Professional Documents
Culture Documents
Drills
Fire Drill
Fire Drill
Heat
The energy necessary to
increase the temperature of
fuel to where sufficient
vapors are given off for
ignition to occur
Before you open any door, feel the door with the
back of your hand. If the door is warm to the touch,
DO NOT attempt to open the door.
Stuff the cracks around doors with towels, rags,
clothing or tape, and cover vents to keep out smoke.
Stay low to the floor, and if possible, cover your
mouth and nose with a damp cloth or dust mask to
help you breathe.
Call out for help or make sound
if you think rescuers are near.
Conserve your energy.
Latest in earthquake
information
Review of what we
should do
Phase 2. Response
While the siren/ bell is ongoing,
everyone should seek shelter and
protect themselves. In this phase,
everyone should perform duck,
cover and hold under desks,
tables or chairs and remain in such
position until the shaking stops.
GSIS, Carmen
Cag. de Oro City
Phase 3. Evacuation
Once the shaking stops, all
occupants/ employees should
evacuate the building and proceed to
identified evacuation area/s using
predetermined routes.
GSIS, Carmen
Cag. de Oro
City
Phase 4. Assembly
At the designated evacuation
area/s, employees must be
grouped according to the
division / unit where they
belong.
Phase 5. Head Count
Leaders should check and make
sure that all personnel are accounted
for.
XU High School
Pueblo de Oro
Cag. de Oro City
XU High School
Pueblo de Oro
Cagayan de Oro City