You are on page 1of 1

GREAT NORTH ROAD

Existing street trees


to be protected
with solid hoarding.

Site hoarding to Great North Rd


boundary to be 2.4m high plywood
painted white.

Existing street trees to


be protected with
solid hoarding.

" IN "
Existing Crossing as site ingress (Provide
protection from damage to existing crossing)

Site hoarding to Great North Rd


boundary to be 2.4m high plywood
painted white.

COMBINED 225 SCANNED

Conc Footpath

Conc Footpath

WATER 150 SCANNED

Conc Footpath

341.4
Sail Canopy Column to S.E Design.
H

73.41m, 67 18' 45"

64

garden

Existing street trees to be


protected with solid hoarding.

" OUT "


Existing Crossing as site egress
(Provide protection from damage
to existing crossing)

150 SCAN
NED

64

Existing
crossing

24.43m, 67 19' 45"

Existing
crossing

21.52m, 67 23' 1"

Conc Footpath

Existing
crossing

Conc Footpath

Existing
crossing

Existing
crossing

63
H

COMBINED

garden

LEGAL DESCRIPTIONS:

NOTES:

LOT 1
DP 64875
LOT 1
DP 100596
LOT 1
DP 54261

Demolition General:
To the area within the legal site
boundaries only, demolish and/ or
remove all building, above ground
improvements and remove all
concrete floor slabs unless otherwise
noted in this drawing and / or in the
attached specification.

TOTAL SITE AREA


7,207m2 approx

64

LEGEND:

All below ground structures are to be


removed.

Site Boundary

existing
conc piles

30.19m, 157 24' 2"

31.38m, 157 22' 0"

ed
to
b

ark
rp
ca
ting
E xi s

E xi
s
to ting
be
si
de ngle
mo lev
lish el b
ed
u
inc ildin
l ra g
mp

existing
conc piles

Existing
crossing

59

Existing
crossing

NO demolition access from Dean St

Transformer

60

EM
ENT

UN
DER

Existing Power Pole.

01

1:200 @ A1
1:400 @ A3

67.88m, 66 36' 0"

Existing
crossing

Reused metal cladding to be utilized for site hoarding to Dean and


King Streets. Site hoarding to be located on street boundaries.

COMBINED150

13-Oct-14
01-Oct-14
date:

amendments:

hume

hume architects limited

gen@humearch.co.nz
ph 64 9 357 0462
fax 64 9 357 0418
level 2 10-12 federal st
po box 106 605
downtown, auckland, nz
www.humearch.co.nz

PROJECT

WATER 50 SCANNED

NOTES:
1. Refer to existing drawings of existing buildings. (attached for information only from Council files)

Bunnings Warehouse Grey Lynn

WATER 150 SCANNED

6. All earthworks and exposed surfaces are to be protected from excessive traffic or working
loads to maintain sub surface integrity.

boundary

300

Wall demolished
to 300 above EFL

5. Refer Special Conditions of Contract for additional contract requirements.

m
Te

op
Pr

ADDRESS

272 - 276, 300 & 302 Great


North Road
Grey Lynn, Auckland
SCALE

DRAWN

@ A1
50% @ A3

DATE

REFERENCE

Wednesday, 21 January 2015

1020

DRAWING TITLE

Demolition Plan
Slab demolished

A
Not to Scale

~ Contractor to barricade site to


prevent public access.

SCANNED

4. All demolition material removal and site access / egress is to be via Great North Road.

Not to Scale

~ Pollution Prevention Plan: covering


control of noise and dust.

General Notes
It is the responsibility of the contractor to verify on site, all dimensions, boundary
setouts / service connection locations & levels shown prior to construction.
The contractor is to ensure that all work complies with NZS:3604 & NZBC:2004,
along with all amendments thereof, and all other relevant NZ standards & codes for
each sub trade.
All proprietary items and materials shall be stored, handled & installed in strict
accordance with the manufacturer's specifications.
All fixings, materials & workmanship to comply with the requirements of NZBC:B2
' Durability '.
Any doubt, ambiguity or omission of any part of the drawings or specifications, shall
be referred to the architect for clarification prior to the commencement of work.
Do not scale off drawings. Use figured dimensions only.

2
For Tender
1
For Info
rev:

Existing
crossing
58

WATER 100 SCANNED

3. Cell phone tower and associated equipment will be removed by others prior to demolition.

Sat Image

~ Safety Plan / Report detailing safe


handling of disposal of hazardous
materials.

SEALED CARPARK

SEALED CARPARK

2. Existing tenant (Buy Right Cars) to remove 4 x floodlights attached to building and bollards to
Great North Road frontage prior to demolition.

Location Plan

Management Plan:
Contractor to provide the following:
~ Traffic management plan.
~ Demolition methodology and
management plan

Existing walls to remain


to ensure footpath /
road stability. Walls and
slab remain temporary
prop walls. Refer A-A
below.

