You are on page 1of 5

2015-04-15

Calculation Sheet
of
Pier

COLUMN CALCULATION SHEET

CONTENTS

One-Stop Solution for Column

1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA

2. TENSION DESIGN
2.1 FORMULA
2.2 TENSION DESIGN

3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR

TITLE

DESCRIPTION

PROJECT/JOB NO.

13-PK-104

PROJECT/JOB NAME

KARBALA REFINERY PROJECT

CLIENT NAME
SITE NAME
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

13-PK-104

GROUP NAME
LOADCOMBINATION GROUP NAME
REV

DATE

DESCRIPTION

Copyright (c) GS E&C. All Rights Reserved

PREP'D

CHK'D

APPR'D

APPR'D

Copyright (c) GS E&C. All Rights Reserved

Project Na. : KARBALA REFINERY PRO..


Project No. : 13-PK-104
Client :

Page 1

2015-04-15

2015-04-15
Project Na. : KARBALA REFINERY PRO..

Calculation Sheet
of
Pier

Client :

Page 2

1. INPUT DATA
1.1 General
Design Code

American Concrete Institute (ACI 318-08 : SI)

Input Unit

SI

Bending

Output Unit
Axial

Sprial reinf.

0.9

f'c

0.85

fy (10M ~ 13M)
2

25 N/mm

Tied reinf.

Es
2

420 N/mm

Shear

0.65

Ec

420 N/mm

SI

0.75

fy (16M ~)

23.5 kN/mm

200 kN/mm

0.75

Steel Db

Cover

ASTM A615 (M)

50 mm

1.2 Pier Data


3100

50

Pier Name

42

Ver Bar

22M, 56 EA

Pier Shape

Octagonal

Tie Bar

12M @ 200 mm

Width

3100 mm

f'c

25 N/mm

Length

3100 mm

fy

420 N/mm

Height

2100 mm

Using As

21676.24 mm

dx

Calculation Sheet
of
Pier

Project No. : 13-PK-104

dy

3026.9 mm

211

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.6 Wlx

212

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.6 Wlx

213

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.6 Wly

214

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.6 Wly

215

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.0 SLx2

216

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.0 SLx2

217

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.0 SLy2

218

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.0 SLy2

219

1.2 SW + 1.6 LL + 1.6 Test

220

1.2 SW + 1.0 LL + 1.0 Test + .8 Wlx

221

1.2 SW + 1.0 LL + 1.0 Test + -.8 Wlx

222

1.2 SW + 1.0 LL + 1.0 Test + .8 Wly

223

1.2 SW + 1.0 LL + 1.0 Test + -.8 Wly

224

1.2 SW + 1.6 LL + 1.2 Empty

225

1.2 SW + 1.0 LL + 1.2 Empty + .53 Wlx

226

1.2 SW + 1.0 LL + 1.2 Empty + -.53 Wlx

227

1.2 SW + 1.0 LL + 1.2 Empty + .53 Wly

228

1.2 SW + 1.0 LL + 1.2 Empty + -.53 Wly

3026.9 mm

Group 2 - 4

1.3 Loading Data

Comb . ID Load Combination for Reinforcement

1.3.1 Load Case


Pier Name

Unit( kN , kN-m )

Name

42

Fx

Fy

Fz

Mx

My

201

1.0 SW + .9 Empty + 1.6 Wlx

202

.9 SW + .9 Empty + -1.6 Wlx

203

.9 SW + .9 Empty + 1.6 Wly

204

.9 SW + .9 Empty + -1.6 Wly

205

.9 SW + .9 Empty + 1.0 SLx2

SW

-401.244

Empty

-550

Operation

-550

Test

-550

Wlx

200

3100

206

.9 SW + .9 Empty + -1.0 SLx2

Wly

200

-3100

207

.9 SW + .9 Empty + 1.0 SLy2

SLx2

40

750

208

.9 SW + .9 Empty + -1.0 SLy2

SLy2

40

-750

209

1.4 SW + 1.4 TL + 1.4 Operation

LL

-250

TL

210

1.2 SW + 1.6 LL + 1.2 TL + 1.2 Operation

211

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.6 Wlx

212

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.6 Wlx

213

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.6 Wly

214

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.6 Wly

1.3.2 Load Combination List


Group 1 - 3

Comb . ID Load Combination for Reinforcement


201

1.0 SW + .9 Empty + 1.6 Wlx

215

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.0 SLx2

202

.9 SW + .9 Empty + -1.6 Wlx

216

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.0 SLx2

203

.9 SW + .9 Empty + 1.6 Wly

217

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + 1.0 SLy2

204

.9 SW + .9 Empty + -1.6 Wly

218

1.2 SW + 1.0 LL + 1.2 TL + 1.2 Operation + -1.0 SLy2

205

.9 SW + .9 Empty + 1.0 SLx2

219

1.2 SW + 1.6 LL + 1.6 Test

206

.9 SW + .9 Empty + -1.0 SLx2

220

1.2 SW + 1.0 LL + 1.0 Test + .8 Wlx

207

.9 SW + .9 Empty + 1.0 SLy2

221

1.2 SW + 1.0 LL + 1.0 Test + -.8 Wlx

208

.9 SW + .9 Empty + -1.0 SLy2

222

1.2 SW + 1.0 LL + 1.0 Test + .8 Wly

209

1.4 SW + 1.4 TL + 1.4 Operation

223

1.2 SW + 1.0 LL + 1.0 Test + -.8 Wly

210

1.2 SW + 1.6 LL + 1.2 TL + 1.2 Operation

224

1.2 SW + 1.6 LL + 1.2 Empty

Copyright (c) GS E&C. All Rights Reserved

Copyright (c) GS E&C. All Rights Reserved

Project Na. : KARBALA REFINERY PRO..


