You are on page 1of 10

Tuesday,

A pril 2 1, 2 015 at 8 :52:29 A M Pacic Daylight Time

Subject: RE: CASTELAR EEC MEASURE Q BOND SURVEY


Date: Tuesday, June 3, 2014 at 10:43:21 AM Pacic Daylight Time
From:
To:
CC:

Elbeleidy, Raouf
Oregel, Ana
Picinic, MaNhew, Mortel, Margarita, Jackson, Joseph, Tagawa, Dean, Servin, Manuel

Priority: High
Thanks Ana!

RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Oregel, Ana
Sent: Monday, June 02, 2014 11:39 AM
To: Elbeleidy, Raouf
Cc: Picinic, Matthew; Mortel, Margarita; Jackson, Joseph; Tagawa, Dean; Servin, Manuel
Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High


Hi Raouf,

Perfect, I will follow up with Frank regarding the apparatus.

As far as the removal of the current structure and the replacement of the ma>ng, lets proceed with that.

Once again, Thank you for all your support

Ana
Ana Oregel
Oregel

Principal

Castelar Early Educa^on Center


840 Yale St. Los Angeles CA 90012
(
( (213) 624-6740
7
7 (213) 617-1439

GraNs Early Educa^on Center


1415 W. 5th Street, Los Angeles CA 90017
(
( (213) 481-3230
7
7 (213) 481-3238

I alone cannot change the world, but I can cast a stone across the waters to create many ripples.

From: <Elbeleidy>, Raouf <raouf.elbeleidy@lausd.net>


Date: Monday, June 2, 2014 at 11:32 AM
To: Ana Oregel <abo9100@lausd.net>
Cc: "Picinic, MaNhew" <maNhew.picinic@lausd.net>, "Mortel, Margarita" <margarita.mortel@lausd.net>,
"Jackson, Joseph" <JOSEPH.JACKSON@lausd.net>, "Tagawa, Dean" <dtagawa@lausd.net>, "Servin, Manuel"
<manuel.servin@lausd.net>
Subject: RE: CASTELAR EEC MEASURE Q BOND SURVEY

Hi Ana:

Page 1 of 9

Since the new apparatus is part of measure Q and we s^ll need to go to the Board to get approval we s^ll
have plenty of ^me to select exactly what you want for Castelar. It may be that the space available does not
allow for addi^onal slides as you need to have 6 feet of clearance at the end of the slide.

My recommenda^on would be to have a follow up mee^ng with Frank and MaNhew to make sure you
maximize use of the available area. We s^ll have plenty of ^me to do that.

In the mean^me we can proceed with removal of the other small structures on the exis^ng majng and
replacing it with new majng.

If that is acceptable let us arrange to have a follow up visit by Frank. You can either contact Frank directly to
arrange for the mee^ng or it can be arranged through me or MaNhew. Ul^mately we want to make sure the
children at Castelar get the maximum benet from the new apparatus.

Please let me know your thoughts. Thank you.

RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Oregel, Ana
Sent: Friday, May 30, 2014 6:04 PM
To: Elbeleidy, Raouf
Cc: Picinic, Matthew; Mortel, Margarita; Jackson, Joseph; Tagawa, Dean; Servin, Manuel
Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY


Thank you for the pictures. It's a good start, however I would like it to be perhaps a bit more crea^ve. If I
recall correctly during Mr. Frank's visit we decided to incorporate addi^onal structures within the apparatus
to maximize the space. The slides selec^on on the original apparatus will work perfectly (height and size),
however it would be great if we could also include one of those slides where the children can climb (see
pictures below). I researched and saw some great structures (see pictures below) which could possibly work
great for our playground.

Thank you and have a great evening,

Ana Oregel
EEC Principal





Page 2 of 9

On May 30, 2014, at 4:09 PM, "Elbeleidy, Raouf" <raouf.elbeleidy@lausd.net> wrote:


I just got them. Here they are. As far as colors go the colors shown are just for illustra^on. You
will have many choices of color when the ^me comes. Thanks.

RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Oregel, Ana
Sent: Friday, May 30, 2014 3:09 PM
To: Elbeleidy, Raouf; Picinic, Matthew
Cc: Mortel, Margarita; Jackson, Joseph; Tagawa, Dean; Servin, Manuel
Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High


Hi Raouf,

This is GREAT news! Thank you. However, I have not seen the drawings of the proposed structure. Can I also be included in the email, I will like to see the
proposed structure.

Thank you all for your hard work and dedicaGon.

Ana
Ana Oregel
Oregel

Principal

Castelar Early Educa^on Center


840 Yale St. Los Angeles CA 90012
(
( (213) 624-6740
7
7 (213) 617-1439

GraNs Early Educa^on Center


1415 W. 5th Street, Los Angeles CA 90017
(
( (213) 481-3230
7
7 (213) 481-3238

<image001.png>

I alone cannot change the world, but I can cast a stone across the waters to create many ripples.


~Mother Teresa


From: <Elbeleidy>, Raouf <raouf.elbeleidy@lausd.net>


Date: Friday, May 30, 2014 at 2:48 PM
To: Ana Oregel <abo9100@lausd.net>, "Picinic, MaNhew" <maNhew.picinic@lausd.net>
Cc: "Mortel, Margarita" <margarita.mortel@lausd.net>, "Jackson, Joseph"
Page 3 of 9

<JOSEPH.JACKSON@lausd.net>, "Tagawa, Dean" <dtagawa@lausd.net>, "Servin, Manuel"


<manuel.servin@lausd.net>
Subject: RE: CASTELAR EEC MEASURE Q BOND SURVEY

Hi Ana:

I spoke with Frank Catapano today. He sent the drawings of the new proposed play structure
to MaNhew Picinic and you have probably already seen them. He will also send me an
electronic copy on Monday of this same structure as well as the cost. At a minimum, we will
be removing the small obstacle course (photo aNached) that is there now as well as the
associated rubber majng and laying down new majng. If funding is available we will also
install the new apparatus you have selected under the shade structure. Ill know beNer by
early next week how we will proceed. Have a great weekend.

RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Oregel, Ana
Sent: Thursday, May 29, 2014 4:35 PM
To: Elbeleidy, Raouf; Picinic, Matthew
Cc: Mortel, Margarita; Jackson, Joseph; Tagawa, Dean; Servin, Manuel
Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High


Hello,

The name of the equipment vendor is REC WEST Outdoor Products Inc. and the sales associate who took the measurements and my input for the new
apparatus is Frank Catapano, telephone number
818/735-3838 and cell number 310/701-7151.

Best,

Ana
Ana Oregel
Oregel

Principal

Castelar Early Educa^on Center


840 Yale St. Los Angeles CA 90012
(
( (213) 624-6740
7
7 (213) 617-1439

GraNs Early Educa^on Center


1415 W. 5th Street, Los Angeles CA 90017
(
( (213) 481-3230
7
7 (213) 481-3238

<image002.png>

I alone cannot change the world, but I can cast a stone across the waters to create many
ripples.


~Mother Teresa
Page 4 of 9

~Mother Teresa

From: <Elbeleidy>, Raouf <raouf.elbeleidy@lausd.net>


Date: Thursday, May 29, 2014 at 4:14 PM
To: "Picinic, MaNhew" <maNhew.picinic@lausd.net>
Cc: "Mortel, Margarita" <margarita.mortel@lausd.net>, "Jackson, Joseph"
<JOSEPH.JACKSON@lausd.net>, Ana Oregel <abo9100@lausd.net>, "Tagawa, Dean"
<dtagawa@lausd.net>, "Servin, Manuel" <manuel.servin@lausd.net>
Subject: FW: CASTELAR EEC MEASURE Q BOND SURVEY

Hi MaNhew:

This is a follow up to my earlier e-mail today. I just spoke with Ms. Oregel, the principal and
we agreed to the following:

1. At this ^me she would like to have the exis^ng low structures shown in your photo
below removed along with the rubber majng and that area replaced with new
rubber majng only (no apparatus)
2. At a future date when we go to the Board with Measure Q projects we will include
a project for a new apparatus under the exis^ng shade shelter.

The principal also indicated that a play equipment vendor had visited Castelar EEC and
taken measurements for a new apparatus under the exis^ng shade structure. She wasnt
sure who sent him but that was 3 months ago and she hasnt heard anything more about it.
If we can iden^fy that person we should go ahead and get the es^mate from him for later
use since the principal already met with him and selected an apparatus.

