You are on page 1of 55

ENVI CO Consul t ant s

Company i nf or mat i on
Contents
. Company Experience
. Company Profile
1
. Experience with GS
. Conclusion
Company Pr of i l e
ENVICO
3
ENVICO is Bridge Engineering Experts Group
ENVICOs Main Job has been
I. Company Profile
ENVICOs Engineers are Expert for Bridge Design & Construction Engineering.
Planning
&
Design
Construction
Engineering
Technical
Consulting
Research
&
Development
ENVICOs Engineers
More than 70% of Engineers possesses Masters Degree or More
More than 90% of Engineers has worked has experiences in site
engineering and has involved in tender design of cable bridge.
Company History
4
I. Company Profile
Aug. 2003 Established ENVICO Consultants Co., Ltd.
Dec. 2003 Registered Field of Civil-Structure at Korea
Engineering & Consulting Association(KENCA)
Sep. 2004 Registered Research Institute
Nov. 2009 Established (Subsidiary Company)
KWANSOO E&C Co., Ltd. - Bridge Construction Company
Sep. 2010 Registered INNO-BIZ in KOREA
Oct. 2010 Registered Venture Business in KOREA
Technical Network for Bridge
5
I. Company Profile
Configuration of Technical Personnel Network Including Construction Engineering,
Construction and R&D as well as Design for bridge
ENVICO
Consultants
KWANSOO
E & C
Construction of
Cables & Girders
(ENVICOs subsidiary firm)
Planning & Design,
Construction Engineering,
R&D
Staff Composition
6
I. Company Profile
26 Bridge
Engineers
in
ENVICO
CEO CEO Dongho YOO Dongho YOO
Others Others 4 person 4 person
Vice President Vice President Yunki SON Yunki SON
Project Manager Project Manager
Changsun LEE / Seongheon KIM
/ Wooseok LEE
Changsun LEE / Seongheon KIM
/ Wooseok LEE
Chief Engineer Chief Engineer
Seungho CHOI / Dohyung KIM
/ Chungheon CHOI
Seungho CHOI / Dohyung KIM
/ Chungheon CHOI
Total : 30 Person
Engineer Engineer 18 person 18 person
24years / MSCE 24years / MSCE
Professional Engineer Civil Engineering Structures Professional Engineer Civil Engineering Structures
1991 ~ 1993 : Korea Highway Corporation (Researcher)
1993 ~ 2003 : Yooshin Co. Ltd. (Project Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (President)
2009 ~ Present : KWANSOO E&C (President)
1991 ~ 1993 : Korea Highway Corporation (Researcher)
1993 ~ 2003 : Yooshin Co. Ltd. (Project Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (President)
2009 ~ Present : KWANSOO E&C (President)
CV of Major Staff
7
I. Company Profile
Employment Record
Tender design of Lusail Marine Bridge(CE)
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Ulsan Bridge(CE) / Yi Sun-sin Bridge(CE)
Tender design of Lusail Marine Bridge(CE)
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Ulsan Bridge(CE) / Yi Sun-sin Bridge(CE)
Work experience
Dongho YOO
Career
Qualification
Tender design of Lusail Marine Bridge(DB/CE)
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Ulsan Bridge(CE) / Sorok Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
Tender design of 6
th
Crossing Bridge(DB)
Tender design of Lusail Marine Bridge(DB/CE)
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Ulsan Bridge(CE) / Sorok Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
Tender design of 6
th
Crossing Bridge(DB)
17years / MSCE 17years / MSCE
Professional Engineer Civil Engineering Structures Professional Engineer Civil Engineering Structures
1998 ~ 2003 : Yooshin Co. Ltd. (Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (Vice President)
1998 ~ 2003 : Yooshin Co. Ltd. (Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (Vice President)
CV of Major Staff
8
I. Company Profile
Employment Record
Work experience
Yunki SON
Career
Qualification
16years / MSCE 16years / MSCE
Professional Engineer Civil Engineering Structures Professional Engineer Civil Engineering Structures
1999 ~ 2009 : Dasan Consultansts Co. Ltd(Senior Engineer)
2009 ~ Present : ENVICO Consultants Co., Ltd(Project Manager)
1999 ~ 2009 : Dasan Consultansts Co. Ltd(Senior Engineer)
2009 ~ Present : ENVICO Consultants Co., Ltd(Project Manager)
CV of Major Staff
9
I. Company Profile
Employment Record
Basic Design New Millennium Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Yi Sun-sin Bridge(CE)
Construction Engineering for Ulsan Bridge(CE)
Super long-span Bridge R&D Project 1-1-2-3 Future Cable Supported Bridge
