Daily Progress Report - Execution work for S & T - Tuna

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.
Month: December

15-Dec-14

Revised Plan Dates


Sr. No

Description

***

S & T work - AKBTPL

Outdoor - S & T work

Signal - Full Location Box


Foundation

Half Location Box Foundation

Colour Light Signal


-Foundation

Shunt Signal Foundation


Signal - Full Location Box Erection with wiring
Half Location Box - Erection
with wiring

Colour Light Signal -Erection

Shunt Signal Erection

Unit

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Point machine fixing & Roading

10

Trenching (1.20 x 0.300) with


DWC/RCC Pipe in All type
Crossing

Rmt

11

Trenching (1.00 x 0.300) under


Track with Bricks

KM

12

Trenching (1.20 x 0.300) with


Bricks

13

14

15

Cable Laying
Location Box inside All fitting
ARA & Fuse etc
Main Cable Termination &
Testing - C T Rack & All
location

16

Tail Cable Termination &


Testing

17

TFTR Wiring -fixing & Cable


termination

18

TLD fixing & Cable termination

KM

KM

Nos

Nos

Nos

Nos

Nos

Actual Dates

PLAN

Plan

ACTUAL

Total Scope

40

30

16

40

30

16

18

500

110

40

92

90

20

50

% Complete
Start

Finish

11.09.14

15.02.15

Start

11.09.14

25.12.14

12/30/1899

11.09.14

25.12.14

12/30/1899

11.09.14

30.09.14

12/30/1899

11.09.14

25.12.14

12/30/1899

01.10.14

31.12.14

12/30/1899

01.10.14

31.12.14

12/30/1899

01.12.14

31.12.14

12/30/1899

01.12.14

31.12.14

12/30/1899

Finish

Today

Cummulative

30

Today

22

24

16

55%

53%

13

28

22

100%

16

13

50%

01.01.15

15.01.15

12/30/1899

25.11.14

10.01.15

12/30/1899

01.12.14

10.01.15

12/30/1899

01.12.14

10.01.15

12/30/1899

27.11.14

15.01.15

12/30/1899

15.12.14

15.01.15

12/30/1899

25

225

12.00

55%

1.4

0.00

0.00

2.4

0.150

3.72

43%

38.7

4.0

24.80

3
-

0%

3
-

0%

7
-

0%

2%

213
-

0%

1
-

53%

0.00
2.5

6
-

0.00
0.2

5
-

0
1

0
1

8
-

0
1

8
-

0
5

23%

14

01.01.15

31.01.15

12/30/1899

01.01.15

31.01.15

12/30/1899

01.01.15

31.01.15

12/30/1899

01.01.15

31.01.15

12/30/1899

Remarks

Next day

Cummulative

0
1

Backlog

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.
Month: December

15-Dec-14

Revised Plan Dates


Sr. No

Description

Unit

20

Track circuit Bonding with GI


wire
Signal /SHUNT wiring & cable
Termination

21

TX & RX device fixing the yard

22

6 Quard Cable laying Station to


station

23

Emer.Check post Fixing &


wiring

24

25

26

27

28

6 Quard Cable All joint


Completed
Multi Digical Axel Counter
wiring
High Digical Axel Counter
wiring
All signal LED Testing with
Supply 110V

All Point machine Testing

29

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard Cable


Station to Station Testing all
type

Indoor - S & T work

Relay Rack Erection

2
3

C T Rack Erection with Wago


Tag Block Packeting

All Rack Fuse & Bas Bar fixing

Fuse and bas Bar Power wiring


to CTR

Mini Base Fixing

Nos

Nos

Nos

KM

Nos

Nos

Set

Set

Nos

Nos

Nos

Lot

PPK

Nos

Nos

L.S.

L.S.

