You are on page 1of 2

STUDENT'S ON-THE-JOB TRAINING

DAILY REPORT of ACTIVITIES for the MONTH of AUGUST



Name of Trainee: CUNANAN, Jay-Em C. Company: RCBC Realty Corporation

1-Aug-14
I was absent because I was confined into Manila Doctors Hospital due to
Appendagitis.
2-Aug-14
Saturday
3-Aug-14
Sunday
4-Aug-14
I was absent because I was confined into Manila Doctors Hospital due to
Appendagitis.
5-Aug-14
I was absent because I was confined into Manila Doctors Hospital due to
Appendagitis.
6-Aug-14
At 9 am, the repaired substation transformer was set to be used. Partial load
connection was done by the engineers. I was just watching since I am not allowed
to do anything. The full load connection was done in the afternoon at 1 pm.
7-Aug-14
Encoding of Preventive Maintenance Reports and Printing of Preventive
Maintenance Schedule for the month of August.
8-Aug-14
I assisted the technicians in the daily preventive maintenance activity. After the
preventive maintenance I encoded the remaining Preventive Maintenance
Reports.
9-Aug-14
Saturday
10-Aug-14
Sunday
11-Aug-14
Encoding of preventive maintenance records.
12-Aug-14 Encoding of preventive maintenance records. I also helped in some of the paper
works of my supervisor such as in permits, reports, and others that were needed
to be accomplished.
13-Aug-14
I was able to go into the chillers with the other technicians to record various
parameters subjected for the preventive maintenance.
14-Aug-14
I assisted sir Lucio in fixing a reported urinal sensor failure.
15-Aug-14
MELT exam in School
16-Aug-14
Saturday
17-Aug-14
Sunday
18-Aug-14
I made tags for the FCU chilled water pipes supply and return. This was a project
given to me and Miguel Azucena, my co-trainee. The tagging of those FCU supply
and return chilled water pipes.
19-Aug-14
I attended a training for installation of General Electric LED T8. This was
facilitated by CYA Industries Inc.
20-Aug-14
I continued making the tags for the FCU project.
21-Aug-14
Holiday (Ninoy-Aquino Day)
22-Aug-14
I together with my co-trainees continued doing the tags for the FCU project in
the morning and in the afternoon I assisted in the daily preventive maintenance.
23-Aug-14
Saturday
24-Aug-14
Sunday
25-Aug-14
Holiday (National Heores Day)
26-Aug-14
I did the FCU tags in the morning and encoded preventive maintenance records
in the afternoon.
27-Aug-14
I joined Seth Revelo and sir Ronnie, from the ENECON team in reading electric
meters form some of the tenants of RCBC Plaza. I was able to experience going
up a floor using a stair in the AHU room. It was on tower 2 46th floor. It has a
very small space and it was very dark since the light switch was placed next to
the door at the next floor.
28-Aug-14
I printed the reamianing preventive maintenance schedule for the month of
september but I was not able to finish it all since I was also encoding the
preventive maintenance records.
29-Aug-14
I continued in encoding the preventive maintenance records but I left after lunch
because I was needed for our thesis.
30-Aug-14
Saturday
31-Aug-14
Sunday



JAY-EM C. CUNANAN
Trainee

You might also like