor, doctoral supervisor, enjoy the government special experts, wind power technology and
62

equipment research institute, chongqing university, director of the national teaching base of engineering machinery, mechanical foundation, director of the national experimental teaching demonstration center of standing director at the Chinese academy of engineering graphics, digital design and manufacture, director of professional committee member, the first and the second mechanical engineering disciplines academic in chongqing technology leaders.

Fang Shujia Researcher of China society of naval architecture and Marine engineering) (original China heavy industry group co., LTD., chief engineer, vice President of China society of naval architecture and Marine engineering, director of the academic committee. Vice President of China association of computer automatic measurement and control technology.
725

Sun Mingxian (luoyang institute of ship material) researcher, luoyang institute (institute of the Chinese heavy industry 725) ship material, member of the standing committee of the Chinese society of corrosion and protection, water environment, director of professional committee member, the luoyang ship materials research institute deputy chief engineer, Marine corrosion and protection, deputy director of the national defense science and technology key laboratory. Engaged in corrosion and protection technology and water treatment technology research and development work for over twenty years, is the luoyang institute of ship material corrosion control and water treatment research direction of one of the academic leaders.

Sun Dezhuang (dalian shipbuilding industry group design institute co., LTD.), senior engineer, dalian shipbuilding industry group design institute co., LTD., deputy chief designer.
63

2012

Qi Hesheng (China agricultural machinery industry association) senior engineers, secretary general of the China wind power equipment industrial association branch of agricultural machine, the wind power machinery standardization technical committee, deputy secretary general. National "seventh five-year ", "eighth five-year", "tenth five -year", wind power machinery industry planning, "11th five-year plan" national science and technology support plan "high-power wind power development and the demonstration unit", head of the feasibility study report. 2012 by the ministry of science and technology for "twelfth fiveyear" national science and technology key special (special) wind power key team.
21

Li Junfeng (national climate change strategy research and international cooperation center), national climate change strategy research and international cooperation, director of the center of the China association for comprehensive utilization of resources of renewable energy, director of professional committee member, be engaged in energy economics and the theory of energy and environment research, organized and hosted the renewable energy law in our country, the national medium and long term renewable energy planning drafting, participated in the national medium and long-term science and technology development program, energy law draft, countries respond to climate change and other important documents research and drafting. He also served as member of national energy consulting, the national high technology project expert committee, ministry of environmental protection science and technology committee, vice President of the Chinese renewable energy institute, director of the global wind energy council, the international 21st century renewable energy policy committee vice chairman, etc.).
64

LI Weijia, huazhong university of science and technology, professor, doctoral supervisor, huazhong university of science and technology, vice President of the institute of ship and ocean engineering, school of the academic committee, China computer users association simulation application branch, deputy director of the 7th council.
2008 2001-2008 IACS 1994-2007 CSR 2003-2006 2010 2012 2000 1996 CSNAME 2002

Chen Yingqiu (China classification society) researcher, doctoral supervisor, technical consultation and assessment committee, executive vice President of the China classification society (2008 - present), the former deputy chief engineer of the China classification society (20012008), the international association of classification societies (IACS) hull strength members (1994-2007), the international association of classification society common specification (CSR) bulk carrier technology committee, member of the (2003-2006), the People's Republic of China ministry of transport of the expert committee (2010), the People's Republic of China ministry of industry and information technology high technology Marine scientific research plan of the expert committee and the secretary-general (2012), the director of China society of naval architecture and Marine engineering (1996 - present), project chief expert, CSNAME mechanics committee (2000 - present), deputy director of the China director of the institute of mechanics (2002 - present), executive director of the Beijing mechanical society.

Zhu Junsheng senior engineer of China renewable energy institute, vice President of the Chinese renewable energy institute.

65

IEA-OES

Zhang liang (Harbin engineering university) of national excellent mechanics teacher, professor, doctoral supervisor, Harbin engineering university Marine renewable energy research institute, deep sea engineering technology research center, deputy director of the international energy agency OES executive committee members (IEA and engage), academic committee of cas key laboratory of renewable energy, OES, deputy director of professional committee of China renewable energy society, wind and tidal power professional committee of Chinese mechanical engineering society member, Heilongjiang province mechanics committee and director of fluid mechanics, director of professional committee.

Yang Xiaosheng (longyuan power group company) researcher, longyuan power group company chief engineer, secretary-general of the Beijing institute of electrical engineering and renewable energy power generation branch, China's wind power industry standardization committee secretary general. Tsinghua university graduate student guidance committee, a new energy of the academic committee, the state ministry of science and technology, Chinese academy of sciences "twelfth five-year" expert group deputy head of the renewable energy development planning, national energy committee consulting experts, the expert committee of the Chinese renewable energy institute wind director of professional committee.
1994-1998 19982006

He Dexin(China renewable energy institute) awarded major general ranks, researcher and former China aerodynamics research and development center, chief engineer, vice director of China's renewable
66

energy, wind energy, director of professional committee, the world wind energy association, vice chairman of the Chinese director of the institute of mechanics (1994-1998), the director (1998-2006), China aerodynamics institute director of one, two, three, COSTIND bole prize winner.
1998-2000 1995-20032004

Shi PengFei (China hydropower engineering consulting group corporation) professor-level senior engineer, the original state power company engineer a hydropower planning & design institute vice President (1998-2000), the fifth, vice director of China solar energy (1995-2003), vice President of the Chinese wind energy association (2004 - present).

