Professional Documents
Culture Documents
15-Dec-14
Description
***
Unit
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
10
Rmt
11
KM
12
13
14
15
Cable Laying
Location Box inside All fitting
ARA & Fuse etc
Main Cable Termination &
Testing - C T Rack & All
location
16
17
18
KM
KM
Nos
Nos
Nos
Nos
Nos
Actual Dates
PLAN
Plan
ACTUAL
Total Scope
40
30
16
40
30
16
18
500
110
40
92
90
20
50
% Complete
Start
Finish
11.09.14
15.02.15
Start
11.09.14
25.12.14
12/30/1899
11.09.14
25.12.14
12/30/1899
11.09.14
30.09.14
12/30/1899
11.09.14
25.12.14
12/30/1899
01.10.14
31.12.14
12/30/1899
01.10.14
31.12.14
12/30/1899
01.12.14
31.12.14
12/30/1899
01.12.14
31.12.14
12/30/1899
Finish
Today
Cummulative
30
Today
22
24
16
55%
53%
13
28
22
100%
16
13
50%
01.01.15
15.01.15
12/30/1899
25.11.14
10.01.15
12/30/1899
01.12.14
10.01.15
12/30/1899
01.12.14
10.01.15
12/30/1899
27.11.14
15.01.15
12/30/1899
15.12.14
15.01.15
12/30/1899
25
225
12.00
55%
1.4
0.00
0.00
2.4
0.150
3.72
43%
38.7
4.0
24.80
3
-
0%
3
-
0%
7
-
0%
2%
213
-
0%
1
-
53%
0.00
2.5
6
-
0.00
0.2
5
-
0
1
0
1
8
-
0
1
8
-
0
5
23%
14
01.01.15
31.01.15
12/30/1899
01.01.15
31.01.15
12/30/1899
01.01.15
31.01.15
12/30/1899
01.01.15
31.01.15
12/30/1899
Remarks
Next day
Cummulative
0
1
Backlog
15-Dec-14
Description
Unit
20
21
22
23
24
25
26
27
28
29
30
2
3
Nos
Nos
Nos
KM
Nos
Nos
Set
Set
Nos
Nos
Nos
Lot
PPK
Nos
Nos
L.S.
L.S.
Lot
PLAN
Plan
ACTUAL
% Complete
Start
19
Actual Dates
Total Scope
40
20
20
10
10
10
18
20
15
165
Finish
Start
Finish
Today
Cummulative
Today
Backlog
Next day
Cummulative
01.01.15
03.02.15
12/30/1899
06.01.15
31.01.15
12/30/1899
06.01.15
31.01.15
12/30/1899
01.12.14
15.01.15
3.5
12/30/1899
06.01.15
31.01.15
12/30/1899
0.5
30%
06.01.15
31.01.15
12/30/1899
25.01.15
31.01.15
12/30/1899
25.01.15
31.01.15
12/30/1899
15.01.15
31.01.15
12/30/1899
15.01.15
31.01.15
12/30/1899
15.01.15
31.01.15
12/30/1899
25.01.15
31.01.15
11.09.14
25.09.14
15
15
15.09.14
15.11.14
24.09.14
31.12.14
25.09.14
30.09.14
01.01.15
15.01.15
01.10.14
06.10.14
125
120
Remarks
100%
100%
73%
5
-
100%
0%
100%
0.4
15-Dec-14
Description
Unit
10
11
12
13
14
15
16
17
18
I P S Fixing ,wiring
IPS To Relay Room Power
wiring
19
20
21
22
1 to 1 wire testing
Control Phone commission with
control office
23
24
Nos
Nos
Nos
Nos
Nos
Job
L.S.
Set
Set
Nos
Nos
L.S.
Nos
Nos
Nos
Set
Nos
No
PLAN
Plan
ACTUAL
% Complete
Start
7
Actual Dates
Total Scope
165
26
15
15
40
Finish
Start
Finish
Today
Cummulative
10
145
Today
Backlog
Next day
Cummulative
26.09.14
31.12.14
15.01.15
20.01.15
15.01.15
20.01.15
06.01.15
10.01.15
17.01.15
20.01.15
17.01.15
21.01.15
17.01.15
21.01.15
18.01.15
21.01.15
18.01.15
22.01.15
15.01.15
31.01.15
28.01.15
31.01.15
26.12.14
31.12.14
20.01.15
24.01.15
20.01.15
24.01.15
10.01.15
16.01.15
0
0
After Comp. of KPT Singling work-Tuna
St.
0
0
10.02.15
12.02.15
13.01.15
17.01.15
0
0
120
Remarks
73%
25
15-Dec-14
Description
Unit
26
27
28
Simulation Testing
29
30
31
32
Testing work
Commissioning work
LS
Nos
LOT
LOT
LOT
PLAN
Plan
ACTUAL
% Complete
Start
25
Actual Dates
Total Scope
Nos
Lot
Lot
Finish
Start
Finish
Today
Cummulative
Today
Backlog
Next day
Cummulative
20.01.15
24.01.15
26.01.15
30.01.15
20.01.15
24.01.15
01.02.15 0.2.02.15
03.02.15
07.02.15
07.02.15
09.02.15
10.02.15
14.02.14
14.02.15
15.02.15
Unplanned Activities
0
0
Manpower
Sr. No
Unit
Actual
Fitter
Nos
Nos
Mason
Nos
Nos
Wireman
Nos
Nos
Carpenter
Nos
Nos
Supervisor
Nos
Unskilled labour
Nos
25
10
Remarks
Remarks
Description
Planned Dates
Start
Nos
Total Scope
40
Start date
11.09.14
Finish date
25.12.14
Plan Sept'14
ActualSept'14
Plan Octo'14
12
ActualOcto'14
5
10
Nos
30
11.09.14
25.12.14
7
5
6
3
Nos
11.09.14
30.09.14
4
-
5
4
Nos
16
11.09.14
25.12.14
3
5
Nos
40
01.10.14
31.12.14
5
10
7
6
Nos
30
01.10.14
31.12.14
9
5
5
7
Nos
01.12.14
31.12.14
4
-
Nos
16
01.12.14
31.12.14
5 of 221
Description
Point machine fixing &
Roading
Planned Dates
Start
Total Scope
18
Start date
01.01.15
Finish date
15.01.15
Plan Sept'14
ActualSept'14
Plan Octo'14
ActualOcto'14
-
10
Rmt
500 25.11.14
10.01.15
11
KM
4.00 01.12.14
10.01.15
12
KM
7.00 01.12.14
10.01.15
13
Cable Laying
KM
110
27.11.14
15.01.15
14
15
Nos
40
15.12.14
15.01.15
Nos
92
01.01.15
31.01.15
16
Nos
90
01.01.15
31.01.15
17
Nos
20
01.01.15
31.01.15
6 of 221
Description
Planned Dates
Start
Total Scope
Start date
Finish date
Plan Sept'14
ActualSept'14
Plan Octo'14
-
7 of 221
ActualOcto'14
-
Description
TLD fixing & Cable
termination
Planned Dates
Start
Total Scope
50
Start date
01.01.15
Finish date
31.01.15
Plan Sept'14
ActualSept'14
Plan Octo'14
ActualOcto'14
-
19
Nos
40
01.01.15
03.02.15
20
Nos
20
06.01.15
31.01.15
21
Nos
20
06.01.15
31.01.15
22
KM
10
01.12.14
15.01.15
23
Nos
10
06.01.15
31.01.15
24
Nos
10
06.01.15
31.01.15
25
Set
25.01.15
31.01.15
26
Set
25.01.15
31.01.15
8 of 221
Description
Planned Dates
Start
Total Scope
Start date
Finish date
Plan Sept'14
ActualSept'14
Plan Octo'14
ActualOcto'14
27
Nos
15.01.15
31.01.15
28
Nos
18
15.01.15
31.01.15
29
30
Nos
20
15.01.15
31.01.15
Lot
25.01.15
31.01.15
PPK
15
11.09.14
25.09.14
15
15
Nos
15.09.14
15.11.14
2
3
Nos
165 24.09.14
31.12.14
60
L.S.