Lot

PLAN

Plan

ACTUAL
% Complete

Start
19

Actual Dates

Total Scope

40

20

20

10

10

10

18

20

15

165

Finish

Start

Finish

Today

Cummulative

Today

Backlog
Next day

Cummulative

01.01.15

03.02.15

12/30/1899

06.01.15

31.01.15

12/30/1899

06.01.15

31.01.15

12/30/1899

01.12.14

15.01.15

3.5

12/30/1899

06.01.15

31.01.15

12/30/1899

0.5

30%

06.01.15

31.01.15

12/30/1899

25.01.15

31.01.15

12/30/1899

25.01.15

31.01.15

12/30/1899

15.01.15

31.01.15

12/30/1899

15.01.15

31.01.15

12/30/1899

15.01.15

31.01.15

12/30/1899

25.01.15

31.01.15

11.09.14

25.09.14

15

15

15.09.14

15.11.14

24.09.14

31.12.14

25.09.14

30.09.14

01.01.15

15.01.15

01.10.14

06.10.14

125

120

Remarks

100%

100%

73%

5
-

100%

0%

100%

0.4

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.
Month: December

15-Dec-14

Revised Plan Dates


Sr. No

Description

Unit

10

11

12

13

14

15

16

17
18

Tag Block Fixing After


Packeting

I P S Fixing ,wiring
IPS To Relay Room Power
wiring

Data Logger Fixing & Wiring


Operating Panel Fixing &
Wiring
Cable laying & Termi. Panel to
R/room

KLCR box Fixing ,wiring

Block Instrument fixing & wiring


Control Phone & Repater fixing
& wiring
All Earth Connect properly
Jumpering as per circuit (After
Approved Circuit)
Tag Block to Base Wire Buzer
testing

19

IPS Battery Charging with IPS

20

DG Set Foundation ,Fixing &


Power Wiring

21

22

1 to 1 wire testing
Control Phone commission with
control office

23

Data Logger commissioning

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

Nos

Nos

Nos

Nos

Nos

Job

L.S.

Set

Set

Nos

Nos

L.S.

