You are on page 1of 3

Maths

Assignment
Ch -3 Work &
Remuneration
1.

Sam and Mohit together can fnish a work in 15 days, while


Mohit alone can fnish it in
20 days. In how many days can Sam alone fnish the work?
2. Kautilya can do a piece of work in 25 days and Neel can fnish
it in 20 days. They work together for 5 days and then Kautilya
leaves. In how many days will Neel fnish the remaining work?
3. P and Q can do a piece of work in 12 days; Q and R can do it
in 15 days while R and P
can fnish it in 20 days. If P, Q, R works together, in how many
days will they fnish the work? In how many days will each one
of them finish it, working alone?
4. Kranti can do a piece of work in 6 hours while Saloni alone
can do it in 16 hours. If Kranti, Saloni and Zubin working
together can finish it in 8 hours, in how many hours can Zubin
alone fnish the work?
5. Manthan and Kruti can finish a piece of work in 6 days
and 4 days respectively.
Manthan started the work and worked at it for 2 days. He was
then joined by Kruti. Find the total time taken to finish the
work.
6. Krutarth and Rohan can do a piece of work in 20 days and
12 days respectively.
Krutarth started the work alone and then after 4 days
Rohan joined him till the completion of the work. How long
did the work last?
7.
A is 30% more efficient than B. How much time will they,
working together, take to complete a job which A alone could
have done in 23 days?
8. Pooja can do a piece of work in 20 days. Kinjal is 25% more
efficient than Pooja. What
will be the number of days taken by Kinjal to do the same piece
of work?
9. Three taps A, B and C can fll an overhead tank in 6 hours,
8 hours and 12 hours respectively. How long would the three
taps take to fill the empty tank, if all of them are opened
together?
10. A tap A can fill a cistern in 4 hours and the tap B can empty
the full cistern in 6 hours. If both the taps are opened together
in the empty cistern, in how much time will the cistern be flled
up?
11. A cistern can be filled by two taps A and B in 12 hours and
16 hours respectively. The full cistern can be emptied by a
third tap C in 8 hours. If all the taps are turned on at the
same time, in how much time will the empty cistern be flled
completely?
12. A tank can be flled by two taps A and B in 8 hours and 10

hours respectively. The full tank can be emptied by a third


tap C in 9 hours. If all the taps are turned on at the same
time, in how much time will the empty tank be filled up
completely?
13. A pipe can fill a cistern in 9 hours. Due to a leak in its bottom,
the cistern flls up in 10
hours. If the cistern is full, in how much time will it be emptied
by the leak?
14. A pipe can fill a cistern in 9 hours. Due to a leak in its
bottom, the cistern flls up in 10 hours. If the cistern is full, in
how much time will it be emptied by the leak?
15. A can do 1/3 of a work in 5 days and B can do 2/5 of the work
in 10 days. In how many days both A and B together can do the
work?
16. Sumeet can do 1/2 of a work in 4 days and Vineet can do 3/7
of the work in 3 days. In how many days can both of them
together do the work?

Chapter 4:
Factorisation 1
Factorise the
following
2

1. 18mn
2
2. 14x y
3. 20x + 15
2
2
4. 12xy + 9x y 18xy
2
5. 2n + 3n
6. 6ab - 9bc
2 2
7. 6a b c + 27abc
3
2
8. 18a - 27a b
2
9. (3x + 1) 5(3x + 1)
10. 2a(b - c) + 3(b c)
11. (2a 3b) (x y) + (3a 2b) (x y)
12. 5a(2x - 3y) + 2b(2x - 3y)
2
13. 8(4x + 5y) - 12(4x + 5y)
14. 5z(x 2y) - 4x +8y
2
15. (x 3y) 5x + 15y
2
16. 1 + a + ac + a c
2
17. a - ac + ab bc
2
18. a + 3a + ac + 3c
2
19. 2x + cx + 2c + c
2
20. x - ax + 5x - 5a
21. ax - bx - az + bz
22. mx - 2my - nx + 2ny
2
2
23. ax - 3bxy axy + 3by

24.
25.
26.
27.
28.
29.

x - 3x - xy + 3y
2

ax + bx + 2a + 2b
2

2ax + 3axy - 2bxy - 3by


2

amx + bmxy anxy bny

(x + y) (2x + 5) - (x + y) (x + 3)
2

6ab - b + 12ac - 2bc

You might also like