Basic Design New Millennium Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Yi Sun-sin Bridge(CE)
Construction Engineering for Ulsan Bridge(CE)
Super long-span Bridge R&D Project 1-1-2-3 Future Cable Supported Bridge
Work experience
Changsun LEE
Career
Qualification
CV of Major Staff
10
I. Company Profile
Seongheon KIM
l Work Experience
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design DanDeung Bridge(DB)
Tender design of 6
th
Crossing Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Yi Sun-sin Bridge(CE)
Construction Engineering for Ulsan Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
l Work Experience
Basic and Detailed Design New Millennium Bridge(DB)
Basic Design DanDeung Bridge(DB)
Tender design of 6
th
Crossing Bridge(DB)
Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
Construction Engineering for Yi Sun-sin Bridge(CE)
Construction Engineering for Ulsan Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
Career : 10years / MSCE / Civil Engineer
Wooseok LEE
l Work Experience
Basic and Detailed Design for An access Road construction of
Yeosu National Industrial complex(Section III)(DB)
Detailed Design of SinGal Overpass Bridge (DB)
Construction Engineering for Ulsan Bridge(CE)
Construction Engineering for Lusail Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
l Work Experience
Basic and Detailed Design for An access Road construction of
Yeosu National Industrial complex(Section III)(DB)
Detailed Design of SinGal Overpass Bridge (DB)
Construction Engineering for Ulsan Bridge(CE)
Construction Engineering for Lusail Bridge(CE)
Construction Engineering for 3
rd
Bosphorus Bridge(CE)
Career : 10years / MSCE / Civil Engineer
CV of Major Staff
11
I. Company Profile
l Work Experience
Design-Build in the access
Road Between Hwayang
& Jeokguem(SectionIII)(DB)
Design in the access Road
for Cheongju Technoplis(DB)
Construction Engineering
for Yangyang Bridge(CE)
Construction Engineering
for Sepung Bridge(CE)
l Work Experience
Design-Build in the access
Road Between Hwayang
& Jeokguem(SectionIII)(DB)
Design in the access Road
for Cheongju Technoplis(DB)
Construction Engineering
for Yangyang Bridge(CE)
Construction Engineering
for Sepung Bridge(CE)
Seungho CHOI
Career : 10years / MSCE
l Work Experience
Basic and Detailed Design
Yi Sun-sin Bridge(DB)
Basic Design DanDeung
Bridge(DB)
Construction Engineering
for Jeokgeum Bridge(CE)
Construction Engineering
for Ulsan Bridge(CE)
l Work Experience
Basic and Detailed Design
Yi Sun-sin Bridge(DB)
Basic Design DanDeung
Bridge(DB)
Construction Engineering
for Jeokgeum Bridge(CE)
Construction Engineering
for Ulsan Bridge(CE)
Dohyung KIM
Career : 9years / BSCE
l Work Experience
Basic and Detailed Design
Yi Sun-sin Bridge(DB)
Basic Design DanDeung
Bridge(DB)
Construction Engineering
for Yi Sun-sin Bridge(CE)
Construction Engineering
for Ulsan Bridge(CE)
l Work Experience
Basic and Detailed Design
Yi Sun-sin Bridge(DB)
Basic Design DanDeung
Bridge(DB)
Construction Engineering
for Yi Sun-sin Bridge(CE)
Construction Engineering
for Ulsan Bridge(CE)
Chungheon CHOI
Career : 8years / MSCE
12
(Since 2009, ENVICOs Subsidiary firm)
Kwansoo is Bridge Construction Experts Group.
Kwansoos Main Job has been
I. Company Profile
Company Profile of Kwansoo
Supply
of
Cable System
Construction of
Suspension Bridge
&
Cable Stayed Bridge
Supply
of
Cable System
Construction
Engineering
&
Technical
Consulting
Kwansoos member have participated in most of suspension bridges
in Korea.
Kwansoo is the leader in construction of cable bridge especially for
suspension bridge.
Company Ex per i enc e (Maj or Pr oj ec t )
Project List
14
II. Company Experience
Lusail Marine Br.
(Tender Design in Oversea)
Cheongpung Br.
(Design)
Yi Sun-sin Br.
(Construction Engineering)
Sepung Br.
(Construction Engineering)
Mokpo Br.
(Construction Engineering)
1st Gong Chon Br.
(Design)
3rd Bosphorus Br.
(Tender Design in Oversea)
6
th
Crossing Br.
(Tender Design in Oversea)
New Millennium Br.
(Design)
Major Project
Major Project
Including major projects, over 130 projects in Design, CE and Research Experience
Over a decade.
ENVICO is the best pathfinder in bridge engineering
by having a successful track record in this field.