Please let me know if you have any ques^ons. Thank you.

RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Elbeleidy, Raouf
Sent: Thursday, May 29, 2014 11:32 AM
To: Picinic, Matthew
Cc: Mortel, Margarita; Jackson, Joseph; Oregel, Ana; Tagawa, Dean; Servin, Manuel
Subject: RE: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High


Hi MaNhew:

In addi^on to replacing the rubber majng they need a new small apparatus. The only
place to put it is exactly where the exis^ng apparatus is now shown in the photo below and
aNached.
If we can nd a new small apparatus that can t in that same area we should go ahead and
select one with the principals input and get an es^mate for new apparatus and majng.

If the area is too small for a new (small) apparatus then we can just replace the rubber
majng. Please let me know what you think. Thanks.
Page 5 of 9

MEASURE Y
(Phase II)

REPLACE DETERIORATED
RUBBER MATTING AT
PLAYGROUND
APPARATUS

CASTELAR EEC

Y-II

NO

New apparatus


RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157

From: Picinic, Matthew
Sent: Thursday, May 29, 2014 10:54 AM
To: Elbeleidy, Raouf
Cc: Mortel, Margarita
Subject: FW: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High


Raouf,
Were we going to do this majng at Castelar EEC at a later date?

<image003.jpg>

Take care,
MaNhew








From: Oregel, Ana
Sent: Tuesday, December 10, 2013 3:16 PM
To: Elbeleidy, Raouf
Cc: Servin, Manuel; Jackson, Joseph; Tagawa, Dean; Diekmann, Maureen; Picinic, Matthew
Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY
Importance: High

Mr. Raouf,

Thank you for your ^me, I truly appreciate your visit and ideas on how to improve our school.
There are a few items on the list that need to be corrected and/or addressed:

1. Adult Restroom: on your notes, you indicated "Convert one small restroom w only a
toilet into a full toilet w/ sink, However, wediscussed opening the space adjacent to an
adult restroom by removing two small walls, this will provide a larger staff lounge. We do
not need to convert any of the restrooms.
2. Wireless Technology: On your notes, you indicate Already in Place, However, we do

Page 6 of 9

NOT have any wireless technology in place.

3. Restroom: Provide low partitions between toilets in children's restrooms. On this item,
there are also some restrooms that need to be replaced for child-sized toilets and some
sinks that also need to be replaced.
4. Interior paint: I no^ced that you crossed out this item, however, we are still in desperate
need of a paint job. Since this item is funded through measure Y, who can I contact to
expedite this item?
Thank you,

Ana Oregel

Principal

Castelar Early Educa^on Center
840 Yale St. Los Angeles CA 90012
Phone: (213) 624-6740
Fax: (213) 617-1439

GraNs Early Educa^on Center
1414 5th St. Los Angeles CA 90017
Phone: (213) 481-3230
Fax: (213) 481-3239

<image002.png>

From: <Elbeleidy>, Raouf <raouf.elbeleidy@lausd.net>


Date: Tuesday, December 10, 2013 at 2:24 PM
To: Ana Oregel <abo9100@lausd.net>
Cc: "Servin, Manuel" <manuel.servin@lausd.net>, "Jackson, Joseph"
<JOSEPH.JACKSON@lausd.net>, "Tagawa, Dean" <dtagawa@lausd.net>, "Diekmann,
Maureen" <maureen.diekmann@lausd.net>, "Picinic, MaNhew"
<maNhew.picinic@lausd.net>
Subject: CASTELAR EEC MEASURE Q BOND SURVEY

Dear Ms. Oregel:



Thank you for mee^ng with the ECED Facili^es Team on December 6, 2013 to discuss the
future Measure Q projects at your center.
Below is a list of all the items we discussed. Where indicated on the list please place a
trouble call followed up by a call to your CPM.

For projects listed as A and I, please ask your CPM to send me an es^mate for the cost of
the required work and ECED will fund it.

The remainder of the new projects will be sent to the Board of Educa^on for approval
some^me in March 2014.

If anything we discussed during our mee^ng was inadvertently leq o the list or if you
remembered something important that we did not discuss,
please do not hesitate to let me know.

