No. Report
Project Name
Client / Owner
:
:
Contractor
Page no.
Inspection
No.
Tank no.
Capasity
Tank
Piling
No.
Piling Date
36
300
T-36-1
5-May-14
5-May-14
36
300
T-36-2
36
300
T-36-3
6-May-14
36
300
T-36-4
6-May-14
300
T-36-5
6-May-14
6-May-14
36
36
300
T-36-6
36
300
T-36-7
6-May-14
36
300
T-36-8
6-May-14
Prepared by,
PT. Truba Jaya Eng.
762,610.147
762,609.473
762,611.930
762,609.039
762,608.799
762,613.485
762,611.496
762,606.809
195,638.310
195,639.979
195,638.060
195,636.892
195,641.648
195,639.659
195,634.972
195,636.962
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0.107
(0.027)
(0.040)
0.199
(0.171)
0.135
(0.024)
0.059
0.040
0.059
0.020
0.122
0.032
0.019
0.182
0.048
Top Pile
+ 2.65 m
2.79
+ 2.65 m
2.84
+ 2.65 m
2.80
+ 2.65 m
3.21
+ 2.65 m
3.30
+ 2.65 m
3.29
+ 2.65 m
3.06
+ 2.65 m
3.10
Actual
Approved by,
PT. Energi Sejahtera Mas
Remarks