R & D
Design
Tender
Design
in Oversea
Construction
Engineering
15
II. Company Experience
Tender of I c oni c Br i dge (UAE)
/ May.2007~J ul .2007 / 250m / Cabl e St ayed Br i dge / Samsung
Tender of West er n Fr eeway Sea Li nk Pr oj ec t (I ndi a)
/ Jul .2008~Oc t .2008 / 13.75k m / PC Box Gi r der / Samsung
Tender of 6
t h
Cr ossi ng Br i dge (UAE)
/ Sep.2008~Nov.2008 / 610m / Ar ch Br i dge / Samsung
Er ec t i on Desi gn f or Tender of I zmi t bay Br i dge (Tur key)
/ Sep.2010~Nov.2010 / 1,500m / Suspensi on Br i dge / Hyundai
Er ec t i on Desi gn f or Tender of Lusai l Mar i ne Br i dge (Qat ar )
/ Feb.2011~Mar.2011 / 129m / Suspensi on Br i dge / Samsung
Tender Design in Oversea (Project/Period/Main span/Bridge Type/Client)
Project List
16
II. Company Experience
Tender of Mumbai Tr ans Har bour Li nk Pr oj ec t (I ndi a)
/ May.2012~Aug.2012 / 22k m / Cabl e St ayed Br i dge / GS
Tender of Vam Cong Br i dge Const r uc t i on Pr oj ec t (Vi et nam)
/ Mar .2013~J un.2013 / 450m / Cabl e St ayed Br i dge / GS
Tender of Padma Mul t i pur pose Br i dge Pr oj ec t (Bangl adesh)
/ Dec .2013~Feb.2014 / 150m / Tr uss Br i dge / Dael i m
Tender of 3
r d
Bosphor us Br i dge (Tur k ey)
/ Mar .2012~Apr .2012 / 1,465m / Suspensi on Br i dge / POSCO
(Er ec t i on Desi gn)
/ Sep.2012~Pr esent / 1,408m / Suspensi on Br i dge / DAELI M
(Desi gn Modi f i c at i on and CE)
Project List
Tender Design in Oversea (Project/Period/Main span/Bridge Type/Client)
Project List
17
II. Company Experience
Basic & Detail Design (Project/Period/Main span/Bridge Type/Client)
Det ai l ed Desi gn of CheongPung Br i dge
/ Aug.2004~Dec .2004 / 327m / Cabl e St ayed Br i dge / Dael i m
Basi c Desi gn DongMak Cheon Br i dge
/ Feb.2005~Mar .2005 / 75m / Ar c h Br i dge / Kor ea Devel opment Cor p.
Basi c Desi gn Gosaek Br i dge
/ May.2005~J ul .2005 / 105m / Ar c h Br i dge / SsangYong
Det ai l ed Desi gn NamChang Br i dge
/ Aug.2005~Dec .2005 / 160m / Ar c h Br i dge / Kor ea Devel opment Cor p.
Det ai l ed Desi gn of 1st GongChon Br i dge
/ Apr .2007~May.2007 / 300.5m / Cabl e St ayed Br i dge / PyungHw a
Basi c Desi gn of DanDeung Br i dge f or Desi gn-Bui l d i n t he ac c ess Road
f or Gogunsan i sl ands pr oj ec t
/ Dec .2008~Mar .2009 / 330m / Suspensi on Br i dge / Samsung
Project List
18
II. Company Experience
Det ai l ed Desi gn f or t he al t er nat i ve of Tow er Cr ossbeam i n Yeosu
i ndust r i al si t e r oad c onst r uc t i on pr oj ec t (Yi Sun-si n Br i dge)
/ Dec .2008~J un.2009 / 1,545m / Suspensi on Br i dge / Dael i m
Basi c and Det ai l ed Desi gn of New Mi l l enni um Br i dge f or Desi gn-Bui l d
i n Road Const r uc t i on Pr oj ec t Bet w een Aphae and Amt ae
/ J un.2009 ~ Aug.2010 / 2@650m / Suspensi on Br i dge / Dael i m
Det ai l ed Desi gn of Si nGal Over pass Br i dge
/ Dec .2010~Dec .2011 / 150m / Ex t r adosed Br i dge / Hyundai
Er ec t i on Desi gn of Suspensi on br i dge f or Desi gn-Bui l d i n t he
ac c ess Road Bet w een Hw ayang and J eok guem
/ Apr .2011~May 2011 / 750m / Suspensi on Br i dge / Samsung
Det ai l ed Desi gn of Saddl e, Band, Hand Rope Syst em
The 3
r d
Bosphor us Br i dge
/ J an.2013~J un.2014 / 1,408m / Suspensi on Br i dge / T-ENGI NEERI NG
Basic & Detail Design (Project/Period/Main span/Bridge Type/Client)
19
II. Company Experience
Construction Engineering (Project/Period/Main span/Bridge Type/Client)
Const r uc t i on Engi neer i ng of t he 2nd J i nDo Br i dge
/ Nov.2003~Dec .2004 / 344m / Cabl e St ayed Br i dge / Hyundai
Const r uc t i on Engi neer i ng and Saf et y Check of Geo-Gum Br i dge
(Sor ok Br i dge)
/ Dec .2005~Dec .2006 / 250m / Suspensi on Br i dge / Dael i m
Const r uc t i on Engi neer i ng f or t he Cabl e er ec t i on i n Yeosu i ndust r i al si t e
r oad c onst r uc t i on pr oj ec t (Yi Sun-si n Br i dge)
/ Apr.2009~Mar.2011 / 1,545m / Suspensi on Br i dge / Dael i m
Const r uc t i on Engi neer i ng f or t he Cabl e er ec t i on of Jeok geum Br i dge
