04-07-16 DPR Steel Liner Factory Daily Progress Report (Night Shift)

You might also like

You are on page 1of 1

NEELUM

JHELUM

DATE

NJHP: DAILY INSPECTION REPORT


Reporter:

Sheraz Adil Awan

R.E: Juan Morales

04 July,2016

CONSULTANTS

Site/Location: C-2 STEEL FACTORY & HRTT STEEL LINING, Night Shift (Fabrication / Installation)
MANPOWER
Expatriate
Superviso
r

Machine
Operator
Tunnel

Surveyor
0

Factor
y

GB Technician

Translator

GB
Technician

NDT
Technician

Painter

Safety
Supervisor

Translator

Tunnel

0
Rigger

Factor
y

Tunnel

SAW Operator

Qualified

Factor
y

Welders

Local

Tack

Tunnel

Factor
y

Factor
y

Tunnel

Tunnel

Factor
y

Tunnel

Factor
y

Tunnel

Labour
Factor
y

Tunnel

Crane
Operator
Factor
y

Tunnel

MACHINERY & EQUIPMENT


Preheat Equipment
Flux
Heater for
SAW

Total
Station

Infrared
Electrode Dryer

Electrode Oven

Electrical Preheaters
(1000150)mm

Factor
y

Tunnel

N/A

Miscellaneous Machines
GMAW
Welding
Ultrasonic
Plant
Bending
Flaw
(NBMachine
Detector
500)

SAW
Welding
Plant
(MZ-1000)

SMAW
Welding
Plant
(ZX7500)

Factor
y

Tunnel

N/A

N/A

Quantity

Status of
Equipmen
t

Quantity

Transformer
(LWK-B) 30kw
0
Transformer
(LWK-B) 240kw

Electrical
Pre-heaters
(300250)
mm

Status of
Equipmen
t

Air
Gouging
Machine
(ZX7630)

Grinder Consumed

Compressor
(YM-132s-2)

X-Ray
Tube
(XXG
3005)
0

N/A

Cutting
Machines
CNC

CG-30

N/A

N/A

Consumable Items

Grinder
(TWS
6000)
100mm

Grinder
(GWS-14150CI)
150mm

Filler Metal 1.2mm


AWS ER70S-6 For
GMAW

Electrodes
(AWS
E9015)4mm

Electrodes
(AWS
E9015)3.2mm

Filler Metal 4mm


H08MnMoA
For SAW

Unit

Discs

Discs

Kg

Kg

Kg

Kg

Factory

Tunnel

60

N/A

Quantity

Status of
Equipment

th

Internal Circumferential Butt Welding (SMAW) of 4 joint between 12m Cans B-004 & B-021 is in progress.
Page 1 of 1