Professional Documents
Culture Documents
FRMA PROFL
COMPANY PROFILE
Firmamz proje durumuna gre bir miktar deiim olmakla birlikte yaklak
olarak retim kapasitemiz aylk
Tnel Kalp : 10.000m
Muhtelif Deme Kalplar 20.000m
Perde ve Kolon Kalplar 5.000m
Kalp skelesi 50.000m
Uzay Kafes Sistemleri 10.000m
elik Konstrksiyon yaklak 500 ton retme kapasitesine sahiptir.
Besides, our company is always next to you with its service support provided
from its base and/or distributors by the experienced technical and
administrative personnel, experienced distributors all over the world. The
contact you will provide with our company at the project stage will bring
better, fast, high quality and economic results for you.
NERU 1985 .
,
.
NERU,
.
: 10.000
: 20.000
: 5.000
50.000
10.000
, 10.000 12.000
, 120
.
500
.
,
,
,
.
,
, , .
,
, ,
.
,
,
, , ,
,
.
1
,
,
,
,
, .
.
,
, ,
,
,
.
,
.
2
AVANTAJLARINIZ
OUR ADVANTAGES
Hz : naat sresini dier sistemlerle mukayese edilmeyecek kadar
ksaltr. gc ve anapara kaybn nler, yatrmn en ksa srede
amortismann salar.
Ekonomi : Kalbn yzlerce kere ayn kalitede kullanlmas yapm
maliyetlerini ok azaltr.
Kalite : Sva gerektirmeyen dzgn yzeyler elde edilmesi ve
llerin standart olmas prekast elemanlarn kullanlmasn ve
ekonomik yan sanayi rnleri olan kap, mutfak tezgah, dolap gibi
rnlerde fabrikasyon rnlere ynelinmesini salar.
Uygulama : Yapm hz, deprem ve dier doal afetlere
dayanmndan dolay dnyann her yerinde kullanlabilir. Kalp
kullanm iin ok ksa bir eitim ile kalifiye eleman gereksinimi
olmadan iilik karlanr.
Modler : Kalp standart paralardan olutuu iin ii biten kalplar
paketlenip saklanabilir. Yeni iinizde ok az ilavelerle yeniden
kullanlabilir.
:
. ,
.
:
.
:
,
, , .
:
,
.
.
.
:
,
.
, ,
.
3
Product we used for the formwork is high quality hard sheet metal from
Ereli demir elik.
Specially extruded U120 sections are used under the boards.
Significant amount of savings is obtained from workmanship costs for
removing and erecting of the formwork due to the new developed roller
bearing skid system.
Bottom hole has been raised 100 mm from bottom.
Formwork joining plate is also used for the joining of the boards.
Setuskur alignment system is used for the plumb line and deflection
alignment at supports.
Free movable parts of the supports have been improved by roller
bearing details.
Level I-beam is joined by a sliding system without welding.
Used accessory materials shall be delivered as galvanized.
Formworks used in our company are painted in full automatic oven
system.
Side U beams and omegas of the formwork are extruded at pipe plants.
Tunnel posts wheels have been improved and strengthened.
Bolt reinforcements have been reinforced by 10 mm plates.
,
.
U120.
.
100 .
.
( )
.
()
.
.
.
.
U
.
.
10
.
4
,
,
,
.
,
,
.
, ,
,
,
.
5
1. Aama
1. Stage
1.
2. Aama
2. Stage
2.
Supports with the suitable number based on the tunnel opening are
joined to the curtain board with M14x80 bolts and alignment
mechanism is located in the bottom.
510
, .
,
. ,
.
1480
,
.
3. Aama
3. Stage
3.
4. Aama
4. Stage
4.
Idle free ends of the supports are joined to the support holes on the
floor board with M14x80 bolts.
1430
, .
1480.
5. Aama
5. Stage
5.
6. Aama
6. Stage
6.
Tnel aklna gre uygun numaral atallar dikme tekeri ile perde
panosu arasna balanlr. Perde panosuna M14x80 cvata ile
dikme tekerine M14x30 cvata ile ekilde grld gibi balanr.
In this stage, post wheel is joined to the post wheel hole on the
middle section of the wall board with M14x80 bolts.