25.09.14
30.09.14
56
-
9 of 221
40
64
Description
Fuse and bas Bar Power
wiring to CTR
Planned Dates
Start
Total Scope
1
Start date
01.01.15
Finish date
15.01.15
Plan Sept'14
ActualSept'14
Plan Octo'14
ActualOcto'14
Lot
01.10.14
06.10.14
Nos
165 26.09.14
31.12.14
40
50
53
I P S Fixing ,wiring
Nos
15.01.15
20.01.15
Nos
15.01.15
20.01.15
Nos
06.01.15
10.01.15
Nos
17.01.15
20.01.15
Job
17.01.15
21.01.15
L.S.
17.01.15
21.01.15
10 of 221
13
12
11
67
10
Description
Block Instrument fixing &
wiring
Planned Dates
Start
Total Scope
1
Start date
18.01.15
Finish date
21.01.15
Plan Sept'14
ActualSept'14
Plan Octo'14
15
Set
18.01.15
22.01.15
Nos
26
15.01.15
31.01.15
Nos
15
28.01.15
31.01.15
L.S.
26.12.14
31.12.14
Nos
20.01.15
24.01.15
Nos
20.01.15
24.01.15
1 to 1 wire testing
Nos
15
10.01.15
16.01.15
Set
11 of 221
22
21
20
19
18
17
16
ActualOcto'14
Planned Dates
Start
Sr. No
Description
Unit
23
Nos
Total Scope
1
Start date
10.02.15
Finish date
12.02.15
Plan Sept'14
ActualSept'14
Plan Octo'14
24
No
40
13.01.15
17.01.15
Simulation Testing
LS
20.01.15
24.01.15
Nos
26.01.15
30.01.15
LOT
20.01.15
24.01.15
LOT
01.02.15
0.2.02.15
LOT
03.02.15
07.02.15
Nos
07.02.15
09.02.15
Testing work
Lot
10.02.15
14.02.14
12 of 221
31
30
29
28
27
26
25
ActualOcto'14
Planned Dates
Start
Description
Unit
Commissioning work
Lot
Total Scope
1
Start date
14.02.15
Finish date
15.02.15
Plan Sept'14
ActualSept'14
Plan Octo'14
13 of 221
ActualOcto'14
Description
Unit
Nos
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
Nos
Nos
Nos
Nos
Nos
Nos
Nos
21
5
-
24
8
-
ActualFeb'15
Plan Feb'15
19
-
ActualJan'15
23
-
Plan Jan'15
16
-
14 of 221
Description
Point machine fixing &
Roading
Unit
Nos
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
-
10
Rmt
KM
50
KM
2.80
5.20
2
13
Cable Laying
KM
6.00
14
15
Nos
70.00
Nos
20.00
Nos
Nos
92.00
-
90.00
-
17
20.00
16
34.00
25
1.80
2
1.20
-
ActualFeb'15
100
12
Plan Feb'15
18
350
12
ActualJan'15
11
Plan Jan'15
20.00
15 of 221
Description
Unit
Plan Nov'14
ActualNov'14
Plan Dec'14
-
16 of 221
ActualDec'14
Plan Jan'15
-
ActualJan'15
Plan Feb'15
-
ActualFeb'15
-
Description
TLD fixing & Cable
termination
Unit
Nos
Plan Nov'14
ActualNov'14
Plan Dec'14
Nos
Nos
Nos
KM
Nos
Nos
Set
Set
10
-
10
-
1
-
26
3.00
25
7.00
24
20.00
23
ActualFeb'15
20.00
22
Plan Feb'15
40.00
21
ActualJan'15
50.00
20
Plan Jan'15
19
ActualDec'14
17 of 221
Description
Unit
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
27
Nos
Nos
30
Nos
ActualFeb'15
18
-
20
-
Lot
Plan Feb'15
29
ActualJan'15
28
Plan Jan'15
1
-
PPK
Nos
Nos
L.S.
25
40
18 of 221
10
11
12
13
Description
Fuse and bas Bar Power
wiring to CTR
I P S Fixing ,wiring
Unit
Plan Nov'14
ActualNov'14
L.S.
Lot
Nos
Nos
Nos
Nos
Nos
Job
L.S.
25
Plan Dec'14
ActualDec'14
Plan Jan'15
50
Plan Feb'15
ActualFeb'15
1
-
19 of 221
ActualJan'15
15
16
17
18
19
20
21
22
Description
Block Instrument fixing &
wiring
1 to 1 wire testing
Unit
Set
Set
Nos
Nos
L.S.
Nos
Nos
Nos
Set
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
Plan Jan'15
Plan Feb'15
ActualFeb'15
1
-
26
15
20 of 221
ActualJan'15
Description
Unit
23
Nos
24
25
26
27
28
29
30
31
Simulation Testing
Testing work
No
LS
Nos
LOT
LOT
LOT
Nos
Lot
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
Plan Jan'15
21 of 221
ActualJan'15
Plan Feb'15
ActualFeb'15
Description
Unit
Commissioning work
Lot
Plan Nov'14
ActualNov'14
Plan Dec'14
ActualDec'14
Plan Jan'15
22 of 221
ActualJan'15
Plan Feb'15
ActualFeb'15
1
Description
Unit
Nos
PLAN - Up to ACTUAL - Up
Date
to Date
40
22
Nos
30
16
Nos
5
6
Nos
16
8
Nos
40
22
Nos
30
13
Nos
5
-
Nos
16
-
23 of 221
Description
Point machine fixing &
Roading
Unit
Nos
PLAN - Up to ACTUAL - Up
Date
to Date
18
-
10
Rmt
500
12
11
KM
4
-
12
KM
7
3.72
13
Cable Laying
KM
110
25
14
15
Nos
40
-
Nos
92
-
16
Nos
90
-
17
Nos
20
24 of 221
Description
Unit
PLAN - Up to ACTUAL - Up
Date
to Date
-
25 of 221
Description
TLD fixing & Cable
termination
Unit
Nos
PLAN - Up to ACTUAL - Up
Date
to Date
50
-
19
Nos
40
-
20
Nos
20
-
21
Nos
20
-
22
KM
10
3
23
Nos
10
-
24
Nos
10
-
25
Set
1
-
26
Set
26 of 221
Description
Unit
PLAN - Up to ACTUAL - Up
Date
to Date
-
27
Nos
5
-
28
Nos
18
-
29
30
Nos
20
-
Lot
1
-
PPK
15
15
Nos
2
2
Nos
165
120
L.S.
1
1
27 of 221
Description
Fuse and bas Bar Power
wiring to CTR
Unit
L.S.
PLAN - Up to ACTUAL - Up
Date
to Date
1
-
Lot
1
1
Nos
165
120
I P S Fixing ,wiring
Nos
1
-
Nos
1
-
10
Nos
1
-
11
Nos
1
-
12
Job
1
-
13
L.S.
1
-
28 of 221
Description
Block Instrument fixing &
wiring
Unit
Set
PLAN - Up to ACTUAL - Up
Date
to Date
1
-
15
Set
1
-
16
Nos
26
-
17
Nos
15
-
18
L.S.