Project No. : 13-PK-104
Client :

Page 3

2015-04-15

2015-04-15
Project Na. : KARBALA REFINERY PRO..

Calculation Sheet
of
Pier
225

1.2 SW + 1.0 LL + 1.2 Empty + .53 Wlx

226

1.2 SW + 1.0 LL + 1.2 Empty + -.53 Wlx

227

1.2 SW + 1.0 LL + 1.2 Empty + .53 Wly

228

1.2 SW + 1.0 LL + 1.2 Empty + -.53 Wly

Client :

Page 4

Fy

Fz

Mx

Fx

201

320

202
203

Fy

Fz
-896.244

-320

320

204

My

205

40

Mx

My

5632

-856.119

-5632

-856.119

-5632

-320

-856.119

5632

-856.119

834

201

320

-495

4960

206

-40

-856.119

-834

202

-320

-495

-4960

207

40

-856.119

-834

203

320

-495

-4960

208

-40

-856.119

834

204

-320

-495

4960

209

-1331.741

205

40

-495

750

210

-1541.492

206

-40

-495

-750

211

320

-1391.492

5632

207

40

-495

-750

212

-320

-1391.492

-5632

208

-40

-495

750

213

320

-1391.492

-5632

209

-770

214

-320

-1391.492

5632

210

-1060

215

40

-1391.492

834

211

320

-910

4960

216

-40

-1391.492

-834

212

-320

-910

-4960

217

40

-1391.492

-834

213

320

-910

-4960

218

-40

-1391.492

834

214

-320

-910

4960

219

-1761.492

215

40

-910

750

220

160

-1281.492

2816

216

-40

-910

-750

221

-160

-1281.492

-2816

217

40

-910

-750

222

160

-1281.492

-2816

218

-40

-910

750

223

-160

-1281.492

2816

219

-1280

224

-1541.492

220

160

-800

2480

225

106

-1391.492

1865.6

221

-160

-800

-2480

226

-106

-1391.492

-1865.6

222

160

-800

-2480

227

106

-1391.492

-1865.6

223

-160

-800

2480

224

-1060

225

106

-910

1643

226

-106

-910

-1643

227

106

-910

-1643

228

-106

-910

1643

Group 2 - 4
There is no load combination

Copyright (c) GS E&C. All Rights Reserved

42

Group 2 - 4
There is no load combination

2. TENSION DESIGN
2.1 FORMULA
D1

-For rectangular shape


A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
3
3
(D1 + t) * (D2 + t)
(D1 - t) * (D2 - t)
Ix =
12
12
3
3
(D2 + t) * (D1 + t)
(D2 - t) * (D1 - t)
Iy =
12
12
- Fz
Mux (D2 / 2)
+
Tux = (
) As
A
Ix
- Fz
Muy (D1 / 2)
+
Tuy = (
) As
A
Iy
Copyright (c) GS E&C. All Rights Reserved

t
D2

42

Page 5

Unit( kN , kN-m )

LC#

Unit( kN , kN-m )

Fx

Client :

Group 1 - 3

P. Name

Group 1 - 3

LC#

Project No. : 13-PK-104

1.3.4 In Pier Bottom

1.3.3 In Pier Top


P. Name

Project Na. : KARBALA REFINERY PRO..

Calculation Sheet
of
Pier

Project No. : 13-PK-104

2015-04-15

2015-04-15

Calculation Sheet
of
Pier

Project Na. : KARBALA REFINERY PRO..

Client :

Page 6

Project Na. : KARBALA REFINERY PRO..


Project No. : 13-PK-104
Client :

Page 7

3. ONE-WAY SHEAR

Tu = Max(Tux, Tuy)
Tu
, = 0.9
Req.As =
fy

3.1 FORMULA

-For circular or octagonal shape


Fz
4 Mu
Tu = As fs =
Nb
Nb Dia
If Tu is negative that means Tu is in compression. That Case is N/A!!
Tu
Req.As =
, = 0.9
fy
Nb = number of bars
Dia = Diameter of Rebar arrangement
Fz = vertical load + Pier self weight

- Vc = 0.17 fck Bw d
Av fy d
s
- Vu <= Vc + Vs , = 0.75
- When, Value of Vs shall not exceed 0.67

Dia

- Vs =

P. Name

Dir.

