Pengerang Integrated

Petroleum Complex
(PIPC)

Johor Petroleum Development Corporation Berhad | 2015

Economic Transformation Programme


(ETP)

Johor Petroleum Development Corporation Berhad | 2015

Economic Transformation Programme (ETP)

Comprehensive effort to transform Malaysia into a high income nation by


2020; target 6% GNI annual growth

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Downstream Oil & Gas development in Johor is part of


EPP4 and EPP13 under ETP Oil, Gas and Energy (OGE)
NKEA

DIVERSIFY
GROW
SUSTAIN

BO

Grow in downstream

Continue domestic Oil & Gas


production

4.

1.
2.
3.

Enhanced oil recovery


Develop small fields
Increase exploration activities

5. Unlock latent gas demand


through LNG import

1.

Increased oil & gas production


abroad

2.
3.

EPPs

Build alternative energy capabilities

Create a regional oil storage and


trading hub

Make Malaysia #1 Asian hub for oil field


services
6. Increase presence of major international
oilfield services players
7. Create regional fabrication champions
8. Encourage JV with world-class
companies
13. Increasing petrochemical output
Increase volumes in primary logistics
Increase marketing of petroleum
products

9.

Reduce energy bill through


energy efficiency
10. Build up solar power capacity
11. Ensure best practice nuclear
deployment
12. Drive industrial growth in
Sarawak with big hydro

4.
5.
6.

Growth driven power demand


Growth driven transmission and
distribution capacity
Improve structure of Malaysia
energy supply industry

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

EPP4: Malaysia can become a regional oil storage hub with


proximity to Singapore, deepwater & land availability

Total Storage Tank


Capacity

10

Senai Airport

Million
cbm

Storage Tank Capacity

Proposed
bridge link
to Tg Bin

Storage Tank Capacity

Singapore

South
Johor
can
complement Singapore
to form an oil storage
with 10 Million cbm if
all
the
potential
projects are realised

Million
cbm

Storage Tank Capacity

5
Million
cbm

Million
cbm

Tanjung Bin

Tanjung Langsat

Oil storage
Developer : Seaport
Worldwide
Current storage capacity :
890,000 cbm

Oil storage, marine services, steel,


OFSE*, chemical
Developer : Johor Corporation
Current storage capacity : 820,000
cbm

Pengerang
Oil storage
Current storage capacity :
1.3mil cbm

Opportunity

Demand to build
storage capacity for
the region

Complementing
Singapore, the only
major independent
terminal and storage
facility in South East
Asia

Potential for oil


trading business,
future development
of downstream
industry (e.g.:
refinery, oil based
petrochemical
complex, LNG regas
terminal)
2020 total
new jobs:

790
*OFSE: Oilfield Services and Equipment

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

2020 GNI
impact:

RM1.63
Billion

EPP13: Petrochemical Complex will be built in Sipitang and


Pengerang to increase Malaysias petrochemical output

Sipitang
Sipitang Oil & Gas
Industrial Park (SOGIP)

4,000 acres
Project SAMUR PETRONAS
Ammonia
Urea

Pengerang
Pengerang Integrated
Petroleum Complex (PIPC)

New Jobs

RM2.9

450

Billion

Private
Investment

Public
Investment

RM4.5

RM0.02

Billion

Billion

20,000 acres
Project RAPID PETRONAS
DIALOG-Vopak Pengerang Terminal
Refinery
Petrochemical Plants

2020 GNI

New Jobs

RM18.3

8,600

Billion

2020 GNI

Private
Investment

Public
Investment

RM69

RM1.7

Billion

Billion

PETROCHEMICALS
OUTPUT

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Johor Petroleum Development Corporation


(JPDC)

Johor Petroleum Development Corporation Berhad | 2015

Implementation of EPP4 and EPP13 to be carried out by


creating a specialised body to coordinate, facilitate and
fast track the oil & gas development in Johor
Implementation of large-scale development
projects will require
Seamless coordination amongst
various parties (i.e. Government
agencies, private corporations,
investors) to ensure timely delivery
of projects as well as to facilitate
private investments

Coordination

Integrated
development
planning

Formulation of integrated
development plans for industrial
and services sectors

Sufficient fund

Sourcing and managing large


amount of funds to finance for
infrastructure and facilities

Promotion and
marketing

Strong marketing capabilities and


focused promotional strategies to
attract investors

Johor Petroleum Development Corporation


(JPDC)
NKEA OGE SC1

PEMANDU

MPRC2

JPDC3
Wholly owned by
MPRC with own
Board of Directors

JPDC

JPDC BOD

MPRC wholly-owned subsidiary set up to


coordinate the development of oil & gas
sector in Johor
JPDC Board of Directors also plays an
advisory role to JPDC on development
direction of O&G in Johor.