/ Dec .2010~Jan.2011 / 850m / Suspensi on Br i dge / Dael i m
/ Sep.2011~Dec .2011 / 850m / Suspensi on Br i dge / Dael i m
Const r uc t i on Engi neer i ng f or t he Gi r der er ec t i on i n Yeosu i ndust r i al si t e
r oad c onst r uc t i on pr oj ec t (Yi Sun-si n Br i dge)
/ Sep.2011~Dec .2011 / 1,545m / Suspensi on Br i dge / Kwanso E& C
Project List
20
II. Company Experience
Const r uc t i on Engi neer i ng i n Yeosu i ndust r i al si t e r oad c onst r uc t i on
pr oj ec t (Yi Sun-si n Br i dge)
/ Jun.2010~Apr.2012 / 1,545m / Suspensi on Br i dge / Kwanso E& C
I ndependent check f or DanDeung Br i dge Desi gn and Const r uc t i on
Engi neer i ng f or t he Cabl e er ec t i on of DanDeung Br i dge
/ Nov.2011~Apr.2012 / 400m / Suspensi on Br i dge / Dael i m
Const r uc t i on Engi neer i ng f or Mok po Br i dge
/ Aug.2009~Dec .2010 / 500m / Cabl e St ayed Br i dge / GS
Const r uc t i on Engi neer i ng f or t he Cabl e er ec t i on of Jeok geum Br i dge
/ Mar.2012~Sep.2012 / 850m / Suspensi on Br i dge / Kwanso E& C
Const r uc t i on Engi neer i ng of Lusai l Mar i ne Br i dge (Qat ar )
/ Nov.2011~Sep.2012 / 129m / Suspensi on Br i dge / Samsung
Project List
Construction Engineering (Project/Period/Main span/Bridge Type/Client)
21
II. Company Experience
Const r uc t i on Engi neer i ng f or Sepung Br i dge
/ Dec .2010~Aug.2013 / 220m / Cabl e St ayed Br i dge / Dael i m
Const r uc t i on Engi neer i ng f or Cabl e & Gi r der er ec t i on i n Ul san Br i dge
/ Sep.2012~Dec .2014 / 1,150m / Suspensi on Br i dge / Hyundai St eel
Const r uc t i on Engi neer i ng i n Ul san Br i dge Pr oj ec t
/ Feb.2011~Mar.2015 / 1,150m / Suspensi on Br i dge / Hyundai
Const r uc t i on Engi neer i ng of 3
r d
Bospor us Br i dge (I st anbul , Tur key)
/ May2013~ Dec .2015 / 1408m / Suspensi on & St ayed Br i dge / Hyundai
Project List
Construction Engineering (Project/Period/Main span/Bridge Type/Client)
22
II. Company Experience
Engi neer i ng Technol ogy Devel opment f or Suspensi on Br i dge
/ Nov.2011~Dec .2012 / POSCO
The Cabl e Tw i st i ng St udy by Cabl e 3D Wi deni ng f or 3D Suspensi on
Br i dge (2
ND
Namhae Br i dge)
/ Apr.2012~Dec .2012 / GS
I nt er nal i zat i on of Cabl e Er ec t i on Technol ogy f or Long Span
Suspensi on Br i dge
/ Apr.2011~Mar.2013 / Samsung
Devel opment f or Mai n Cabl e Geomet r y Cont r ol
/ Apr.2013~Nov.2014 / GS
Super l ong-span Br i dge R& D Pr oj ec t 1-1-2-3 Fut ur e Cabl e Suppor t ed
Br i dge Mul t i -span Suspensi on Br i dge / Cabl e-St ayed and Suspensi on
Br i dges
/ May 2009~Dec .2015 / MLTM
Research (Name/Period/Client)
Project List
23
Project Name : 3
rd
Bosphorus Bridge Project
Location : Istanbul, Turkey
Period : Mar. 2012 ~ Present
Client : ICA / Hyundai-SK Joint Venture / T-Engineering
Bridge Outline
- Name : 3
rd
Bosphorus Bridge
- Type : Hybrid Cable-Stayed Suspension Bridge
- Total Length of Main Bridge: 2,165m (378+1,408+378)
- Girder : Concrete and Steel Box Girder
Project Name of Consulting Services by ENVICO :
- Erection Design for Superstructure of Suspension Bridge
- Erection Design for Tender Design of 3
rd
Bosphorus Bridge
- Detailed Design of Saddle, Band and Hand Rope System
- CE of Suspension Part for 3
rd
Bosphorus Bridge
Work Scope
- Preparation of tender & Estimation of construction cost
- Detailed Design for suspension bridge part
- Erection planning & Check of the construction schedule
II. Company Experience
3
rd
Bosphorus Bridge (Turkey)
Tender Design in Oversea
(1 / 2)
(Including Design & CE)
24
II. Company Experience
Project Type Work Scope Client
Tender
(P.P.P)
Erection Concept for
Main Cable & Girder
POSCO
Tender
(EPC)
Erection Method,
Temp. Structure Design
DAELIM
Detailed Design
Saddle, Band and
Hand rope system
T-engineering
Construction
Engineering 1
Basic erection Sequence,
Temp. Structure Design
Geometry Control
HDSK
Construction
Engineering 2
Detailed erection
Sequence, Method
statements
Hyundai Steel
ENVICO is participating in all engineering phases of 3