1
-
19
Nos
20
Nos
21
1 to 1 wire testing
Nos
22
Set
29 of 221
Description
Unit
23
Nos
PLAN - Up to ACTUAL - Up
Date
to Date
-
24
No
25
Simulation Testing
LS
26
Nos
27
LOT
28
LOT
1
-
29
LOT
1
-
30
Nos
1
-
31
Testing work
Lot
1
-
30 of 221
Description
Unit
Commissioning work
Lot
PLAN - Up to ACTUAL - Up
Date
to Date
1
31 of 221
Description
Unit
Nos
S
u
25.09.14
n
d
a
Plan ## y
Plan/
Actual
Actual
Actual ##
2
Nos
Plan ##
Actual ##
Nos
Plan ##
Actual ##
Nos
Plan ##
Actual
Nos
Plan
Actual
Nos
Plan
Actual
Nos
Plan
Actual
Nos
Plan
###
_
_
_
_
_
_
_
###
32 of 221
Description
Point machine fixing &
Roading
Unit
Nos
Plan/
Actual
Plan
Actual
10
Rmt
Plan
Actual
11
KM
Plan
Actual
12
KM
Plan
Actual
13
Cable Laying
KM
Plan
Actual
14
Nos
Plan
Nos
Plan
Actual
17
_
_
_
_
_
_
_
_
_
Plan
Actual
16
_
Nos
Actual
15
25.09.14
Nos
Plan
_
_
_
_
_
_
33 of 221
Description
Unit
Plan/
Actual
Actual
25.09.14
_
34 of 221
Description
TLD fixing & Cable
termination
Unit
Nos
Plan/
Actual
Plan
Actual
19
Nos
Plan
Actual
20
Nos
Plan
Actual
21
Nos
Plan
Actual
22
KM
Plan
Actual
23
Nos
Plan
Actual
24
Nos
Plan
Actual
25
Set
Plan
Actual
26
Set
Plan
25.09.14
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
35 of 221
Description
Unit
Plan/
Actual
Actual
27
Nos
Plan
Actual
29
Nos
Plan
Actual
30
Lot
Plan
Actual
PPK
Plan
Nos
Plan
Actual
_
_
_
_
_
_
_
###
Actual
2
_
_
Nos
Actual
28
25.09.14
Nos
Plan
_
_
_
_
#
Actual #
4
L.S.
Plan
Actual ##
36 of 221
Description
Fuse and bas Bar Power
wiring to CTR
Unit
L.S.
Plan/
Actual
Plan
25.09.14
_
###
Lot
Plan
Actual
Nos
Plan
_
_
#
Actual #
8
I P S Fixing ,wiring
Nos
Plan
Actual
Nos
Plan
Actual
10
Nos
Plan
_
_
_
_
_
###
11
Nos
Plan
Actual
12
Job
Plan
Actual
13
L.S.
Plan
Actual
_
_
_
_
_
_
37 of 221
Description
Block Instrument fixing &
wiring
Unit
Set
Plan/
Actual
Plan
Actual
15
Set
Plan
Actual
16
Nos
Plan
Actual
17
Nos
Plan
Actual
18
L.S.
Plan
Actual
19
Nos
Plan
Actual
20
Nos
Plan
Actual
21
1 to 1 wire testing
Nos
Plan
Actual
22
Set
Plan
Actual
25.09.14
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
38 of 221
Description
Unit
23
Nos
Plan/
Actual
Plan
Actual
24
No
Plan
Actual
25
Simulation Testing
LS
25.09.14
_
_
_
_
#
#
26
Nos
Plan
Actual
27
LOT
Plan
Actual
28
LOT
Plan
Actual
29
LOT
Plan
Actual
30
Nos
Plan
Actual
31
Testing work
Lot
Plan
Actual
_
_
_
_
_
_
_
_
_
_
_
_
39 of 221
Description
Unit
Commissioning work
Lot
Plan/
Actual
Plan
25.09.14
_
_
Commissioning AFTER complete ofActual
Tuna Station
40 of 221
Description
Unit
Nos
Nos
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Nos
Nos
Sunday
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
41 of 221
Description
Point machine fixing &
Roading
Unit
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Nos
Sunday
_
_
10
Rmt
25
25
25
8.00
11
KM
0.2
_
0.2
0.2
_
_
12
13
Cable Laying
KM
KM
14
Nos
15
Nos
16
Nos
17
Nos
0.4
0.4
0.4
_
0.2
0.5
0.4
0.3
0.2
0.25
2.7
2.5
2.5
2.5
2.5
2.5
1.5
4.5
42 of 221
3.5
Description
Unit
01.12.14
02.12.14
03.12.14
43 of 221
04.12.14
05.12.14
06.12.14
Sunday
Description
Unit
18
Nos
19
Nos
20
Nos
21
Nos
22
KM
01.12.14
0.5
02.12.14
03.12.14
0.5
1
23
Nos
24
Nos
25
Set
26
Set
04.12.14
44 of 221
05.12.14
06.12.14
Sunday
0.5
1
Description
Unit
27
Nos
28
Nos
29
Nos
30
Lot
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
PPK
_
_
Nos
_
_
Nos
_
_
L.S.
_
_
45 of 221
Description
Unit
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
L.S.
Lot
_
_
Nos
10
_
_
I P S Fixing ,wiring
Nos
_
_
Nos
_
_
10
Nos
11
Nos
_
_
12
Job
_
_
13
L.S.
_
_
46 of 221
Description
Block Instrument fixing &
wiring
Unit
01.12.14
02.12.14
03.12.14
Set
04.12.14
05.12.14
06.12.14
Sunday
_
_
15
Set
_
_
16
Nos
_
_
17
Nos
_
18
L.S.
_
_
19
Nos
_
_
20
Nos
_
_
21
1 to 1 wire testing
Nos
_
22
Set
_
_
47 of 221
Description
Unit
23
Nos
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
_
_
24
No
_
_
25
Simulation Testing
LS
26
Nos
_
_
27
LOT
_
_
28
LOT
_
_
29
LOT
_
_
30
Nos
_
_
31
Testing work
Lot
_
_
48 of 221
Description
Unit
Commissioning work
Lot
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
_
49 of 221
Description
Unit
Nos
Nos
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
_
_
_
1
Nos
_
_
Nos
_
_
Nos
Nos
Nos
_
_
_
_
_
Nos
50 of 221
Description
Point machine fixing &
Roading
Unit
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
Nos
_
10
Rmt
25
25
25
_
_
11
KM
0.2
0.2
0.2
_
_
12
KM
0.4
0.4
0.4
0.2
13
Cable Laying
KM
14
Nos
15
Nos
16
Nos
17
Nos
_
_
2.5
2.5
3.5
2.5
2.5
0.8
51 of 221
2.5
2.5
_
Description
Unit
08.12.14
09.12.14
10.12.14
52 of 221
11.12.14
12.12.14
13.12.14
Sunday
Description
Unit
18
Nos
19
Nos
20
Nos
21
Nos
22
KM
23
Nos
24
Nos
25
Set
26
Set
08.12.14
0.5
09.12.14
10.12.14
0.5
53 of 221
11.12.14
12.12.14
0.5
13.12.14
Sunday
Description
Unit
27
Nos
28
Nos
29
Nos
30
Lot
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
PPK
_
_
Nos
_
_
Nos
_
_
L.S.
_
_
54 of 221
Description
Unit
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
L.S.
Lot
_
_
Nos
10
_
_
I P S Fixing ,wiring
Nos
_
_
Nos
_
_
10
Nos
11
Nos
_
_
12
Job
_
_
13
L.S.
_
_
55 of 221
Description
Block Instrument fixing &
wiring
Unit
08.12.14
09.12.14
10.12.14
Set
11.12.14
12.12.14
13.12.14
Sunday
_
_
15
Set
_
_
16
Nos
_
_
17
Nos
_
18
L.S.