1 National Key Economic Area Oil, Gas & Energy Steering Committee
2 Malaysia Petroleum Resources Corporation
3 Johor Petroleum Development Corporation

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Board of Directors
Co-Chairman
Johor Chief Minister
YAB DatoSeri
Mohamed Khaled
Nordin

FEDERAL

STATE

Co-Chairman
Minister in Prime
Ministers Department
YB Senator Dato Sri
Idris Jala

INDUSTRY

Secretary General of
Treasury, Ministry of
Finance
Y.Bhg. Tan Sri Dr Mohd
Irwan Serigar Abdullah

Johor State EXCO


Member
Y.B. Datuk Ir. Haji Hasni
Haji Mohammad

Petrochemicals Advisor
Y.Bhg. Datuk Wan
Zulkiflee Wan Ariffin

Director General,
Economic Planning Unit
Y.Bhg. Datuk Seri Dr.
Rahamat Bivi Yusoff

Johor State Secretary


Y.B. Dato Haji Ismail bin
Karim

Oil Storage & Trading


Advisor
Y.Bhg. Tan Sri Dr. Ngau
Boon Keat

President / CEO, MPRC


Y.Bhg. Datuk Shahrol
Azral Ibrahim Halmi

Director, UPEN Johor


Tuan Hj. A. Rahim Bin
Hj. Nin

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

SPECIALISED
BODY

Chief Executive, JPDC


En. Mohd Yazid Jaafar

Pengerang Integrated Petroleum Complex


(PIPC)

Johor Petroleum Development Corporation Berhad | 2015

Why Pengerang? Strategic location at the south-east tip of


Peninsular Malaysia

MALAYSIA
Pengerang

Pengerang

Jurong

Strategic Location
Access to existing major international
shipping lanes
Middle East Singapore China
Water depth of 24m enables VLCCs1 and
ULCCs2
Safe and sheltered harbour
No breakwater required with sufficient
seagoing passage for VLCCs and ULCCs

Low negative socioeconomic impact


Availability of sufficient development land
A single candidate plot in excess of
20,000 acres
Very few Environmentally Sensitive
Areas (ESAs) which are easily preserved
Proximity to an existing major trading hub;
Adjacent to Singapore

1 Very Large Crude Carrier


2 Ultra Large Crude Carrier

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

An Integrated Petroleum Complex that will house Storage


Facility, Oil Refineries, Petrochemical Plants, and LNG
Regasification Facility

ILLUSTRATIVE
To National Grid
Residential and Commercial Areas
Into PGU

Power Plant

Oil Refineries
Crackers

Preserved Environmentally
Sensitive Area

LNG
Regasification
Plant

Crude & LNG Import

Pipeline

Crude & LNG


Storage

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

PIPC core activities


Refineries

Petrochemical Plants

LNG Storage Tanks

Power Plant

Regasification Plant

Naphtha Crackers

Oil Storage Tanks


"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

PIPC non-refining industry planning


Emergency Coordination
Centre
Emergency Coordination
Hospital / Clinic
PIPC Security Coordination

Downstream Finished Product


Zone (1,081 acres)
Plastics and Fine Chemicals
Small / Medium Enterprise

Medium and Light


Industry Hub (700 acres)
Support Industries
Testing and Metering

Waste Management
Centre (60 acres)
Waste Water Treatment
Solid Waste Conversion

Emergency Response
Centre (10 acres)
Fire Response Team
Ambulance Base
Solid Logistics Hub (125
acres)
Container Facilities
Sulphur and Coke
Centralised Tank Farm; CTF
(1,400 acres)
Crude and Product Handling
Sulphur and Coke Handling

Commercial Services Hub


(180 acres)
Professional Services
Banking and Finance

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

PIPC consists of multi-billion ringgit projects in an area of


land covering 20,000 acres

Total Potential
RM170+ billion of investment
20,000 acres of industrial area

PETRONAS RAPID
RM53 billion refinery and
petrochemicals
RM36.3 billion associated
facilities
6,242 acres
Ready for start up early
2019