rd
Bosphorus Bridge
3
rd
Bosphorus Bridge (Turkey)
(2 / 2)
Tender Design in Oversea (Including Design & CE)
25
Project Name : Lusail Development Primary Infrastructure
(Construction Package 3A, Phase2)
Location : Lusail, Qatar
Period : Feb. 2011 ~ Mar. 2011
Client : Lusail Real Estate Development Company / Samsung
Bridge Outline
- Name : Lusail Marine Bridge
- Type : Self anchored Suspension Bridge
- Span Length : 204m (75+129)
Project Name of Consulting Services by ENVICO :
- Erection Design for Tender of Lusail Marine Bridge
- Construction Engineering of Lusail Marine Bridge
Work Scope
- Tender Design for Bridge Erection
- Construction Engineering for Cable & Girder Erection
- Geometry Control of Cable, Tower and Girder Erection
II. Company Experience
Lusail Marine Bridge (Qatar)
(1 / 2)
Tender Design in Oversea (Including CE)
26
II. Company Experience
Project Type Work Scope Client
Tender
Estimation of Quantity,
Temp. Structure Design
Samsung
Construction
Engineering
Detailed Erection Sequence,
Temp. Structure Design,
Geometry Control
Samsung
Lusail Marine Bridge (Qatar)
(2 / 2)
Tender Design in Oversea (Including CE)
27
Project Name : Tender Design of Izmit Bay Bridge (Turkey)
Location : Izmit Bay, Turkey
Period : Sep. 2010 ~ Nov. 2010
Client : The NMAYG Joint Venture / Hyundai
Bridge Outline
- Name : Izmit Bay Bridge
- Type : 3 span Suspension Bridge
- Total Length of Main Bridge: 2,800m (625+1,550+625)
Project Name of Consulting Services by ENVICO :
- Erection Design for Tender Design of Izmit Bay Bridge
(Turkey)
Work Scope
- Erection planning & Check of the construction schedule
- Estimation of construction cost
- Preparation of tender document
II. Company Experience
Izmit Bay Bridge (Turkey)
Tender Design in Oversea
28
II. Company Experience
6
th
Crossing Bridge (UAE)
Project Name : The 6
th
Creek Crossing Bridge
Location : Dubai, UAE
Period : Sep. 2008 ~ Nov. 2008
Client : Dubai Roads & Transport Authority / Samsung
Bridge Outline
- Name : 6
th
Crossing Bridge
- Type : Arch Bridge
- Total Length of Main Bridge : 610 + 380 = 990m
- Main Span Length : 610m
- Girder : PSC Box Girder with Strut
Project Name of consulting services by ENVICO :
- Tender Design of 6
th
Crossing Bridge
Work Scope
- Erection Planning of Anch
- Stage Analysis for Each Erection Method
- Design of Temporary Structure
- Section Development and Design
(1 / 2)
Tender Design in Oversea
29
- Arch Erection Method
Option 1 : Heavy Lifting Method
6
th
Crossing Bridge (UAE)
Option 2 : High Line Method
Option 3 : Rotation Method Option 4 : Typical Method with FCM
II. Company Experience
(2 / 2)
Tender Design in Oversea
30
II. Company Experience
Iconic Bridge (UAE)
Project Name : Iconic Bridge Preconstruction Design
Location within Country : Palm Jebel Ali, Dubai, UAE
Period : May. 2007 ~ Jul. 2007
Client : Nakheel / Samsung
Bridge Outline
- Name : Iconic Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge : 450m (200+250)
- Main Span Length : 250m
- Girder : PSC Box Girder+Steel Box Girder
Project Name of consulting services by ENVICO :
- Report of Preconstruction Design
Work Scope
- Basic Design
- Planning for basic configuration
- Planning for construction method
- Quantity Estimation
Tender Design in Oversea
Design Project
31
II. Company Experience
Project Name : Road Construction Project Between Aphae and
Amtae
Location : Sinan-gun, Jeollanam-do
Period : Jun. 2009 ~ Aug. 2010
Client : Iksan Regional MOCT / Daelim
Bridge Outline
- Name : New Millennium Bridge
- Type : Multi Span Suspension Bridge
- Span Length :1,750m (225+2@650+225)
Project Name of Consulting Services by ENVICO :
- Basic and Detailed Design of New Millennium Bridge for
Design-Build Tender in Road Construction Project Between
Aphae and Amtae
Work Scope
- Design of the Main Bridge(Basic & Detailed Design)
- Main cable, hanger, Stiffening Girder Detail Design
- Erection Analysis of Suspension Bridge
New Millennium Bridge
32