_
_
19
Nos
_
_
20
Nos
_
_
21
1 to 1 wire testing
Nos
_
_
22
Set
_
_
56 of 221
Description
Unit
23
Nos
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
_
_
24
No
_
25
Simulation Testing
LS
26
Nos
_
_
27
LOT
_
_
28
LOT
_
_
29
LOT
_
_
30
Nos
_
_
31
Testing work
Lot
_
_
57 of 221
Description
Unit
Commissioning work
Lot
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
_
58 of 221
Description
Unit
Nos
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
59 of 221
Description
Point machine fixing &
Roading
Unit
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
Nos
_
10
Rmt
25
25
25
4
11
KM
0.2
0.2
0.2
_
_
12
KM
0.4
0.4
0.4
0.15
13
Cable Laying
KM
2.5
_
2.5
2.5
2.5
2.7
4
14
Nos
15
Nos
16
Nos
17
Nos
2.7
_
_
60 of 221
Description
Unit
15.12.14
16.12.14
17.12.14
61 of 221
18.12.14
19.12.14
20.12.14
Sunday
Description
Unit
18
Nos
19
Nos
20
Nos
21
Nos
22
KM
23
Nos
24
Nos
25
Set
26
Set
15.12.14
0.5
16.12.14
17.12.14
0.5
62 of 221
18.12.14
19.12.14
0.5
20.12.14
Sunday
Description
Unit
27
Nos
28
Nos
29
Nos
30
Lot
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
PPK
_
_
Nos
_
_
Nos
10
10
_
_
L.S.
_
_
63 of 221
Description
Unit
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
L.S.
Lot
_
_
Nos
10
_
_
I P S Fixing ,wiring
Nos
_
_
Nos
_
_
10
Nos
11
Nos
_
_
12
Job
_
_
13
L.S.
_
_
64 of 221
Description
Block Instrument fixing &
wiring
Unit
15.12.14
16.12.14
17.12.14
Set
18.12.14
19.12.14
20.12.14
Sunday
_
_
15
Set
_
_
16
Nos
_
_
17
Nos
_
18
L.S.
_
_
19
Nos
_
_
20
Nos
_
_
21
1 to 1 wire testing
Nos
_
_
22
Set
_
_
65 of 221
Description
Unit
23
Nos
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
_
_
24
No
_
_
25
Simulation Testing
LS
26
Nos
_
_
27
LOT
_
_
28
LOT
_
_
29
LOT
_
_
30
Nos
_
_
31
Testing work
Lot
_
_
66 of 221
Description
Unit
Commissioning work
Lot
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
_
67 of 221
Description
Unit
Nos
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
_
_
Nos
68 of 221
Description
Point machine fixing &
Roading
Unit
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
Nos
_
10
Rmt
25
25
25
_
_
11
KM
0.2
0.2
0.2
_
_
12
KM
0.4
0.4
0.4
_
_
13
Cable Laying
KM
2.7
2.7
2.7
2.7
2.7
2.7
_
14
15
Nos
_
_
Nos
_
_
16
Nos
_
_
17
Nos
69 of 221
Description
Unit
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
_
70 of 221
Description
TLD fixing & Cable
termination
Unit
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
Nos
27.12.14
Sunday
_
_
19
Nos
_
_
20
Nos
_
_
21
Nos
22
KM
0.5
0.5
0.5
_
23
Nos
_
_
24
Nos
_
_
25
Set
_
_
26
Set
71 of 221
Description
Unit
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
_
27
Nos
_
28
Nos
_
_
29
30
Nos
_
_
Lot
_
PPK
_
_
Nos
_
_
Nos
10
10
_
_
L.S.
_
_
72 of 221
Description
Unit
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
L.S.
Lot
_
_
Nos
10
_
_
I P S Fixing ,wiring
Nos
_
_
Nos
_
_
10
Nos
11
Nos
_
_
12
Job
_
_
13
L.S.
_
_
73 of 221
Description
Block Instrument fixing &
wiring
Unit
22.12.14
23.12.14
24.12.14
Set
25.12.14
26.12.14
27.12.14
Sunday
_
_
15
Set
_
_
16
Nos
_
_
17
Nos
_
18
L.S.
_
_
19
Nos
_
_
20
Nos
_
_
21
1 to 1 wire testing
Nos
_
_
22
Set
_
_
74 of 221
Description
Unit
23
Nos
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
_
_
24
No
_
_
25
Simulation Testing
LS
26
Nos
_
_
27
LOT
_
_
28
LOT
_
_
29
LOT
_
_
30
Nos
_
_
31
Testing work
Lot
_
_
75 of 221
Description
Unit
Commissioning work
Lot
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
_
76 of 221
Description
Unit
29.12.14
30.12.14
31.12.14
Nos
Plan Dec'14
ActualDec'14
23
5
Nos
19
6
Nos
0
1
Nos
8
0
Nos
24
6
Nos
21
4
Nos
5
0
Nos
16
0
77 of 221
Description
Point machine fixing &
Roading
Unit
29.12.14
30.12.14
31.12.14
Nos
Plan Dec'14
ActualDec'14
0
0
10
Rmt
25
25
350
12
11
KM
0.2
0.2
2.8
0
12
KM
0.4
5.2
2.2
13
Cable Laying
KM
2.7
2.7
2.8
70
24.8
14
15
Nos
20
0
Nos
0
0
16
Nos
0
0
17
Nos
78 of 221
Description
Unit
29.12.14
30.12.14
31.12.14
Plan Dec'14
ActualDec'14
0
79 of 221
Description
TLD fixing & Cable
termination
Unit
29.12.14
30.12.14
31.12.14
Nos
Plan Dec'14
ActualDec'14
0
0
19
Nos
0
0
20
Nos
0
0
21
Nos
0
0
22
KM
0.5
0.5
7.0
3.00
23
Nos
0
0
24
Nos
0
0
25
Set
0
0
26
Set
80 of 221
Description
Unit
29.12.14
30.12.14
31.12.14
Plan Dec'14
ActualDec'14
0
27
Nos
0
0
28
Nos
0
0
29
30
Nos
0
0
Lot
0
0
0
PPK
0
0
Nos
0
0
Nos
40
0
L.S.
0
0
81 of 221
Description
Fuse and bas Bar Power
wiring to CTR
Unit
29.12.14
30.12.14
31.12.14
L.S.
Plan Dec'14
ActualDec'14
0
0
Lot
0
0
Nos
10
50
0
I P S Fixing ,wiring
Nos
0
0
Nos
0
0
10
Nos
0
0
11
Nos
0
0
12
Job
0
0
13
L.S.
0
0
82 of 221
Description
Block Instrument fixing &
wiring
Unit
29.12.14
30.12.14
31.12.14
Set
Plan Dec'14
ActualDec'14
0
0
15
Set
0
0
16
Nos
0
0
17
Nos
0
0
18
L.S.