Yokes with the suitable number based on the tunnel opening are
joined between the post wheel and curtain board. They are joined to
the curtain board with M14x80 bolt and to the post wheel with
M14x30 bolt as shown in the picture.
1480 ,
.
. 1480
, 1430
.
7. Aama
7. Stage
7.
8. Aama
8. Stage
8.
Tunnels installed by this way are joined side by side based on the
conditions on the installation drawings if required. Sufficient
number of centering U beam is mounted in 5 rows vertically at two
tunnels and based on the tunnel opening horizontally for that.
, ,
,
.
5 . U
, , ,
.
1480 ,
( ).
9. Aama
9. Stage
9.
10. Aama
Rear board of this tunnel are joined to the tunnel according to the
installation card by aligning the side U beams facing to each other.
,
U .
,
U
1480.
11. Aama
11. Stage
11.
12. Aama
Formwork lifting hole is drilled on the floor board taking the dimensions
in X and Y axis based on the sizes indicated on the installation card.
Level I beam is installed on the bottom of the formwork under this point
as shown an the picture. Hanger hooks are hanged to the side U beams
and level I beam is fastened into the formwork without welding.
,
Y
. ,
, .
U,
.
.
.
13. Aama
13. Stage
13.
14. Aama
Door and window reserves, if any, are marked on the stood half
tunnel formwork as shown on the picture based on the installation
cards.
Floor space reserves, if any, are also marked based on the given X
and Y axis as indicated on the installation cards.
( )
.
X Y,
, .
15. Aama
15. Stage
15.
16. Aama
Yine montaj kartlarndaki verilen lye gre varsa perde aln kalb
yarm tnel kalbn zerine balanr.
Floor front formwork is joined over the half tunnel formwork based
on the size given on the installation cards.
, ,
,
.
,
.
17. Aama
18. Aama
,
.
19. Aama
19. Stage
19.
20. Aama
For the spaces in the tunnel project, which continues with the
placement of one hand, hollow reserves of cladding and partitions
are attached to the form as indicated in the assembly of formwork
project.
,
.
,
. ,
,
.
10
21. Aama
21. Stage
21.
22. Aama
22. Stage
22.
,
.
,
,
.
23. Aama
23. Stage
23.
24. Aama
24. Stage
24.
At the last stage before casting of the concrete into the tunnel
formwork, axis angle is mounted on the axle stands and brackets
are closed.
.
, ,
,
.
11
.
,
. ,
.
12
25. Aama
25. Stage
25.
26. Aama
26. Stage
26.
Sonra altda ortada gene dik bir boru ile ve st ortada ksmnda
ular ayarl vidal yine gene dik bir boru ile kelepelenir. Resimde
grld gibi genin zerinde bulunan yerlere projede belirtilen
ahaplar balanr.
,
.
( )
.
, ,
.
, .
27. Aama
27. Stage
27.
28. Aama
28. Stage
28.
, .
,
.
13
29. Aama
29. Stage
29.
30. Aama
30. Stage
30.
:
,
.
31. Aama
31. Stage
31.
32. Aama
32. Stage
32.
,
.
,
. (
,
).
14
33. Aama
33. Stage
33.
34. Aama
34. Stage
34.
. 13, ,
,
.
14, ,
,
.
35. Aama
35. Stage
35.
36. Aama
36. Stage
36.
Daha sonra ise bir alt katta veya yan gzlerde olan tnel kalplar yeni
beton dklecek yere tanrlar. Ve bu ilem tm katlar ve tm
bloklar bitinceye kadar devam eder.
Later, tunnel formworks found at next lower floor or side cells are
carried to places where new concrete is poured. This process is
repeated until all layers and blocks are completed.
,
, ,
.
, ,
,
.
