DAILY REPORT of ACTIVITIES for the MONTH of AUGUST
Name of Trainee: CUNANAN, Jay-Em C. Company: RCBC Realty Corporation
1-Aug-14 I was absent because I was confined into Manila Doctors Hospital due to Appendagitis. 2-Aug-14 Saturday 3-Aug-14 Sunday 4-Aug-14 I was absent because I was confined into Manila Doctors Hospital due to Appendagitis. 5-Aug-14 I was absent because I was confined into Manila Doctors Hospital due to Appendagitis. 6-Aug-14 At 9 am, the repaired substation transformer was set to be used. Partial load connection was done by the engineers. I was just watching since I am not allowed to do anything. The full load connection was done in the afternoon at 1 pm. 7-Aug-14 Encoding of Preventive Maintenance Reports and Printing of Preventive Maintenance Schedule for the month of August. 8-Aug-14 I assisted the technicians in the daily preventive maintenance activity. After the preventive maintenance I encoded the remaining Preventive Maintenance Reports. 9-Aug-14 Saturday 10-Aug-14 Sunday 11-Aug-14 Encoding of preventive maintenance records. 12-Aug-14 Encoding of preventive maintenance records. I also helped in some of the paper works of my supervisor such as in permits, reports, and others that were needed to be accomplished. 13-Aug-14 I was able to go into the chillers with the other technicians to record various parameters subjected for the preventive maintenance. 14-Aug-14 I assisted sir Lucio in fixing a reported urinal sensor failure. 15-Aug-14 MELT exam in School 16-Aug-14 Saturday 17-Aug-14 Sunday 18-Aug-14 I made tags for the FCU chilled water pipes supply and return. This was a project given to me and Miguel Azucena, my co-trainee. The tagging of those FCU supply and return chilled water pipes. 19-Aug-14 I attended a training for installation of General Electric LED T8. This was facilitated by CYA Industries Inc. 20-Aug-14 I continued making the tags for the FCU project. 21-Aug-14 Holiday (Ninoy-Aquino Day) 22-Aug-14 I together with my co-trainees continued doing the tags for the FCU project in the morning and in the afternoon I assisted in the daily preventive maintenance. 23-Aug-14 Saturday 24-Aug-14 Sunday 25-Aug-14 Holiday (National Heores Day) 26-Aug-14 I did the FCU tags in the morning and encoded preventive maintenance records in the afternoon. 27-Aug-14 I joined Seth Revelo and sir Ronnie, from the ENECON team in reading electric meters form some of the tenants of RCBC Plaza. I was able to experience going up a floor using a stair in the AHU room. It was on tower 2 46th floor. It has a very small space and it was very dark since the light switch was placed next to the door at the next floor. 28-Aug-14 I printed the reamianing preventive maintenance schedule for the month of september but I was not able to finish it all since I was also encoding the preventive maintenance records. 29-Aug-14 I continued in encoding the preventive maintenance records but I left after lunch because I was needed for our thesis. 30-Aug-14 Saturday 31-Aug-14 Sunday