1
0
19
Nos
0
0
20
Nos
0
0
21
1 to 1 wire testing
Nos
0
0
22
Set
0
0
83 of 221
Description
Unit
23
Nos
29.12.14
30.12.14
31.12.14
Plan Dec'14
ActualDec'14
0
0
24
No
0
0
25
Simulation Testing
LS
0
0
26
Nos
0
0
27
LOT
1
0
28
LOT
1
0
29
LOT
1
0
30
Nos
1
0
31
Testing work
Lot
1
0
84 of 221
Description
Unit
Commissioning work
Lot
29.12.14
30.12.14
31.12.14
1
Plan Dec'14
ActualDec'14
1
0
85 of 221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
RELAY RACK
Nos
15
25.8.14
01.09.14
15
15
100%
Nos
25.8.14
01.09.14
100%
Nos
150
15.09.14
20.09.14
150
150
100%
Nos
15
15.09.14
20.09.14
15
15
100%
Nos
8500
05.10.14
10.10.14
8500
8500
100%
Point Group
Nos
11
28.10.14
10.11.14
11
11
100%
Nos
01.12.14
31.12.14
0%
Nos
01.12.14
31.12.14
0%
Nos
12
01.12.14
31.12.14
0%
10
Route Group
Nos
10
01.12.14
31.12.14
0%
11
Chain Group
Nos
01.12.14
31.12.14
0%
12
Nos
400
01.12.14
30.11.14
400
375
94%
25
86of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
13
Nos
120
28.10.14
10.11.14
120
120
100%
14
Nos
10
28.10.14
10.11.14
10
10
100%
15
Nos
15
20.09.14
25.09.14
15
15
100%
16
Nos
28.10.14
10.11.14
100%
17
Nos
01.12.14
31.12.14
0%
18
Nos
01.12.14
31.12.14
0%
87of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
19
Nos
01.12.14
31.12.14
0%
20
km
0.2
01.12.14
31.12.14
0%
21
km
01.10.14
10.10.14
0.982
98%
22
km
01.12.14
31.12.14
0%
23
km
01.10.14
10.10.14
2.964
99%
24
km
01.10.14
10.10.14
4.964
99%
25
km
10
01.10.14
10.10.14
10
9.997
100%
26
km
09.09.14
18.09.14
2.975
99%
27
km
09.09.14
18.09.14
100%
28
km
01.10.14
10.10.14
5.994
100%
29
km
01.12.14
31.12.14
0%
30
km
45
01.12.14
31.12.14
0%
88of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
31
LSM
01.12.14
31.12.14
0%
32
Nos
01.01.15
15.01.15
0%
33
Nos
15.12.14
31.12.14
0%
34
Nos
15.12.14
31.12.14
0%
35
Nos
09.09.14
15.09.14
100%
36
Nos
200
05.09.14
10.09.14
200
200
100%
37
Nos
70
05.09.14
10.09.14
70
70
100%
38
Nos
05.09.14
10.09.14
100%
39
KM
5.085
01.10.14
15.10.14
98%
40
KM
8.117
01.10.14
15.10.14
99%
41
KM
43.352
01.10.14
15.10.14
43
43
99%
42
KM
23.194
01.10.14
15.10.14
23
23
99%
43
KM
16.5
01.10.14
15.10.14
16.5
16.5
100%
89of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
45
DWC pipe
mtr
500
01.10.14
15.10.14
500
498
100%
46
Nos
10.09.14
15.09.14
100%
47
Nos
10.09.14
15.09.14
100%
48
Calling/on Signal
Nos
10.09.14
15.09.14
100%
49
Nos
10.09.14
15.09.14
100%
50
Nos
10.09.14
15.09.14
100%
51
Nos
10.09.14
15.09.14
100%
52
Nos
16
10.09.14
15.09.14
16
16
100%
53
Nos
10.09.14
15.09.14
100%
54
Nos
30
10.09.14
15.09.14
30
30
100%
55
Nos
11.12.14
15.12.14
100%
56
Nos
11.12.14
15.12.14
100%
90of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
57
Nos
11.12.14
15.12.14
58
Nos
50
1.11.14
59
Nos
60
Nos
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
100%
10.11.14
50
50
100%
1.11.14
10.11.14
100%
1.11.14
10.11.14
100%
91of221
15-Dec-14
Revised Plan Dates
Sr. No
61
62
63
64
65
66
67
68
69
70
71
72
73
Description
Supply of Track feed battery charger
110V AC/2-6 V DC - 3 amp charging
rate suitable to charge 1,2 or 3 cells
of 80 AH, to IRS-S-89/93 amndt-2 or
latest.
Supply of adjustable Track Feed
Resistance (Disc type) 30 ohms as
per RDSO Drg. No. SA 20166/M
(Adv) with latest amendments (with
Phenolic moulded base).
Supply of Lead acid low
maintenance secondary cells of 80
Supply
of Track
Juction Boxes
AH as per
RDSOLead
specification
as
per Drg. No.RST-C-11509 or
No.IRS-S-88/93.
latest, made of fibre glass along
with one way terminal blocks, fixing
angles, pipe etc.Channel bond pin
Supply of Relay DC track plug in
single groove. tinned or zinc coated
type neutral, 9 ohms, tractive
7mm dia.& G.I.Bond wire to be
armature 2 F/1B with front contracts
supplied by contractor under
metal to carbon (QTA 2 type)
execution item.
complete with plug board, retaining
clip and connector to BRS-939A, and
BRS-966(appendix F-2), IRS-S-34/68
& IRS-S-23/86. Interlocking code
Supply of QSPA1 Relays with base
F,G,H,K,X.
and clips complete as per RDSO
Supply of Electrical point machine
specifications.
heavy duty nontrailable rotary
locking type complete with cable
terminalofbox
as machine
per IRS-S-24/2002
Supply
Point
ground
with Amendment-1
or latest,for
connection
for universal
IRS type
ordinary
switches
with throw
of 143
point
machine
complete
(5 rods)
as
mm.drg
Machines
operate
on 110 V
per
no. (I) SA
8805 (II)
DC.
RDSO/S/3273
(III) RDSO/S/3271 (IV)
RDSO/S/3267 (V) RDSO/S/3269,
switch extension bracket
RDSO/S/3264 & drive lug S 8806.
Supply
of Location
box
- FULLfor
as
[Including
insulation
material
per
Drg.No.W.Rly/SW/47/68SWS/GKC
other accessories of point machine
SINGLE
complete
with `E' type lock
and gauge
type plate]
& keys , 1key for every five appratus
cases to be supplied.
Supply of Location box - HALF as
per Drg.No.W.Rly/SW/47/68SWS/GKC
HALF complete with `E' type lock &
keys , 1key for every five appratus
cases to be supplied.
Supply of Fuse block PBT base with
ND FUSE 2AMP,10AMP & 16AMP as
per drawing no. SA-23748, ALT, 4
and IRS:S-75/2006 (REV-2) or latest.
Supply of ARA Terminal blocks made
of PBT as per Drg.No.SA- 23741 Alt.6
& Specn No.IRS/S-75/2006 (Rev.2 or
with latest amendments with
disconnecting links as per drg no.
Supply
of push button type single
RST/11336.
line block instrument with UFSBI
(without SSDAC) as per Railway
standard IRS:S/104 /2011 (1 Sets
each 2 nos Block System) With
Block Table as per requirement.
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
Nos
20
25.10.14
31.10.14
20
20
100%
Nos
20
10.09.14
15.09.14
20
20
100%
Nos
40
1.11.14
10.11.14
40
40
100%
Nos
50
10.09.14
15.09.14
50
50
100%
Nos
20
10.09.14
15.09.14
20
20
100%
Nos
20
10.09.14
15.09.14
20
20
100%
Nos
18
10.09.14
15.01.15
15
15
83%
Nos
18
10.09.14
15.01.15
15
15
83%
Nos
40
10.09.14
15.09.14
40
40
100%
Nos
30
10.09.14
15.09.14
30
30
100%
Nos
200
10.10.14
25.10.14
200
200
100%
Nos
0%
Set
15.09.14
25.09.14
100%
92of221
15-Dec-14
Revised Plan Dates
Sr. No
74
75
76
77
78
79
80
81
Description
Supply of Multi Section Digital Axle
Counter for 6 track circuits with
Supply of Single Section Digital
complete 10 detection points as per
Axlecounter as per
RDSO Specification (M/S Siemens
RDSOSpecification
make) complete with standard Tool
No.RDSO/SPN/177/2003 (Ver.1)with
Kit with each set. Equipments
Amendment-2 & Manufacturer's
complete with associated
specification.(M/S Eldyne make)
equipments and Fixtures.
complete with standard Tool Kit with
each set.and (a)High frequency Tx
and Rx coils=2 sets(each set
Supply of 8-Way Terminal Block
consists of web mounting type 02
made
of of
PBT(isolating
type) Office
as per
Supply
Station
Manager
nos.Tx and
2 nos.Rx
coils.) with
Spec.