Unit(mm , kN,mm )

LC#

Dia (D1/D2)

Tu

UsingAs/EA

Req.As/EA

Result

201

2953.8

120.19

387.08

317.96

OK

202

2953.8

120.9

387.08

319.85

OK

203

2953.8

120.9

387.08

319.85

OK

204

2953.8

120.9

387.08

319.85

OK

205

2953.8

4.88

387.08

12.91

OK

206

2953.8

4.88

387.08

12.91

OK

207

2953.8

4.88

387.08

12.91

OK

208

2953.8

4.88

387.08

12.91

OK

209

2953.8

-23.78

387.08

N/A

OK

210

2953.8

-27.53

387.08

N/A

OK

211

2953.8

111.34

387.08

294.56

OK

212

2953.8

111.34

387.08

294.56

OK

213

2953.8

111.34

387.08

294.56

OK

214

2953.8

111.34

387.08

294.56

OK

215

2953.8

-4.68

387.08

N/A

OK

216

2953.8

-4.68

387.08

N/A

OK

217

2953.8

-4.68

387.08

N/A

OK

218

2953.8

-4.68

387.08

N/A

OK

42

219

2953.8

-31.46

387.08

N/A

OK

220

2953.8

45.21

387.08

119.61

OK

221

2953.8

45.21

387.08

119.61

OK

222

2953.8

45.21

387.08

119.61

OK

223

2953.8

45.21

387.08

119.61

OK

224

2953.8

-27.53

387.08

N/A

OK

225

2953.8

20.27

387.08

53.61

OK

226

2953.8

20.27

387.08

53.61

OK

227

2953.8

20.27

387.08

53.61

OK

228

2953.8

20.27

387.08

53.61

OK

Copyright (c) GS E&C. All Rights Reserved

fck Bw d (Vs max)

3.2 ONE-WAY SHEAR

2.2 TENSION DESIGN


P. Name

Calculation Sheet
of
Pier

Project No. : 13-PK-104

Unit(kN)

LC#

Vc

Vs

Vs max

Vu

Result

201

5012.012

539.177

19458.4

320

OK

202

5012.012

539.177

19458.4

320

OK

203

5012.012

539.177

19458.4

OK

204

5012.012

539.177

19458.4

OK

205

5012.012

539.177

19458.4

40

OK

206

5012.012

539.177

19458.4

40

OK

207

5012.012

539.177

19458.4

OK

208

5012.012

539.177

19458.4

OK

209

5012.012

539.177

19458.4

OK

210

5012.012

539.177

19458.4

OK

211

5012.012

539.177

19458.4

320

OK

212

5012.012

539.177

19458.4

320

OK

213

5012.012

539.177

19458.4

OK

214

5012.012

539.177

19458.4

OK

215

5012.012

539.177

19458.4

40

OK

216

5012.012

539.177

19458.4

40

OK

217

5012.012

539.177

19458.4

OK

218

5012.012

539.177

19458.4

OK

219

5012.012

539.177

19458.4

OK

220

5012.012

539.177

19458.4

160

OK

221

5012.012

539.177

19458.4

160

OK

222

5012.012

539.177

19458.4

OK

223

5012.012

539.177

19458.4

OK

224

5012.012

539.177

19458.4

OK

225

5012.012

539.177

19458.4

106

OK

226

5012.012

539.177

19458.4

106

OK

227

5012.012

539.177

19458.4

OK

228

5012.012

539.177

19458.4

OK

201

5012.012

539.177

19458.4

OK

202

5012.012

539.177

19458.4

OK

203

5012.012

539.177

19458.4

320

OK

204

5012.012

539.177

19458.4

320

OK

205

5012.012

539.177

19458.4

OK

206

5012.012

539.177

19458.4

OK

42

Copyright (c) GS E&C. All Rights Reserved

2015-04-15

Calculation Sheet
of
Pier

Project Na. : KARBALA REFINERY PRO..


Project No. : 13-PK-104
Client :

Page 8

207

5012.012

539.177

19458.4

40

OK

208

5012.012

539.177

19458.4

40

OK

209

5012.012

539.177

19458.4

OK

210

5012.012

539.177

19458.4

OK

211

5012.012

539.177

19458.4

OK

212

5012.012

539.177

19458.4

OK

213

5012.012

539.177

19458.4

320

OK

214

5012.012

539.177

19458.4

320

OK

215

5012.012

539.177

19458.4

OK

216

5012.012

539.177

19458.4

OK

217

5012.012

539.177

19458.4

40

OK

218

5012.012

539.177

19458.4

40

OK

219

5012.012

539.177

19458.4

OK

220

5012.012

539.177

19458.4

OK

221

5012.012

539.177

19458.4

OK

222

5012.012

539.177

19458.4

160

OK

223

5012.012

539.177

19458.4

160

OK

224

5012.012

539.177

19458.4

OK

225

5012.012

539.177

19458.4

OK

226

5012.012

539.177

19458.4

OK

227

5012.012

539.177

19458.4

106

OK

228

5012.012

539.177

19458.4

106

OK

Copyright (c) GS E&C. All Rights Reserved