Investor 1

DIALOG-VOPAK-SSI
RM5-10 billion
1,300 acres (including 500
acres reclaimed land)
Petroleum and LNG Terminals
LNG Regasification Plant
Phase 1 operational April 2014

Potential Investor 1
RM27 billion
2,000 acres
Refinery
Petroleum Products
Aromatics Products

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Investment in Pengerang constitutes 31% of committed


investment announced for ETP and will play key roles in
meeting Malaysias future energy requirement
Committed Investment
(Total: RM219.3 billion)

Other NKEA
investments

as of 31 Dec 2013

69%

Providing option to meet nations future


energy requirement

31%
Oil & Gas Investment in Pengerang
(RM69 billion)

Economic
Impact:

2020 GNI and Job creation from Oil &


Gas investment in Pengerang
2020 GNI
impact:

RM18.3
Billion

Strategic Reasons for


Pengerang Development

Total job
creation

8,600

Pengerang LNG Regasification


terminal to meet increasing
demand for natural gas in Malaysia
PETRONAS new oil refinery to
supply for domestic fuel
consumption
Major regional manufacturer of
specialised petrochemical products

Potential source of revenue for Malaysia


from petroleum product trading activities

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Malaysia Federal Government and Johor State Government


lend full support for PIPC development

PIPC is a National Project of


strategic importance
Economic Council decision, 13
February 2012 chaired by Prime
Minister of Malaysia

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Development Updates

Johor Petroleum Development Corporation Berhad | 2015

Pengerang Terminal in PIPC has begun construction in


2011

Petroleum Terminal
500 acres reclaimed land
Deepwater (24m); jetty facilities capable of
handling VLCCs and ULCCs
Storage capacity 5 mil cbm
Phase 1 started operation April 2014
Phase 1 completed 30 December 2014

LNG
LNG

Phase 1 : 150 acres + Capacity of 1.3


million cbm + 6 berths = RM 1.9 billion

Investment Value
RM5 Billion
LNG Terminal
Dedicated terminal (capacity: 400,000 cbm)
Independent terminal (capacity: 360,000
cbm)

Investment Value
RM4.08 Billion
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

PETRONAS RAPID project was launched by HRH Sultan of


Johor & YAB Prime Minister on 13 May 2012

Project Information
RAPID consists of:
Refinery (300k barrel-per-day refining
capacity)
Naphtha cracker
20 to 24 petrochemical plants
The complex is supported by associated
facilities:
LNG regasification plant
Power generation plant
Air separation unit
Dedicated storage terminal
Raw water supply project

Project Progress
Site preparation & earthwork in progress
PETRONAS has inked 3 Heads of Agreements
to build specialty chemical plants, with;
i. Italy's Versalis SpA (signed shareholders
agreement)
ii. Japan's Itochu (signed shareholders
agreement)
iii. Germanys Evonik
Final Investment Decision (FID) approved 3
April 2014
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Timeline for PIPC project

Construction of
Taman Bayu
Damai starts

Construction of
Taman Bayu
Damai ends

Commencement
of DIALOGs
first phase
operation

Construction
of DIALOGs
first phase

Launch first phase


construction
DIALOG
Q3 2011

Investor 1
FID

Investor 1
commissioning

Construction of Taman
Bayu Damai* starts
2 April 2012
RAPID Site Clearance
19 October 2012

2011

2012 Apr

2013

Nov 2014

2015

RAPID Final Investment


Decision (FID)
April 2014

2016 2017 2018 2019 2020 2021


DIALOGs first phase
operation commences
April 2014

RAPID site
clearance starts

RAPID FID

RAPID
COMMISSIONING

Construction of Taman
Bayu Damai ends
Q4 2014
Investor 1
FID
Q1 2016

Construction of RAPID
RAPID commissioning
Early 2019

*Taman Bayu Damai New settlement for villagers that are directly affected by RAPID

Investor 1 commisioning
Q1 2020

"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC

Main Office
Suite 17.03A, Level 17,
Menara MSC Cyberport,
No. 5, Jalan Bukit Meldrum,
80300 Johor Bahru,
Johor, Malaysia.
Tel
: +607 267 2900
Fax
: +607 267 2999
enquiries@jpdc.gov.my
www.jpdc.gov.my
facebook.com/johorpetroleumdevelopmentcorporationberhad

Thank you
Johor Petroleum Development Corporation Berhad | 2015