Nos

Nos

Nos

Set

Nos

No

PLAN

Plan

ACTUAL
% Complete

Start
7

Actual Dates

Total Scope

165

26

15

15

40

Finish

Start

Finish

Today

Cummulative

10

145

Today

Backlog
Next day

Cummulative

26.09.14

31.12.14

15.01.15

20.01.15

15.01.15

20.01.15

06.01.15

10.01.15

17.01.15

20.01.15

17.01.15

21.01.15

17.01.15

21.01.15

18.01.15

21.01.15

18.01.15

22.01.15

15.01.15

31.01.15

28.01.15

31.01.15

26.12.14

31.12.14

20.01.15

24.01.15

20.01.15

24.01.15

10.01.15

16.01.15

0
0
After Comp. of KPT Singling work-Tuna
St.
0
0

10.02.15

12.02.15

13.01.15

17.01.15

0
0

120

Remarks

73%

25

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.
Month: December

15-Dec-14

Revised Plan Dates


Sr. No

Description

Unit

26

27

28

Simulation Testing

Operating Panel normal

ST & LT Testing PMC

ST & LT Testing W Railway

29

Outdoor connect with indoor &


1 by 1 gear testing

30

All Yard Testing With W railway


Team

31

32

Testing work

Commissioning work

LS

Nos

LOT

LOT

LOT

PLAN

Plan

ACTUAL
% Complete

Start
25

Actual Dates

Total Scope

Nos

Lot

Lot

Finish

Start

Finish

Today

Cummulative

Today

Backlog
Next day

Cummulative

20.01.15

24.01.15

26.01.15

30.01.15

20.01.15

24.01.15

01.02.15 0.2.02.15

03.02.15

07.02.15

07.02.15

09.02.15

10.02.15

14.02.14

14.02.15

15.02.15

Unplanned Activities

0
0

Manpower

Sr. No

Unit

Actual

Fitter

Nos

Helper for Fitter

Nos

Mason

Nos

Helper for Mason

Nos

Wireman

Nos

Helper for Wire man

Nos

Carpenter

Nos

Helper for Carpenter

Nos

Supervisor

Nos

Unskilled labour

Nos

25

10

Remarks

Remarks

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Planned Dates
Start

Revised Plan Dates


Unit

Nos

Total Scope

40

Start date

11.09.14

Finish date

25.12.14

Plan Sept'14

ActualSept'14

Plan Octo'14

12

ActualOcto'14

5
10

Half Location Box


Foundation

Nos

30

11.09.14

25.12.14

7
5

6
3

Colour Light Signal


-Foundation

Nos

11.09.14

30.09.14

4
-

5
4

Shunt Signal Foundation

Nos

16

11.09.14

25.12.14

3
5

Signal - Full Location Box Erection with wiring

Nos

40

01.10.14

31.12.14

5
10

7
6

Half Location Box - Erection


with wiring

Nos

30

01.10.14

31.12.14

9
5

5
7

Colour Light Signal


-Erection

Nos

01.12.14

31.12.14

4
-

Shunt Signal Erection

Nos

16

01.12.14

31.12.14

5 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Planned Dates
Start

Revised Plan Dates


Unit
Nos

Total Scope
18

Start date
01.01.15

Finish date
15.01.15

Plan Sept'14

ActualSept'14

Plan Octo'14

ActualOcto'14
-

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

500 25.11.14

10.01.15

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

4.00 01.12.14

10.01.15

12

Trenching (1.20 x 0.300)


with Bricks

KM

7.00 01.12.14

10.01.15

13

Cable Laying

KM

110

27.11.14

15.01.15

14

Location Box inside All fitting


ARA & Fuse etc

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

40

15.12.14

15.01.15

Nos

92

01.01.15

31.01.15

16

Tail Cable Termination &


Testing

Nos

90

01.01.15

31.01.15

17

TFTR Wiring -fixing & Cable


termination

Nos

20

01.01.15

31.01.15

6 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Planned Dates
Start

Revised Plan Dates


Unit

Total Scope

Start date

Finish date

Plan Sept'14

ActualSept'14

Plan Octo'14
-

7 of 221

ActualOcto'14
-

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Planned Dates
Start

Revised Plan Dates


Unit
Nos

Total Scope
50

Start date
01.01.15

Finish date
31.01.15

Plan Sept'14

ActualSept'14

Plan Octo'14

ActualOcto'14
-

19

Track circuit Bonding with GI


wire

Nos

40

01.01.15

03.02.15

20

Signal /SHUNT wiring &


cable Termination

Nos

20

06.01.15

31.01.15

21

TX & RX device fixing the


yard

Nos

20

06.01.15

31.01.15

22

6 Quard Cable laying


Station to station

KM

10

01.12.14

15.01.15

23

Emer.Check post Fixing &


wiring

Nos

10

06.01.15

31.01.15

24

6 Quard Cable All joint


Completed

Nos

10

06.01.15

31.01.15

25

Multi Digical Axel Counter


wiring

Set

25.01.15

31.01.15

26

High Digical Axel Counter


wiring

Set

25.01.15

31.01.15

8 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Planned Dates
Start

Revised Plan Dates


Unit

Total Scope

Start date

Finish date

Plan Sept'14

ActualSept'14

Plan Octo'14

ActualOcto'14

27

All signal LED Testing with


Supply 110V

Nos

15.01.15

31.01.15

28

All Point machine Testing

Nos

18

15.01.15

31.01.15

29

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Nos

20

15.01.15

31.01.15

Lot

25.01.15

31.01.15

Indoor - S & T work


1

Relay Rack Erection

PPK

15

11.09.14

25.09.14

15

15

C T Rack Erection with


Wago

Nos

15.09.14

15.11.14

2
3

Tag Block Packeting

Nos

165 24.09.14

31.12.14

60

All Rack Fuse & Bas Bar


fixing

L.S.

25.09.14

30.09.14

56
-

9 of 221

40

64

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
5

Description
Fuse and bas Bar Power
wiring to CTR

Planned Dates
Start

Revised Plan Dates


Unit
L.S.

