You are on page 1of 4

Job No.

No. Report

Project Name
Client / Owner

:
:

COORDINATE OF PILING REPORT Location

Contractor

Page no.

Inspection

No.

Tank no.

Capasity
Tank

Piling
No.

Piling Date

36

300

T-36-1

5-May-14
5-May-14

36

300

T-36-2

36

300

T-36-3

6-May-14

36

300

T-36-4

6-May-14

300

T-36-5

6-May-14
6-May-14

36

36

300

T-36-6

36

300

T-36-7

6-May-14

36

300

T-36-8

6-May-14

Prepared by,
PT. Truba Jaya Eng.

Dwg. Coordinate Piling


E

762,610.147
762,609.473
762,611.930
762,609.039
762,608.799
762,613.485
762,611.496
762,606.809

195,638.310
195,639.979
195,638.060
195,636.892
195,641.648
195,639.659
195,634.972
195,636.962

Actual Coordinate Piling

Deviation Coordinate Piling

###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###

0.107
(0.027)
(0.040)
0.199
(0.171)
0.135
(0.024)
0.059

0.040
0.059
0.020
0.122
0.032
0.019
0.182
0.048

Pile Cut Off


Level

Top Pile

+ 2.65 m

2.79

+ 2.65 m

2.84

+ 2.65 m

2.80

+ 2.65 m

3.21

+ 2.65 m

3.30

+ 2.65 m

3.29

+ 2.65 m

3.06

+ 2.65 m

3.10

Actual

Approved by,
PT. Energi Sejahtera Mas

Remarks