HRR
PMC:
Daily Progress Report for
IS
1 Material
Pipes mtrs
a) Incoming Material Clearance Fittings nos.
Flanges Nos. nos.
2 Welding
CS nos.
SS (304+304L)
a) WPS / PQR SS - nos.
CS(309+309L)
AS nos.
CS nos.
b) Welders qualification SS nos.
AS nos.
Date :-
Performed by ISGEC Witnessed by TPI Accepted by TPI
For the day Cumulative For the day For the day
Cumulative ID
ID ID ID ID
81536 - 81536 -
0 27286 0 27286 -
0 9346 0 9346 -
- - - - -
0 07 00 07 0
- - - - -
- - - - -
0 43 0 43 0
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
55 9045 55 9045 51
02 446 2 446 2
0 2957 0 3257 0
- - - - -
- - - - -
80 77903 69 77892 66
7 3889 7 3889 6
11 3100 11 3713 10
05 1898 05 2956 03
30 5015 30 5015 27
24 3830 24 3830 24
-
-
-
12
-
-
43
-
-
-
- NOT APPLICABLE
-
-
9041
446
3257 Branch ,weldolet & support
-
-
77889 STP Spools 4379 & Piping spools
5013
3830
GRAND TOTAL
PERIPHERAL BOUNDRY
BRICKS REQUIRED
BRICKS REQUIRED
TOTAL
30 9" THK.
5357.14285714286
10 15 0.75
112.5
225
2678.57142857143
10000.00
8035.71428571429
56.25 NORTH+SOUTH
168.75 EAST+WEST
669.6428571
2008.928571
2678.5714
CUSTOMER:
HRR
PMC:
Daily Progress Report for
IS
Qualitati
No. of TPI Surveyors: 01
Radiography status:
Cumulative 5097
HRRL DFCU
71 1 1.32 0
5 5 0
25.03.2023
RT/RS
Open
1 2.8.22 L&T
2 3.8.22 L&T
3 8.8.2022
5 10/11/2022 L&T