No.
IRS/S-79/92
Amndt.Furniture
Fixtures. (b) Track side Digital Axle
1andDRG No:SA 24811 (Alt 2) with
Counter Equipments complete with
latest amendment
or ofChair
latestofRDSO
A) Office
associated
equipments
and Fixtures.
Supply
of
Fire
Alarm
System
specification
continuous arms having cushened
control
com
indication
panel
seats and rest T.W. Arm rest size 36"
equipped
4 zone
cards
together
x 21" x 22with
approx
steel
tubular
with
electronic
hooter
and
all
other
frame gauge of the pipes 25mm
dia
acceccories.
x 18 gauge with olive green colours,
Green stove enamelled "Indian
Supply
Fire Alarm System
smoke
Make". of
Godrej/Jalaram
Make.-=
4
detectoroptical
Apollo
make
nos
B) Office Table
of size of table top 1220 mm x
610mm height 750mm with
laminated top with 3 drawers on the
Fire Extingusher
left hand side and one locker on the
right hand side olive brown
withDuplicate keys. Olive green
colour Godrej Make. = 2 nos
C) Plain storage almirah with 4
adjustable shelves size 1980mm
height, 915mm width, 485mm
Supply
of MS Termination
Box with
depth, Godrej
Make. = 1nos
fitting for Point Machine(ME34)
D) Airy
Revolving and tilting working
cushioned adjustable height chair
with arm rests, polished black.The
chair has plastic caned seat and
back on 25 mmround tubular frame.
The base is of pressedsheet metal.
Godrej/ Allwyn/ Chandan/ Khira
make.Width 700 mm,Depth 700
mm, Height 870 mm, Adjustable
seat height 410 mm to 520 mm,
Colour Grey. = 1 nos
E) Maintenance
stool for Relay room & Battery room
Unit
Actual Dates
PLAN
ACTUAL
% Complete
Backlog
100%
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
Cummulative
Set
15.12.14
20.12.14
Set
10.10.14
30.10.14
100%
Nos
0%
Nos
25.10.14
30.10.14
100%
Nos
12
25.10.14
30.10.14
12
12
100%
Nos
01.01.15
10.01.15
0%
Set
01.01.15
15.01.15
0%
Nos
18
15.12.14
25.12.14
0%
93of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
82
Nos
83
84
85
86
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Start
Finish
Cummulative
200
25.10.14
30.10.14
200
200
100%
Nos
600
25.10.14
30.10.14
600
600
100%
Nos
20
25.10.14
30.10.14
20
20
100%
Nos
21
10.11.14
20.11.14
21
21
100%
LSM
15.12.14
31.12.14
0%
87
set
15.12.14
31.12.14
0%
88
set
15.12.14
15.01.15
0%
89
Nos
10.09.14
30.09.14
100%
90
Nos
27
10.09.14
15.09.14
27
27
100%
91
Nos
10.12.14
20.12.14
100%
92
Nos
25.10.14
30.10.14
100%
93
km
18.28
20.11.14
25.12.14
10
10
55%
94
10 pairPIJF cable
mtr
500
25.11.14
25.12.14
0%
94of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
95
20 pairPIJF cable
mtr
500
25.11.14
25.12.14
0%
96
mtr
500
25.11.14
25.12.14
0%
97
mtr
500
25.11.14
31.12.14
0%
98
VF transfer (470:11200
Nos
20
25.10.14
30.10.14
20
20
100%
99
Nos
10.09.14
15.09.14
100%
100
Nos
10.09.14
15.09.14
100%
101
Nos
10.09.14
15.09.14
100%
102
Nos
10
25.10.14
30.10.14
10
10
100%
103
Nos
30
25.10.14
30.10.14
30
30
100%
104
Nos
10
25.10.14
30.10.14
10
10
100%
105
Nos
25.10.14
30.10.14
100%
106
Nos
10
25.10.14
30.10.14
10
10
100%
95of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
107
Nos
25.10.14
30.10.14
100%
108
Nos
25.10.14
30.10.14
100%
109
Nos
150
01.12.14
15.12.14
150
150
100%
110
5 watt VHF
Nos
15.12.14
15.01.15
0%
111
Nos
15.12.14
15.01.15
0%
112
Earth electrode
Nos
15.12.14
15.01.15
0%
113
mtr
50
10.9.14
20.10.14
50
50
100%
114
VSET equipment
Nos
115
FOIS equipment
Nos
116
Nos
11.12.14
15.12.14
100%
117
OFC 24 fiber
Km
8.948
1.10.14
15.10.14
8.948
8.948
100%
118
FDMS
Nos
11.12.14
15.12.14
100%
150
96of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
119
Nos
15.12.14
15.01.15
0%
120
Nos
15.12.14
15.01.15
0%
121
Nos
15.12.14
15.01.15
0%
122
Nos
15.12.14
15.01.15
0%
123
Nos
10.11.14
20.11.14
100%
97of221
15-Dec-14
Revised Plan Dates
Sr. No
Description
Unit
Actual Dates
PLAN
ACTUAL
Total Scope
Start
Finish
Start
Finish
Today
Cummulative
Today
% Complete
Backlog
Cummulative
124
KM
10
1.10.14
10.10.14
10
10
100%
125
Nos
10.10.10
20.10.14
100%
126
Nos
10.10.10
20.10.14
100%
127
Nos
10.10.14
20.10.14
100%
128
Nos
10.10.14
20.10.14
100%
129
Nos
20
15.12.14
15.01.15
0%
130
Set
10.10.14
20.11.14
100%
131
Nos
10.10.14
20.10.14
100%
132
Nos
50
15.12.14
15.01.15
0%
133
Nos
10.10.14
20.10.14
100%
134
Nos
01.01.15
15.01.15
0%
98of221
Plan
Next day
Remarks
(manpower, weather,
issues)
99of221
Plan
Next day
Remarks
(manpower, weather,
issues)
100of221
Plan
Next day
Remarks
(manpower, weather,
issues)
101of221
Plan
Next day
Remarks
(manpower, weather,
issues)
102of221
Plan
Next day
Remarks
(manpower, weather,
issues)
Material recd. On
12/12/14
103of221
Plan
Next day
Material recd. On
Remarks
12/12/14
(manpower, weather,
issues)
104of221
Plan
Next day
Remarks
(manpower, weather,
issues)
Item Deleated
105of221
Plan
Next day
Remarks
(manpower, weather,
issues)
Item Deleated
106of221
Plan
Next day
Remarks
(manpower, weather,
issues)
107of221
Plan
Next day
Remarks
(manpower, weather,
issues)
108of221
Plan
Next day
Remarks
(manpower, weather,
issues)
Material recd. On
12/12/14
Material recd. On
12/12/14
Material recd. On
12/12/14
109of221
Plan
Next day
Remarks
(manpower, weather,
issues)
110of221
Plan
Next day
Remarks
(manpower, weather,
issues)
111of221
Month: Decmber'14
Revised Plan Dates
Sr.No.
1
Discription
RELAY RACK
Unit
QTY
Start
Finish
Nos
15
25.8.14
01.09.14
Plan/
Actual
Planned
Actual
Nos
25.8.14
01.09.14
Planned
Actual
Nos
150
15.09.14
20.09.14
Planned
Actual
Nos
15
15.09.14
20.09.14
Planned
Actual
Nos
8500
05.10.14
10.10.14
Planned
Actual
Point Group
Nos
11
28.10.14
10.11.14
Planned
Actual
Nos
01.12.14
31.12.14
Planned
Actual
Nos
01.12.14
31.12.14
Planned
Actual
Nos
12
01.12.14
31.12.14
Planned
Actual
10
Route Group
Nos
10
01.12.14
31.12.14
Planned
Actual
11
Chain Group
Nos
01.12.14
31.12.14
Planned
Actual
12
Nos
400
01.12.14
30.11.14
Planned
Actual
13
Nos
120
28.10.14
10.11.14
Planned
Sr.No.