15
SR
KOD
MALZEME
MATERIAL
L (mm)
DIMENSIONS
AIRLIK kg
WEIGHT kg
kg
T 1 (2520)
2500 * 2520
371.0
T 2 (2520)
1250 * 2520
212.0
T 3 (2520)
625 * 2520
125.0
T 1 (2640)
2500 * 2640
384.0
T 2 (2640)
1250 * 2640
219.0
T 3 (2640)
T 1 (2730)
625 * 2640
129.0
Perde Panosu
2500 * 2730
393.0
T 2 (2730)
1250 * 2730
224.0
T 3 (2730)
625 * 2730
331.0
10
P 1 (2520)
2500 * 2823
YELLOW PAINTED
11
P 2 (2520)
1250 * 2823
12
P 3 (2520)
625 * 2823
13
P 1 (2640)
2500 * 2943
14
P 2 (2640)
1250 * 2943
15
P 3 (2640)
625 * 2943
16
P 1 (2730)
D Perde Panosu
2500 * 3033
17
P 2 (2730)
1250 * 3033
18
P 3 (2730)
625 * 3033
19
D1 D11 D12
L * 2850
20
D2 D21 D22
L * 2550
21
D3 D31 D32
L * 2250
323.0 176.0
96.0
22
D9 D91 D92
L * 2050
271.0 149.0
82.0
23
D4 D41 D42
L * 1950
261.0 143.0
79.0
24
D5 D51 D52
L * 1650
228.0 125.0
69.0
25
D6 D61 D62
Deme Panosu
L * 1350
195.0 107.0
59.0
26
D8 D81 D82
Furnishing Paneu
L * 1250
185.0 101.0
56.0
27
D7 D71 D72
L * 1050
163.0
49.0
28
L1 - R1
L * 2850
29
L2 - R2
L * 2550
30
L3 - R3
L * 2250
31
L9 - R9
L * 2050
32
L4 - R4
L * 1950
33
L5 - R5
L * 1650
34
L6 - R6
Arkalk Panosu
L * 1350
35
L8 - R8
Hod Paneau
L * 1250
36
L9 - R9
L * 1050
37
M1
2500 * 2000
570.0
38
M2
2500 * 1800
550.0
39
M3
2500 * 1600
528.0
40
M4
2500 * 1400
506.0
41
M5
2500 * 1200
485.0
42
M6
1875 * 2000
482.0
43
M7
1875 * 1800
456.0
44
M8
Tnel Masas
1875 * 1600
449.0
45
M9
Tunnel Desk
1875 * 1400
433.0
46
M10
47
48
49
50
YELLOW PAINTED
1875 * 1200
89.0
YELLOW PAINTED
YELLOW PAINTED
416.0
L * 350
95.0
48.0
25.0
Adaptr Pano
L * 300
90.0
46.0
23.0
Adapter Panel
L * 250
85.0
43.0
22.0
L * 200
79.0
40.0
20.0
16
AIKLAMA
EXPLANATION
YELLOW PAINTED
SR
MALZEME
MATERIAL
KOD
51
52
L (mm)
DIMENSIONS
AIRLIK kg
WEIGHT kg
kg
L * 350
L * 300
L * 250
106.0 103.0
99.0
L * 200
100.0
94.0
YELLOW PAINTED
53
54
Kuyu Ke Kalb
55
KKP
56
PA6
PA5
PA4
AIKLAMA
EXPLANATION
97.0
105.0
115.0
125.0
E. GALVANZ
L * 2823
L * 2943
L * 3033
323.0 176.0
57
PA3
PA2
PA1
58
PA9
PA8
PA7
59
DA1
L * 2850
36.0
60
DA2
L * 2550
32.4
61
DA3
L * 2250
28.8
62
DA9
L * 2050
26.4
63
DA4
L * 1950
25.2
64
DA5
L * 1650
21.6
65
DA6
L * 1350
18.0
66
DA8
L * 1250
16.8
67
DA7
L * 1050
14.4
68
KR 100 / 220
69
KR 90 / 220
70
KR 80 / 220
YELLOW PAINTED
96.0
YELLOW PAINTED
L * 900 * 2200
L * 800 * 2200
Deme Rezervasyonu
Furnishing Reservation
52.0
YELLOW PAINTED
22.5
YELLOW PAINTED
4.9
E. GALVANZ
22.0
YELLOW PAINTED
3.5
E. GALVANZ
Door Reservation
L=250-200-180 mm
71
DR 100 / 100
72
DDA
73
DDE
74
TP
75
TPA
76
S4