Zhao Shengxiao (east China survey design institute), senior engineer, engineers, east China sea, east China survey design institute vice President, director of the center for research and development of wind power, new energy engineering design institute, vice President of the national energy administration wind standard council member, China director of the institute of Marine engineering, the Chinese wind and tidal power branch members. Jiangsu, zhejiang, head of the offshore wind power development planning. 4 national first batch of jiangsu offshore wind farm concession projects and demonstration for pre-project technical head.
/ /
67

Jia limin (Beijing jiaotong university), professor, doctoral supervisor, enjoy the government special experts, Beijing jiaotong university, intelligent traffic systems and security technology research center director, state key laboratory of rail traffic control and security chief, a professor at the department of science and technology power electronics team as a whole, China's high-speed train overall expert group deputy head of the joint action plan for independent innovation, energy conservation and emissions reduction to the ministry of science and technology industry overall expert group members, countries respond to climate change special planning transportation expert group deputy head of science and technology; National leading group for information technology in the ministry of transport and distinguished advisory expert; First collaborative innovation center chief scientist; The ministry of railways have made outstanding contribution to the middleaged and young experts, national pacesetter project first, second level young scientists, MAO yisheng railway awards winner, the ministry of railways railway professional technology leader; Electrical engineering society of China rail transit technology branch of director of electric equipment, automation society of China, deputy director of the intelligent automation branch of China/intelligent systems engineering branch of artificial intelligence institute director/deputy director.

Qin Haiyan (Beijing jian scale certification center) researcher, Beijing jian, director of the center for certification of equilibrium. Secretary General of the China renewable energy institute wind energy professional committee. The world wide fund for nature "China sea wind resources development potential analysis" project director. Director of China energy conservation association, China meteorological society climate resources application research committee, deputy director of the committee, the international committee of the China renewable energy council chairman of the joint.
2002 1996 1997 IEEE FELLOW 2007 ,IEEE 2008
68

Guan XiaoHong (xi 'an Jiaotong university) systems engineering of the Changjiang river distinguished scholar, professor, doctoral supervisor, xi 'an Jiaotong university, dean of the school of electronic and information engineering, intelligent network and network security, ministry of education key laboratory chief scientist, the ministry of education of science and technology committee (2002 - present), the United States lee funds outstanding achievement award winner (1996), winner of national outstanding youth fund (1997), IEEE FELLOW (2007 - present), the IEEE robotics and automation society outstanding lecturers (2008 - present).

Dai Huizhu researcher at china electric power research institute, doctoral tutor, a senior adviser of new energy research institute, the original electric power research institute of China wind power research director.
Norbert Hennchen Freqcon CEO 5 Winergy CTO Freqcon 6MW 3.2MW 2.5MW

CEO Norbert Hennchen CEO of Freqcon company (Germany), is mainly engaged in the design of high-power inverter, industrial control, the design of hardware and software, and the overall design is analyzed. studying system. Once in Germany Winergy company as a CTO for five years. Lead Freqcon companies to participate in the design of numbers of wind generating set, such as: 6 MW off shore wind turbine inverter and Pitch Control System; 3.2 MW direct drive wind turbine control system and frequency converter; 2.5 MW direct-drive wind turbines of inverter and variable propeller system and so on.
Frank V.Nielsen LM Vestas

Frank V.N ielsen LM wind power company (Denmark) chief technology officer; Worked at Vestas for ten years, served as the director of product research and development center.
Henrik Simonsen KK-Electronic 2.0MW 2.3MW 3.6MW
69

Bard 5.0MW

Dr Henrik Simonsen KK - Electronic company (Denmark), vice President, Denmark electric energy center, the Danish wind energy association, chairman of the committee. Who is mainly responsible for Siemens 2.0 MW, 2.0 MW and 3.6 MW offshore wind turbines R&D and Bard, 5.0 MW offshore wind turbine control system design work.
() 511

Yang Benxin (China shipbuilding industry corporation researcher , general manager assistant of China shipbuilding industry corporation general manager of chongqing shipbuilding industry company, chairman of CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd, wind power equipment engineering technology research center in chongqing, chief expert, was the "national 511 talents project" science and technology and industry for national defense, national defense science, technology and industry have made outstanding contributions of young and middle-aged experts.
() ()

Yu Shaoqing researcher of (CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd), assistant general manager of the chongqing shipbuilding company, general manager of CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd .China heavy industries have made outstanding contributions to young and middleaged experts, chongqing shipbuilding engineering society of the first board of directors. Chongqing shipbuilding enterprise management association, chongqing wind power equipment engineering technology research center director.
() () 863

Tao

YouChuan

(CSIC(Chongqing)
70

Haizhuang

Windpower

Equipment Co., Ltd) in chongqing liangjiang scholar, researcher, master tutor in computer application. chief engineer of Chongqing shipbuilding company, CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd deputy general manager, chief expert, China computer society, deputy director of the computer engineering and technology branch of the national ministry of science and technology "twelfth five-year" 863 strategic research energy domain experts.
( ) ( )

Tang Wenbing researcher, deputy general manager and chief engineer of CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd. deputy director of chongqing wind power equipment engineering technology research center,.

71