Discription
Unit
QTY
Start
Finish
Actual
14
Nos
10
28.10.14
10.11.14
Planned
Actual
15
Nos
15
20.09.14
25.09.14
Planned
Actual
16
Nos
28.10.14
10.11.14
Planned
Actual
17
Nos
01.12.14
31.12.14
Planned
Actual
18
Nos
01.12.14
31.12.14
Planned
Actual
19
Nos
01.12.14
31.12.14
Planned
Actual
20
km
0.2
01.12.14
31.12.14
Planned
Actual
21
km
01.10.14
10.10.14
Planned
Actual
22
km
01.12.14
31.12.14
Planned
Actual
23
km
01.10.14
10.10.14
Planned
Actual
24
km
01.10.14
10.10.14
Planned
Actual
25
km
10
01.10.14
10.10.14
Planned
Actual
26
km
09.09.14
18.09.14
Planned
Actual
Sr.No.
Discription
Unit
QTY
Start
Finish
27
km
09.09.14
18.09.14
Planned
Actual
28
km
01.10.14
10.10.14
Planned
Actual
29
30
km
LSM
31
km
01.12.14
31.12.14
Planned
Actual
45
01.12.14
31.12.14
Planned
Actual
01.12.14
31.12.14
Planned
Actual
32
Nos
01.01.15
15.01.15
Planned
Actual
33
Nos
15.12.14
31.12.14
Planned
Actual
34
Nos
15.12.14
31.12.14
Planned
Actual
35
Nos
09.09.14
15.09.14
Planned
Actual
36
Nos
200
05.09.14
10.09.14
Planned
Actual
37
Nos
70
05.09.14
10.09.14
Planned
Actual
38
Nos
05.09.14
10.09.14
Planned
Actual
39
KM
5.085
01.10.14
15.10.14
Planned
Actual
40
KM
8.117
01.10.14
15.10.14
Planned
Actual
Sr.No.
41
Discription
12 core x 1.5 sq.mm.
Unit
QTY
Start
Finish
KM
43.352
01.10.14
15.10.14
Planned
Actual
42
KM
23.194
01.10.14
15.10.14
Planned
Actual
43
KM
16.5
01.10.14
15.10.14
Planned
Actual
45
DWC pipe
mtr
500
01.10.14
15.10.14
Planned
Actual
46
Nos
10.09.14
15.09.14
Planned
Actual
47
Nos
10.09.14
15.09.14
Planned
Actual
48
Calling/on Signal
49
Nos
Nos
50
Nos
10.09.14
15.09.14
Planned
Actual
10.09.14
15.09.14
Planned
Actual
10.09.14
15.09.14
Planned
Actual
51
Nos
10.09.14
15.09.14
Planned
Actual
52
53
54
Nos
16
10.09.14
15.09.14
Planned
Actual
Nos
10.09.14
15.09.14
Planned
Actual
Nos
30
10.09.14
15.09.14
Planned
Actual
55
Nos
11.12.14
15.12.14
Planned
Actual
56
Nos
11.12.14
15.12.14
Planned
Sr.No.
Discription
Unit
QTY
Start
Finish
Actual
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Nos
11.12.14
15.12.14
Planned
Actual
Nos
50
1.11.14
10.11.14
Planned
Actual
Nos
1.11.14
10.11.14
Planned
Actual
Nos
1.11.14
10.11.14
Planned
Actual
Nos
20
25.10.14
31.10.14
Planned
Actual
Nos
20
10.09.14
15.09.14
Planned
Actual
Nos
40
1.11.14
10.11.14
Planned
Actual
Nos
50
10.09.14
15.09.14
Planned
Actual
Nos
20
10.09.14
15.09.14
Planned
Actual
Nos
20
10.09.14
15.09.14
Planned
Actual
Nos
18
10.09.14
15.01.15
Planned
Actual
Nos
18
10.09.14
15.01.15
Planned
Actual
Nos
40
10.09.14
15.09.14
Planned
Actual
Nos
30
10.09.14
15.09.14
Planned
Sr.No.
71
72
73
74
75
76
77
78
79
80
81
82
83
84
Discription
No.RDSO/SPN/177/2003
Siemens make) complete with
(Ver.1)with
Amendment-2
standard Tool
Kit with each&set.
Manufacturer's
specification.(M/S
Equipments complete
with
Eldyne
make)
complete and
with
associated
equipments
standard
Fixtures. Tool Kit with each
set.and (a)High frequency Tx and
Rx coils=2 sets(each set consists
Supply
of 8-Way Terminal
Block
of web mounting
02 nos.Tx
Supply
of Stationtype
Manager
Office
made
of
PBT(isolating
type)
as per
and 2 nos.Rx coils.) with Fixtures.
Furniture
Spec.
No.
IRS/S-79/92
Amndt.(b) Track side Digital Axle Counter
1andDRG
No:SA
24811with
(Alt 2) with
Equipments
complete
A) Office Chair
latest
amendment
or
of
latest
associated
equipments
and
of
continuous
arms having
RDSO
specification
Supply
of
Fire
Alarm
System
Fixtures. seats and rest T.W.- Arm
cushened
control
rest sizecom
36"indication
x 21" x 22panel
approx
equipped
with
4 zone
cardsof the
steel tubular frame
gauge
together
withdia
electronic
hooter
pipes 25mm
x 18 gauge
with
and
all
other
acceccories.
olive green colours, Green stove
enamelled
"Indian
Make".
Supply of Fire
Alarm
System Godrej/Jalaram
Make. =Apollo
4 nos
smoke detectoroptical
B) Office Table of size
make
of table top 1220 mm x 610mm
height 750mm with laminated top
with 3 drawers on the left hand
Fire Extingusher
side
and one locker on the right
hand side olive brown
withDuplicate keys. Olive green
colour Godrej Make. = 2 nos
C) Plain storage almirah with
4 adjustable shelves size 1980mm
height, 915mm width, 485mm
depth, Godrej
Make. = 1nos
Supply
of MS Termination
Box
with fitting for Point
D) Airy
Machine(ME34)
Revolving and tilting working
cushioned adjustable height chair
Supply
Indication
fuseblack.The
G-type
with
armofrests,
polished
0.6
Amps(system
engineer
chair
has plastic caned
seatMake)
and
with
insert
back fuse
on 25
mmround tubular
frame. The base is of
pressedsheet
metal.fuse
Godrej/
Supply of Indication
G-type
Allwyn/
Chandan/
Khira
1.6 Amps(system engineer Make)
make.Width
700 mm,Depth 700
with fuse insert
mm, Height 870 mm, Adjustable
seat height 410 mm to 520 mm,
Colour Grey. = 1 nos
Supply of D-type fuse with fuse
E) Maintenance
insert 6 Amps
stool for Relay room & Battery
room
Unit
QTY
Start
Finish
Actual
Nos
200
10.10.14
25.10.14
Planned
Actual
Nos
Planned
Actual
Set
15.09.14
25.09.14
Planned
Actual
Set
15.12.14
20.12.14
Planned
Actual
Set
10.10.14
30.10.14
Planned
Actual
Nos
Planned
Actual
Nos
25.10.14
30.10.14
Planned
Actual
Nos
12
25.10.14
30.10.14
Nos
01.01.15
10.01.15
Planned
Actual
Set
01.01.15
15.01.15
Planned
Actual
Nos
18
15.12.14
25.12.14
Planned
Actual
Nos
200
25.10.14
30.10.14
Planned
Actual
Nos
600
25.10.14
30.10.14
Planned
Actual
Nos
20
25.10.14
30.10.14
Planned
Unit
QTY
Start
Finish
Actual
Nos
21
10.11.14
20.11.14
Planned
Actual
LSM
15.12.14
31.12.14
Planned
Actual
set
15.12.14
31.12.14
Planned
Actual
88
set
15.12.14
15.01.15
Planned
Actual
89
Nos
10.09.14
30.09.14
Planned
Actual
90
Nos
27
10.09.14
15.09.14
Planned
Actual
91
Nos
10.12.14
20.12.14
Planned
Actual
92
Nos
25.10.14
30.10.14
Planned
Actual
93
km
18.28
20.11.14
25.12.14
Planned
Actual
94
10 pairPIJF cable
mtr
500
25.11.14
25.12.14
Planned
Actual
95
20 pairPIJF cable
mtr
500
25.11.14
25.12.14
Planned
Actual
96
mtr
500
25.11.14
25.12.14
Planned
Actual
97
mtr
500
25.11.14
31.12.14
Planned
Actual
98
VF transfer (470:11200
Nos
20
25.10.14
30.10.14
Planned
Actual
Sr.No.