Thank you again for taking the ^me to meet with your Facili^es Team.

Page 7 of 9


Principal: Ana Oregel
Director: Dean Tagawa
CPM: Manuel Servin

CASTELAR EEC

FE246Q315A

Playground EquipmentRemove / Replace

CASTELAR EEC

FE295Q415A

Self-Closers @ Gates

CASTELAR EEC

ECRA25315A

Astroturf- Replace
Astroturf Play Area

CASTELAR EEC

ECRA25515A

Drinking FountainReplace Ext.

CASTELAR EEC

ECRA25415A

Electrical Outlets- Add


Exterior

CASTELAR EEC

ECRA25715A

Flooring- Replace All


Carpeting

CASTELAR EEC

ECRA25615A

Roofing- Re-Roof Lunch


Shelter

CASTELAR EEC

ECRA25215A

MEASURE Y

MEASURE Y
(Phase II)

MEASURE Y
(Phase II)

A and I

Shade - New Shade


Shelter
MODERNIZATION: 3
Reseal & Restripe
Playground; 6 Sandbox
W/Cover; 4
Countertops; 2 Interior
Paint; 1 New
Carpet/Flooring; 5
Electrical Outlets; 7 New
Kitchen Flooring
REPLACE
DETERIORATED
RUBBER MATTING AT
PLAYGROUND
APPARATUS
REPLACE OBSOLETE
ENTRY CONTROL
SYSTEM AND PROVIDE
3 HANDSETS
CONTROLS
Storage Bins; Remove 6
old storage bins and
replace with 2 small new
ones
Access: center needs
ADA access for
emergency responders

New 12/6/13

CASTELAR EEC

CASTELAR EEC
CASTELAR EEC
Y-II
CASTELAR EEC
Y-II
CASTELAR EEC
Q
CASTELAR EEC
Q

Page 8 of 9

New 12/6/13
New 12/6/13

New 12/6/13
New 12/6/13
New 12/6/13

Adult restrooms: Provide


at least one additional
adult restroom
Banners- Provide school
name banners
Cabinets- Replace all
base cabinets, sinks and
associated upper cabinets
in classrooms
Cabinets- Replace all built
in children's' cubbies.
Electrical hand dryers

CASTELAR EEC
Q
CASTELAR EEC

CASTELAR EEC
Q
CASTELAR EEC
CASTELAR EEC

Q
Q

CASTELAR EEC
New 12/6/13

Fencing: Provide tarp

Fire Alarm Upgrade

CASTELAR EEC
CASTELAR EEC

New 12/6/13

Front Office Remodel


HVAC: Verify unit (s) age
and replace if required.
Lighting (Security) :
Provide additional outdoor
lighting
Lighting: Replace all
obsolete lighting in
Hallways, Kitchen, and
restrooms

New 12/6/13

Marker boards and tack


boards: add in classrooms

CASTELAR EEC

Nature Explore
Classroom

CASTELAR EEC

New 12/6/13

CASTELAR EEC

New 12/6/13

Paving: Patch / seal,


stripe asphalt paving
Playground apparatus:
Replace existing
apparatus and matting
with new

CASTELAR EEC

New 12/6/13

Restrooms: Provide low


partitions between toilets
in children's restrooms
Signs: Letter signage

CASTELAR EEC

Wireless technology
Telephones: Telephones
do not roll over from front
office to opening/closing
classroom

CASTELAR EEC

New 12/6/13
New 12/6/13
New 12/6/13
New 12/6/13

New 12/6/13

New 12/6/13
New 12/6/13

Trouble call

CASTELAR EEC

Q
Q
Q

CASTELAR EEC
Q
CASTELAR EEC
Q
Q
Q
Q
CASTELAR EEC
Q

CASTELAR EEC
Q


RAOUF ELBELEIDY
SENIOR FACILITIES PROJECT MANAGER
EARLY CHILDHOOD EDUCATION
333 S. BEAUDRY BLVD- 11 TH FLOOR
(213)241-0157
Page 9 of 9

<castelar 72829-1-1 Model (1).pdf>


<castelar 272829-1-1.jpg>

Page 1 0 of 9

You might also like