Total Scope
1

Start date
01.01.15

Finish date
15.01.15

Plan Sept'14

ActualSept'14

Plan Octo'14

ActualOcto'14

Mini Base Fixing

Lot

01.10.14

06.10.14

Tag Block Fixing After


Packeting

Nos

165 26.09.14

31.12.14

40

50
53

I P S Fixing ,wiring

Nos

15.01.15

20.01.15

IPS To Relay Room Power


wiring

Nos

15.01.15

20.01.15

Data Logger Fixing & Wiring

Nos

06.01.15

10.01.15

Operating Panel Fixing &


Wiring

Nos

17.01.15

20.01.15

Cable laying & Termi. Panel


to R/room

Job

17.01.15

21.01.15

KLCR box Fixing ,wiring

L.S.

17.01.15

21.01.15

10 of 221

13

12

11

67

10

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Planned Dates
Start

Revised Plan Dates


Unit
Set

Total Scope
1

Start date
18.01.15

Finish date
21.01.15

Plan Sept'14

ActualSept'14

Plan Octo'14

15

Control Phone & Repater


fixing & wiring

Set

18.01.15

22.01.15

All Earth Connect properly

Nos

26

15.01.15

31.01.15

Jumpering as per circuit


(After Approved Circuit)

Nos

15

28.01.15

31.01.15

Tag Block to Base Wire


Buzer testing

L.S.

26.12.14

31.12.14

IPS Battery Charging with


IPS

Nos

20.01.15

24.01.15

DG Set Foundation ,Fixing &


Power Wiring

Nos

20.01.15

24.01.15

1 to 1 wire testing

Nos

15

10.01.15

16.01.15

Control Phone commission


with control office

Set

1 After Comp. of KPT - Singling


work-Tuna St.

11 of 221

22

21

20

19

18

17

16

ActualOcto'14

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014

Planned Dates
Start

Revised Plan Dates

Sr. No

Description

Unit

23

Data Logger commissioning

Nos

Total Scope
1

Start date
10.02.15

Finish date
12.02.15

Plan Sept'14

ActualSept'14

Plan Octo'14

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

40

13.01.15

17.01.15

Simulation Testing

LS

20.01.15

24.01.15

Operating Panel normal

Nos

26.01.15

30.01.15

ST & LT Testing PMC

LOT

20.01.15

24.01.15

ST & LT Testing W Railway

LOT

01.02.15

0.2.02.15

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

03.02.15

07.02.15

All Yard Testing With W


railway Team

Nos

07.02.15

09.02.15

Testing work

Lot

10.02.15

14.02.14

12 of 221

31

30

29

28

27

26

25

ActualOcto'14

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Planned Dates
Start

Revised Plan Dates

Description

Unit

Commissioning work

Lot

Total Scope
1

Start date
14.02.15

Finish date
15.02.15

Commissioning AFTER complete of Tuna Station

Plan Sept'14

ActualSept'14

Plan Octo'14

13 of 221

ActualOcto'14

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL,
Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

Nos

Plan Nov'14

ActualNov'14

Plan Dec'14

ActualDec'14

Half Location Box


Foundation

Nos

Colour Light Signal


-Foundation

Nos

Shunt Signal Foundation

Nos

Signal - Full Location Box Erection with wiring

Nos

Half Location Box - Erection


with wiring

Nos

Colour Light Signal


-Erection

Nos

Shunt Signal Erection

Nos

21

5
-

24

8
-

ActualFeb'15

Plan Feb'15

19
-

ActualJan'15

23
-

Plan Jan'15

16
-

14 of 221

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit
Nos

Plan Nov'14

ActualNov'14

Plan Dec'14

ActualDec'14
-

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

Trenching (1.00 x 0.300)


under Track with Bricks

KM

50

Trenching (1.20 x 0.300)