DEAN STREET
Demolition Plan

Asbestos:
Parts of the building may contain
asbestos. Removal to be carried out
by approved contractors only and as
outlined in the attached Specification.

Existing Fire Hydrant.

59

13.60m, 66 48' 29"

13.16m, 66 54' 57"

Existing walls to remain to ensure


footpath / road stability. Keep walls
and basement slab to 4.0m temporary
prop walls to basement slab.

61

existing
conc piles
BAS

SHED

existing
conc piles

existing
conc piles

Lower Floor 42.93 m2

62

existing
conc piles

1,128.18 m2
existing
conc piles

existing
conc piles

373.62 m

wa

e
ob
t
e
ous
reh

.
hed
s
i
l
o
dem

Existing concrete Piles to be


demolished to RL 58.30

Existing Power Box.

WATER 150 SCANNED

existing
conc piles

tw
ing
t
s
i
Ex

vel
o le

59

Note: Retain stability & integrity


of adjacent neighbour fire wall

existing
conc piles

Lower
Floor 582.96 m
STAGE
3 DEMOLITION
(existing building frontage to dean st to be
removed towards end of demolition process
to avoid nuisance to residential neighbours)

existing
conc piles

Upper Floor 2,426.24 m2

Lean-to structure
to be demolished

existing
conc piles

Sanitary sewer and Stormwater


drainage, cesspits and manholes
shown outside the boundary are to be
retained and protected.

KING STREET

existing
conc piles

Reused metal cladding to be utilized for site


hoarding to Dean and King Streets. Site
hoarding to be located on street boundaries.

existing
conc piles

62.66m, 158 4' 50"

existing
conc piles

Protect:
Seal and cap all site services (water
supply, sewer and stormwater,
disconnect electrical , gas and
telecoms prior to commencing
demolition (refer specification).

Existing Water Meter

WATER 40 SCANNED

13.96m, 155 3' 14"

Note: Retain stability & integrity


of adjacent neighbour fire wall

Existing transformer and base to remain

WATER 150 SCANNED

23.30m, 66 52' 15"

Existing Site Services, telecoms etc:


Contractor to locate and protect all
existing services prior to work
commencing. Refer to surveyors
existing site plans and confirm
locations with 0800 B4U DIG prior to
commencement.

Existing Manhole

garden

Transformer

em
olis
he
d

Exis

412.92 m2

deck

steps

existing
conc piles

NOTE: Existing metal roofing from this


building to be removed and utilised for
cladding for site hoarding (approx 2.7
high) to Dean St and King St frontages.

Existing Phone Cable.

62

ting
t
to wo le
be
v
de el sho
mo
lish wroo
m
ed

Cell phone tower

4.17m, 67 45' 0"

Public Services:
Liase with the territorial authority and
relevant service providers with regards
to protection of existing electrical
transformers and public stormwater,
sanitary sewers and water mains.

Existing Storm Water.

63

14.12m, 66 27' 9"

Remove all sundry site features e.g.


kerbs, low walls, canopies, steps/
ramps/decks, handrails/balustrades,
bollards, lighting poles, signs, fences,
gates etc

Existing Chamber

deck 63

Transformer

Existing Power Cable.

note: combined sanitary sewer /


stormwater. Refer to Survey Plans

be

Lot 1
DP 64875

Generally remove all tress and


vegetation including soil, rocks etc.

Existing Sanitary Sewer.

ramp

Lot 1
DP 100596

Existing Water Main.

Existing Cesspit

Upper 58.23 m2
Existing two level
showroom to be
demolished

o
lt
ve
le ed
e
gl lish
sin mo
g
i n de
ist

Lot 1
DP 54261

Remove seal and loose metal,


concrete, paving etc from all carparks
and service area.
Remove all existing fences.

63

1,123.55 m2

Ex

32.09m, 156 20' 0"

garden

Existing cell phone tower


and associated
equipment to be
removed by others.

174.54 m2

WATER 1070 SCANNED

64
63

STAGE 2 DEMOLITION
(once hoarding established)

Outline of existing buildings to


be demolished including slabs
and below slab structures.

garden

STAGE 1 DEMOLITION
(to limit nuisance to residential neighbours
and recover metal roofing for hoarding)

33.68m, 154 50' 0"

49.97m, 157 16' 19"

Note: Retain stability & integrity of adjacent neighbour fire wall

Upper 240.87 m2

DRAWING No. [ REVISION No.]

Section A-A
Not to Scale

A 1-01 [2]
For Info
THE COPYRIGHT OF THIS DRAWING REMAINS THE PROPERTY OF HUME ARCHITECTS AND MAY NOT
BE COPIED IN ANY FORM OR PASSED ON TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT.
File Path: teamwork://Hume-Server.local/1020 BC05 Grey Lynn [16] - 21/01/15