99
Discription
Unit
QTY
Start
Finish
Nos
10.09.14
15.09.14
Planned
Actual
100
Nos
10.09.14
15.09.14
Planned
Actual
101
Nos
10.09.14
15.09.14
Planned
Actual
102
Nos
10
25.10.14
30.10.14
Planned
Actual
103
Nos
30
25.10.14
30.10.14
Planned
Actual
104
Nos
10
25.10.14
30.10.14
Planned
Actual
105
Nos
25.10.14
30.10.14
Planned
Actual
106
Nos
10
25.10.14
30.10.14
Planned
Actual
107
Nos
25.10.14
30.10.14
108
Nos
25.10.14
30.10.14
Planned
Actual
109
Nos
150
01.12.14
15.12.14
Planned
Actual
110
5 watt VHF
Nos
15.12.14
15.01.15
Planned
Actual
111
Nos
15.12.14
15.01.15
Planned
Actual
112
Earth electrode
Nos
15.12.14
15.01.15
Planned
Actual
113
mtr
50
10.9.14
20.10.14
Planned
Sr.No.
Discription
Unit
QTY
Start
Finish
Actual
114
VSET equipment
Nos
Planned
Actual
115
FOIS equipment
Nos
Planned
Actual
116
Nos
11.12.14
15.12.14
Planned
Actual
117
OFC 24 fiber
Km
8.948
1.10.14
15.10.14
Planned
Actual
118
FDMS
Nos
11.12.14
15.12.14
Planned
Actual
119
Nos
15.12.14
15.01.15
Planned
Actual
120
Nos
15.12.14
15.01.15
Planned
Actual
121
Nos
15.12.14
15.01.15
Planned
Actual
122
Nos
15.12.14
15.01.15
Planned
Actual
123
Nos
10.11.14
20.11.14
Planned
Actual
124
KM
10
1.10.14
10.10.14
Planned
Actual
125
Nos
10.10.10
20.10.14
Planned
Actual
126
Nos
10.10.10
20.10.14
Planned
Actual
127
Nos
10.10.14
20.10.14
Planned
Actual
Sr.No.
128
Discription
2x24fiber optic fiber splice SJC
Unit
QTY
Start
Finish
Nos
10.10.14
20.10.14
Planned
Actual
129
Nos
20
15.12.14
15.01.15
Planned
Actual
130
Set
10.10.14
20.11.14
Planned
Actual
131
Nos
10.10.14
20.10.14
Planned
Actual
132
Nos
50
15.12.14
15.01.15
Planned
Actual
133
Nos
10.10.14
20.10.14
Planned
Actual
134
Nos
01.01.15
15.01.15
Planned
Actual
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
15
15
150
150
15
15
4200
4300
8500
11
12
10
100
275
25
375
40
80
PLAN- Up to
date
15
15
2
2
150
150
15
15
8500
8500
11
11
2
0
3
0
12
0
10
0
2
0
400
375
120
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
120
10
15
15
0.2
0.982
2.964
4.964
10
9.997
2.975
PLAN- Up to
date
10
10
15
15
3
3
8
0
2
0
2
0
0.2
0
1
0.982
2
0
3
2.964
5
4.964
10
9.997
3
2.975
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
5.994
45
200
200
70
70
5.085
8.117
PLAN- Up to
date
3
3
6
5.994
2
0
45
0
1
0
1
0
1
0
1
0
1
1
200
200
70
70
5
5
5
5.085
8
8.117
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
43
43.352
23
23.194
16.5
16.454
500
498
16
16
30
30
PLAN- Up to
date
43
43.352
23
23.194
16.5
16.454
500
498
3
3
1
1
1
1
2
2
1
1
1
1
16
16
2
2
30
30
5
5
6
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
50
50
20
20
20
20
40
40
50
50
20
20
20
20
15
15
15
15
40
40
30
PLAN- Up to
date
3
3
50
50
2
2
7
7
20
20
20
20
40
40
50
50
20
20
20
20
18
15
18
15
40
40
30
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
30
200
200
12
12
18
200
200
600
600
20
PLAN- Up to
date
200
200
0
0
1
1
1
1
1
1
0
0
1
1
12
12
4
0
1
0
18
0
200
200
600
600
20
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
20
21
21
27
27
10
8.28
10
500
500
500
500
20
20
PLAN- Up to
date
21
21
1
0
1
0
1
0
7
7
27
27
1
1
1
1
18.28
10
500
0
500
0
500
0
500
0
20
20
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
10
10
30
30
10
10
10
10
150
150
50
PLAN- Up to
date
5
5
2
2
2
2
10
10
30
30
10
10
4
4
10
10
8
8
1
1
150
150
5
0
2
0
2
0
50
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
50
8.948
8.948
10
10
PLAN- Up to
date
0
0
0
0
1
1
8.948
8.948
2
2
2
0
8
0
2
0
2
0
2
2
10
10
2
2
2
2
4
4
Sept'14
Octo'14
Nov'14
Dec'14
Jan'15
20
50
PLAN- Up to
date
4
4
20
0
2
2
2
2
50
0
2
2
1
0
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
01.12.14
02.12.14
03.12.14
04.12.14
05.12.14
06.12.14
Sunday
08.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
5
5
6
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
6
3
3
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
150
150
16.12.14
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
1
1
2
2
09.12.14
10.12.14
11.12.14
12.12.14
13.12.14
Sunday
15.12.14
16.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
17.12.14
18.12.14
19.12.14
20.12.14
Sunday
22.12.14
23.12.14
24.12.14
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
0
12
12
10
10
25
25
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
0.2
0.2
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
45
45
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
0
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
18
18
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
8.28
8.28
500
500
500
500
500
500
500
500
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
150
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
25.12.14
26.12.14
27.12.14
Sunday
29.12.14
30.12.14
31.12.14
Plan - Dec'14
0
ActualDec'14
01.01.15
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
0
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
6
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
0
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
0
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
150
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
0
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
ActualDec'14
01.01.15
02.01.15
03.01.15
Sunday
05.01.15
06.01.15
07.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
08.01.15
09.01.15
10.01.15
Sunday
12.01.15
13.01.15
14.01.15
15.01.15
20
50
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
16.01.15
17.01.15
Sunday
19.01.15
20.01.15
21.01.15
22.01.15
23.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
24.01.15
Sunday
26.01.15
27.01.15
28.01.15
29.01.15
30.01.15
31.01.15
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
0
3
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
1
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
0
2
0
2
0
0
Plan - Jan'15
ActualJan'15
0
0
0
0
0
1
0
0
0
2
0
2
0
8
0
2
0
2
0
0
0
0
0
0
0
0
0
0
0
Plan - Jan'15
ActualJan'15
0
0
20
0
0
0
0
0
50
0
0
0
1
0