with Bricks

KM

2.80

5.20
2

13

Cable Laying

KM

6.00

14

Location Box inside All fitting


ARA & Fuse etc

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

70.00

Nos

20.00

Tail Cable Termination &


Testing

Nos

TFTR Wiring -fixing & Cable


termination

Nos

92.00
-

90.00
-

17

20.00

16

34.00
25

1.80
2

1.20
-

ActualFeb'15

100
12

Plan Feb'15

18

350

12

ActualJan'15

11

Plan Jan'15

20.00

15 of 221

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

Plan Nov'14

ActualNov'14

Plan Dec'14
-

16 of 221

ActualDec'14

Plan Jan'15
-

ActualJan'15

Plan Feb'15
-

ActualFeb'15
-

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Unit
Nos

Plan Nov'14

ActualNov'14

Plan Dec'14

Track circuit Bonding with GI


wire

Nos

Signal /SHUNT wiring &


cable Termination

Nos

TX & RX device fixing the


yard

Nos

6 Quard Cable laying


Station to station

KM

Emer.Check post Fixing &


wiring

Nos

6 Quard Cable All joint


Completed

Nos

Multi Digical Axel Counter


wiring

Set

High Digical Axel Counter


wiring

Set

10
-

10
-

1
-

26

3.00

25

7.00

24

20.00

23

ActualFeb'15

20.00

22

Plan Feb'15

40.00

21

ActualJan'15

50.00

20

Plan Jan'15

19

ActualDec'14

17 of 221

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

Plan Nov'14

ActualNov'14

Plan Dec'14

ActualDec'14

27

All signal LED Testing with


Supply 110V

Nos

All Point machine Testing

Nos

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Nos

ActualFeb'15

18
-

20
-

Lot

Plan Feb'15

29

ActualJan'15

28

Plan Jan'15

1
-

Indoor - S & T work


1

Relay Rack Erection

C T Rack Erection with


Wago

PPK

Nos

Tag Block Packeting

All Rack Fuse & Bas Bar


fixing

Nos

L.S.

25

40

18 of 221

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
5

10

11

12

13

Description
Fuse and bas Bar Power
wiring to CTR

Mini Base Fixing

Tag Block Fixing After


Packeting

I P S Fixing ,wiring

IPS To Relay Room Power


wiring

Data Logger Fixing & Wiring

Operating Panel Fixing &


Wiring

Cable laying & Termi. Panel


to R/room

KLCR box Fixing ,wiring

Unit

Plan Nov'14

ActualNov'14

L.S.

Lot

Nos

Nos

Nos

Nos

Nos

Job

L.S.

25

Plan Dec'14

ActualDec'14

Plan Jan'15

50

Plan Feb'15

ActualFeb'15

1
-

19 of 221

ActualJan'15

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

15

16

17

18

19

20

21

22

Description
Block Instrument fixing &
wiring

Control Phone & Repater


fixing & wiring

All Earth Connect properly

Jumpering as per circuit


(After Approved Circuit)

Tag Block to Base Wire


Buzer testing

IPS Battery Charging with


IPS

DG Set Foundation ,Fixing &


Power Wiring

1 to 1 wire testing

Control Phone commission


with control office

Unit
Set

Set

Nos

Nos

L.S.

Nos

Nos

Nos

Set

Plan Nov'14

ActualNov'14

Plan Dec'14

ActualDec'14

Plan Jan'15

Plan Feb'15

ActualFeb'15

1
-

26

15

20 of 221

ActualJan'15

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

24

25

26

27

28

29

30

31

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

Simulation Testing

Operating Panel normal

ST & LT Testing PMC

ST & LT Testing W Railway

Outdoor connect with indoor


& 1 by 1 gear testing

All Yard Testing With W


railway Team

Testing work

No

LS

Nos

LOT

LOT

LOT

Nos

Lot

Plan Nov'14

ActualNov'14

Plan Dec'14

ActualDec'14

Plan Jan'15

21 of 221

ActualJan'15

Plan Feb'15

ActualFeb'15

Project :- S & T work for AKBTPL,


Tuna
Planned
Dates
Name of Conractor :- Vijaywargi infra Finish
Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