Project Name : Approach road project of Gogunsan islands
Location : Gunsan-si, Jeollabuk-do, Korea
Period : Dec. 2008 ~ Mar. 2009
Client : Iksan regional construction management Administration
/ Daelim
Bridge Outline
- Name : DanDeung Bridge
- Type : Mono cable Suspension Bridge
- Total Length of Main Bridge: 400m (35+330+35)
Project Name of Consulting Services by ENVICO :
- Tender Design of DanDeung Bridge for Design Build
in the access road for Gogunsan inslands project
Work Scope
- Design of the Suspension Bridge
II. Company Experience
DanDeung Bridge
Design Project
33
Project Name : Construction of Cheongpung bridge
Location : Jecheon-si, Chungcheongbuk-do
Period : Aug. 2004 ~ Dec. 2004
Client : Chungcheongbuk-do / Daelim
Bridge Outline
- Name : CheongPung Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge: 442m (22.2+35.3+327+35.3+22.2)
- Main Span Length : 327m
- Girder : Composite Girder + Concrete Edge Girder
Project Name of Consulting Services by ENVICO :
- Detailed Design of CheongPung Bridge
Work Scope
- Design of the Cable Stayed Bridge
(All Structure excluded Foundation)
II. Company Experience
CheongPung Bridge
Design Project
34
Project Name : IFEZ development Project (Zone4)
Location : Incheon Metropolitan City
Period : Apr. 2007 ~ May. 2007
Client : Incheon / PyungHwa
Bridge Outline
- Name : 1st GongChon Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge: 300.5m(45.5+170+85)
- Main Span Length : 170m
- Girder : Concrete, Steel Composite Girder
Project Name of Consulting Services by ENVICO :
- Detailed Design of 1st GongChon Bridge
Work Scope
- Design of the Cable Stayed Bridge
(All Structure excluded Foundation)
II. Company Experience
1st GongChon Bridge
Design Project
35
Project Name : Singal bypass road Project
Location : Yongin-si, Gyeonggi-do
Period : Dec. 2010 ~ Dec. 2011
Client : Seoul Metropolitan Government / Hyundai
Bridge Outline
- Name : SinGal Overpass Bridge
- Type : Extradosed Bridge
- Total Length of Main Bridge: 330m (90+150+90)
- Main Span Length : 150m
- Girder : PSC Box Girder
Project Name of Consulting Services by ENVICO :
- Detailed Design of SinGal Overpass Bridge
Work Scope
- Detailed Design for all Structures
II. Company Experience
SinGal Overpass Bridge
Design Project
36
Project Name : Yeosu Industrial Site Road Construction Project
Location : Gwangyang-si, Jeollanam-do Korea
Period : Apr. 2009 ~ Apr. 2012
Client : Jeollanam-do / Daelim / Kwansoo E&C
Bridge Outline
- Name : Yi Sun-sin Bridge
- Type : 3-span Suspension Bridge
- Span Length : 2,260m (357.5+1,545+357.5)
Project name of Consulting Services by ENVICO :
- Construction Engineering for the Cable erection
- Construction Engineering for the Girder erection
Work Scope
- Planning of Cable & Girder Erection
- Detail Design of Temp. structure for Cable & Girder Erection
- Detail Erection Planning for Cable & Girder Erection
- Planning for Mobilization/Demobilization of Equipment
II. Company Experience
Construction Engineering Project
Yi Sun-sin Bridge
37
Project Name : Geogeum Bridge Construction (Sorok Bridge)
Location : Gohueng-gun, Jeollanam-do, Korea
Period : Dec. 2005 ~ Dec. 2006
Client : Jeollanam-do / Daelim
Bridge Outline
- Name : Sorok Bridge
- Type : Self anchored Suspension Bridge
- Span Length : 470m (110+250+110) )
Project Name of Consulting Services by ENVICO :
- Construction Engineering and Safety Check of Geo-Gum
Bridge Construction (Sorok Bridge)
Work Scope
- Calculation for Initial Equilibrium Condition
- Safety Check during Construction
- Review for Hanger Installation Method
- Simulation of Hanger Installation Sequence
II. Company Experience
Sorok Bridge
Construction Engineering Project
38
Project Name : 2nd JinDo Bridge Project
Location : Jindo-gun, Jeollanam-do
Period : Nov. 2003 ~ Dec.2004
Client : Iksan Regional Construction Management Administration
/ Hyundai
Bridge Outline
- Name : 2nd JinDo Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge: 484m (70+344+70)
- Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :
- Construction Engineering of the 2nd JinDo Bridge
Work Scope
- Construction Engineering
II. Company Experience
2nd JinDo Bridge
Construction Engineering Project
39
Project Name : Ulsan Bridge
Location : Ulsan Metropolitan City, Korea
Period : Feb. 2011 ~ Dec. 2015
Client : Ulsan Harbor Bridge / Hyundai / Hyundai Steel
Bridge Outline
- Name : Ulsan Bridge
- Type : Single Span Suspension Bridge
- Span Length : 1,150m
Project Name of Consulting Services by ENVICO :
- Construction Engineering(Basic) in Ulsan Bridge Project
- Construction Engineering(Detail) for Cable & Girder
Erection in Ulsan Bridge Project
Work Scope
- Construction Engineering
- Design of Temp. Structure for Cable & Girder Erection
- Erection Planning of Cable & Girder
- Geometry Control of Tower, Cable and Girder
- Detail Erection Planning of Cable Work
II. Company Experience
Ulsan Bridge
Construction Engineering Project
40
Project Name : The access Road for Gogunsan islands project
Location : Gunsan-si, Jeollabuk-do, Korea
Period : Nov. 2011 ~ Apr. 2012
Client : Jeollanam-do / Daelim
Bridge Outline
- Name : DanDeung Bridge
- Type : Single span Suspension Bridge with one tower
- Span Length: 705m(425+280)
Project Name of Consulting Services by ENVICO :
- Independent check for DanDeung Bridge Design and
Construction Engineering Structure for the Cable Erection of
DanDeung Bridge
Work Scope
- Independent Design Check
- Detail Design of Temp. structure for cable & Super-structure
- Detail Erection Planning of Cable work
- Detail Erection Planning of Girder installation
II. Company Experience
DanDeung Bridge
Construction Engineering Project
41
Project Name : Construction of Jeokguem-Youngnam Bridge
Location : Yeosu-si, Jeollabuk-do, Korea
Period : Dec. 2010 ~ Dec. 2011
Client : Iksan Regional Construction / Daelim
Bridge Outline
- Name : Jeokguem Bridge
- Type : Single span Suspension Bridge
- Span Length: 1,340m(310+850+180)
Project Name of consulting services by ENVICO :
- Construction Engineering for the Cable Erection of
Jeokgeum Bridge
Work Scope
- Construction Engineering
- Detail Design of Temp. structure for Cable
- Detail Erection Planning of Cable Work
II. Company Experience
Jeokguem Bridge
Construction Engineering Project
42
Project Name : National detour road construction
Gwangyang city
Location : Gwangyang-si, Jeollanam-do
Period : Dec. 2010 ~ Aug. 2013
Client : Iksan Regional Construction Management Administration
/ Daelim
Bridge Outline
- Name : Sepung Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge : 725m(57.5+85+2@220+85+57.5)
- Main Span Length : 220m
- Girder : PC Box Girder
Project Name of consulting services by ENVICO :
- Construction Engineering for Sepung Bridge
Work Scope
- Independent Check
- Construction Engineering, Geometry Control
- Design of Temp. Structure
II. Company Experience
Sepung Bridge
Construction Engineering Project
43
Client : Ministry of Land, Transportation and Maritime Affairs
Research Period : May. 2009 ~ Dec. 2015
Work Scope
- Study of Prototype model in Multi-span Suspension Bridge
- Study of Prototype model in Cable-Stayed-Suspension
Bridge
- Parametric Study on Safety Factor for Cable Slip in Multi-Span
Suspension Bridges
- Optimum Pylon stiffness in Multi-Span Suspension Bridges
- Cost Optimization using High-performance Material
in Multi-Span Suspension Bridges
- Optimum Span Ratio of Cable Stayed-Suspension Bridge
Ls Lc Lc Ls
B
I

Kx
Kz

1 2 1
N
R(x)
R(z)
R(x)
R(z)
R(x)
R(z)
F F F
II. Company Experience
Research Project
Super long-span Bridge R&D Project 1-1-2-3
Future Cable Supported Bridge
44
Client : Samsung
Research Period : Apr. 2011 ~ Mar. 2013
Work Scope
- Cable Erection Procedure and Method
- Arrangement of Design Items for Temporary Structures
according to Cable Erection Methods
- Guideline of Geometry Control Technique during Cable Erection
- Erection manual for Cable work considering detailed cable
erection sequence