77
S5
Terazi Putreli
Balance Girder
M / Kg
Kontrafi
1950
31.5
1650
30.5
78
S6
Counter Plug
1350
28.5
79
S7
1050
27.0
80
SD 4
1950
14.5
81
SD5
1650
13.0
82
SD 6
Wheel Post
1350
12.0
83
SD 7
1050
11.5
Teker Dikmesi
YELLOW PAINTED
PAINTED
&
E. GALVANZ
E.GALVANIZ
84
C4
1950
11.5
85
C5
1650
10.0
86
C6
Post Fork
1350
8.0
87
C7
1050
6.0
88
AT
Ayarl Teker
Adjustable Wheel
15.0
PAINTED
&
E.GALVANIZ
89
TM
Merdiven
Stairs
21.0
E.GALVANIZ
90
Y1
600 * 2500
42.0
91
Y2
600 * 1250
25.0
92
Y3
600 * 625
18.0
Dikme atal
17
E.GALVANIZ
E.GALVANIZ
SR
KOD
93
KCI 1
94
KCI 2
MALZEME
MATERIAL
L (mm)
DIMENSIONS
AIRLIK kg
WEIGHT kg
kg
AIKLAMA
EXPLANATION
L = 6000
185.0
L = 7000
210.0
L = 8000
225.0
3.8
E.GALVANIZ
3.3
E.GALVANIZ
1.30
E.GALVANIZ
RED PAINTED
95
KCI 3
96
KCA
97
98
KCI Dayamas
KCI Resting
KCI
KCI
Boru Kelepesi
Pipe Cuff
Korkuluk A
Ballustrade Net
KCC
17150
1.5 x 1.5
99
KAG
100
DPTI 1
101
DPTI 2
D Cephe Konsolu
102
DPTI-A
DPTI
8.8
E.GALVANIZ
103
DPTI-K
DPTI Kilidi
DTPI Lock
DPTI
5.4
E.GALVANIZ
104
KRT
17.5
E.GALVANIZ
Kurt Az
Dovetail
Sahanlk skelesi
Platform Gangwalk
105
m2
1750
52.0
1750
74.0
RED PAINTED
SAH
RED PAINTED
106
DPTI-AP
DPTI
107
DPTI-FP
DPTI
108
DPTI-DP
DPTI
109
KE
Kor. Dikmesi
Ballustrade Post
110
AKE
A. Kor. Dikmesi
111
AKL-AKR
112
AK
113
M * 100 * 100
12.6
E.GALVANIZ
M * 40 * 40
3.5
E.GALVANIZ
M * U80
8.6
RED PAINTED
4.2
E.GALVANIZ
A. Kor. Post
9.5
E.GALVANIZ
G. Aks Kalb
S. Axle Form
48.0
NATUREL
Aks Kalb
Axle Form
16.5
NATUREL
AKA
A. Aks Sehpas
A.Axle Carriage
16.5
NATUREL
114
AKS
Aks Sehpas
Axle Carriage
5.2
NATUREL
115
AKTS
T. Aks Sehpas
T. Axle Carriage
3.8
NATUREL
116
AKKC
Aks Kelepesi
Axle Cuff
3.4
NATUREL
117
AKKT
T. Aks Kelepesi
T. Axle Cuff
3.1
NATUREL
118
AKF
A. Aks Kesici
A. Axle Cutter
2.0
NATUREL
119
CRY
kartma Ray
Rejection Rail
5.0 ?
E.GALVANIZ
120
YRY
Yerletirme Ray
Placement Rail
7.0 ?
E.GALVANIZ
KN
Konik
L= 248 / 198 / 178
Conical
122
TIJ
Tij Takm
248 / 198
Rod Kit
123
ITK
tekleme Kebenti
Pushing Bracket
124
OCK
Istma Oca
Heating Oven
125
VKR
Kaldrma geni
126
MKR
Montaj geni
127
TKH
128
CKH
129
121
2.2
5.5
5.2
2.5
E.GALVANIZ
10.5
Lifting Triangle
60.0
YELLOW PAINTED
Mounting Triangle
10.8
YELLOW PAINTED
6.5
10.1
DKH
41.7
130
AWR
Arkalk Anahtar
1.0
E.GALVANIZ
2.6
E.GALVANIZ
0.8
RED PAINTED
Hod Key
L = 750 / 700
2.0
NATUREL
131
RWR
Tavan Anahtar
Ceiling Key
132
CAD
adr
Tent
133
TBX
Takm Sand
Tool Kit
55.0
YELLOW PAINTED
134
SEP
Malzeme Sepeti
Material Basket
100.0
E.GALVANIZ
135
MSK
Mknatsl akl
0.8
M2
18