- Development for Cable Geometry Control Software
II. Company Experience
Internalization of Cable Erection Technology
for Long Span Suspension Bridge
Research Project
45
Client : POSCO
Research Period : Nov. 2011 ~ Dec. 2012
Work Scope
- Study for Planning & Design of Suspension Bridge
- Recent Trend for Planning & Design of Suspension Bridge
- Guideline of Necessity Items for Engineering of
Suspension Bridge
- Specifications for Suspension Bridge Construction
- Study of Applied Examples for Special Equipments
- Study of Management Method for Special Equipments
II. Company Experience
Engineering Technology
Development for Suspension Bridge
Research Project
Ex per i enc e w i t h GS
47
Project Name : Mokpo Bridge Project
Location within Country : Mokpo-si,Sinan-gun,Jeollanamdo
Period : Aug. 2009 ~ Dec. 2010
Client : Jeollanam-do / GS
Bridge Outline
- Name : Mokpo Bridge
- Type : Cable Stayed Bridge
- Total Length of Main Bridge: 900m (200+500+200) )
- Main Span Length : 500m
- Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :
- Construction Engineering for Mokpo Bridge
Work Scope
- Independent Check
- Geometry Control & Design of Temp. Structure
. Experience with GS
Mokpo Bridge
Experience with GS
48
Project Name : Sluice Extension at Nakdong River Project
Location within Country : Busan Metropolitan City
Period : Sep. 2009 ~ Nov. 2009
Client : Korea water Resources Corporation / GS
Bridge Outline
- Name : Narae Bridge
- Type : Arch Bridge
- Total Length of Main Bridge: 360m (80+2@100+80) )
- Main Span Length : 100m
- Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :
- Design of Narae Bridge
Work Scope
- Basic Design
. Experience with GS
Narae Bridge
Experience with GS
49
Mumbai Trans Harbour Link Project (Incomplete project)
Location : Mumbai, Maharashtra State, India
Service Done in : 2012
Structural Type : Concrete Box Girder and Stayed Cable Bridge
Function / usage : Road bridge
Total Length : 22km
Work Scope : Quantity Studying for bidding
Construction Engineering
Experience with GS
Tender Design
Sewri
Chirle
Main Land
Island City
MTHL
. Experience with GS
Vam Cong Bridge Construction Project
Location : Cao Lanh City and Can Tho City, Vam Cong, Vietnam
Service Done in : 2013
Structural Type : Stayed Cable Bridge
Function / usage : Road bridge
Total Length : 2.97km
Main Span : 210 + 450 + 210 = 870m
Work Scope : Quantity Studying for bidding
50
Cable Twisting Study by Cable 3D Widening for 3D
Suspension Bridge(2nd Namhae Bridge)
Work Scope
- Cable Twisting Study by Cable 3D Widening
- Development of FEA method(Multi-Strand Model Analysis)
to reflect the geometric stiffness representing the torsional
behavior of suspension bridge cables.
- Analysis for application of FEA method "Multi-Strand Model
- Verification of FEA method "Multi-Strand Model"
using measurement record of installation cable force and
angle for pre-build 3-D Cable bridge, Yong-jong Bridge"
- For Namhae 2nd Bridge, suggestion of the angle of
the initial installation cable band
Experience with GS
Research Project
. Experience with GS
Development for Main Cable Geometry Control
Work Scope
- Manual for Erection of Suspension Bridge
- Development for 3D Elastic Catenary Element
- Main Cable Program for Geometry Control
- Erection Rope Program for Geometry Control
Concl usi on
52
Conclusion
. Conclusion
Ability for Design &
Construction Engineering
Basic & Detail Design
Construction Engineering
Experience
for Tender
Design in
Oversea
Local
Code
With ENVICOs experience, following can be achieved;
- Quality Improvement & Cost Optimization (including tender and detail design cost)
- Idea for Erection Method in Tender Stage
- Minimization of Erection Cost in Bidding Price
Experience
for Any Type
of Bridges
Arch
Cable Stayed
Suspension
Appendi x
54
Project of Kwansoo
Jeok Guem Bridge
Lusail Marine Bridge (Qatar) Dan Deung Bridge
Appendix
Company Profile of Kwansoo
Yi Sun-sin Bridge
Completion
2
nd
Nam Hae Bridge
2
nd
Gansun 4 Bridge

You might also like