Plan Nov'14

ActualNov'14

Commissioning AFTER complete of Tuna Station

Plan Dec'14

ActualDec'14

Plan Jan'15

22 of 221

ActualJan'15

Plan Feb'15

ActualFeb'15
1

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

Nos

PLAN - Up to ACTUAL - Up
Date
to Date

40
22

Half Location Box


Foundation

Nos

30
16

Colour Light Signal


-Foundation

Nos

5
6

Shunt Signal Foundation

Nos

16
8

Signal - Full Location Box Erection with wiring

Nos

40
22

Half Location Box - Erection


with wiring

Nos

30
13

Colour Light Signal


-Erection

Nos

5
-

Shunt Signal Erection

Nos

16
-

23 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit
Nos

PLAN - Up to ACTUAL - Up
Date
to Date
18
-

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

500
12

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

4
-

12

Trenching (1.20 x 0.300)


with Bricks

KM

7
3.72

13

Cable Laying

KM

110
25

14

Location Box inside All fitting


ARA & Fuse etc

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

40
-

Nos

92
-

16

Tail Cable Termination &


Testing

Nos

90
-

17

TFTR Wiring -fixing & Cable


termination

Nos

20

24 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

PLAN - Up to ACTUAL - Up
Date
to Date
-

25 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Unit
Nos

PLAN - Up to ACTUAL - Up
Date
to Date
50
-

19

Track circuit Bonding with GI


wire

Nos

40
-

20

Signal /SHUNT wiring &


cable Termination

Nos

20
-

21

TX & RX device fixing the


yard

Nos

20
-

22

6 Quard Cable laying


Station to station

KM

10
3

23

Emer.Check post Fixing &


wiring

Nos

10
-

24

6 Quard Cable All joint


Completed

Nos

10
-

25

Multi Digical Axel Counter


wiring

Set

1
-

26

High Digical Axel Counter


wiring

Set

26 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

PLAN - Up to ACTUAL - Up
Date
to Date
-

27

All signal LED Testing with


Supply 110V

Nos

5
-

28

All Point machine Testing

Nos

18
-

29

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Nos

20
-

Lot

1
-

Indoor - S & T work


1

Relay Rack Erection

PPK

15
15

C T Rack Erection with


Wago

Nos

2
2

Tag Block Packeting

Nos

165
120

All Rack Fuse & Bas Bar


fixing

L.S.

1
1

27 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
5

Description
Fuse and bas Bar Power
wiring to CTR

Unit
L.S.

PLAN - Up to ACTUAL - Up
Date
to Date
1
-

Mini Base Fixing

Lot

1
1

Tag Block Fixing After


Packeting

Nos

165
120

I P S Fixing ,wiring

Nos

1
-

IPS To Relay Room Power


wiring

Nos

1
-

10

Data Logger Fixing & Wiring

Nos

1
-

11

Operating Panel Fixing &


Wiring

Nos

1
-

12

Cable laying & Termi. Panel


to R/room

Job

1
-

13

KLCR box Fixing ,wiring

L.S.

1
-

28 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit
Set

PLAN - Up to ACTUAL - Up
Date
to Date
1
-

15

Control Phone & Repater


fixing & wiring

Set

1
-

16

All Earth Connect properly

Nos

26
-

17

Jumpering as per circuit


(After Approved Circuit)

Nos

15
-

18

Tag Block to Base Wire


Buzer testing

L.S.

1
-

19

IPS Battery Charging with


IPS

Nos

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

21

1 to 1 wire testing

Nos

22

Control Phone commission


with control office

Set

29 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

PLAN - Up to ACTUAL - Up
Date
to Date
-

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

25

Simulation Testing

LS

26

Operating Panel normal

Nos

27

ST & LT Testing PMC

LOT

28

ST & LT Testing W Railway

LOT

1
-

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

1
-

30

All Yard Testing With W


railway Team

Nos

1
-

31

Testing work

Lot

1
-

30 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

PLAN - Up to ACTUAL - Up
Date
to Date
1

Commissioning AFTER complete of Tuna Station

31 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

Nos

S
u
25.09.14
n
d
a
Plan ## y

Plan/
Actual
Actual

Actual ##
2

Half Location Box


Foundation

Nos

Plan ##
Actual ##

Colour Light Signal


-Foundation

Nos

Plan ##
Actual ##

Shunt Signal Foundation

Nos

Plan ##
Actual

Signal - Full Location Box Erection with wiring

Nos

Plan
Actual

Half Location Box - Erection


with wiring

Nos

Plan
Actual

Colour Light Signal


-Erection

Nos

Plan
Actual

Shunt Signal Erection

Nos

Plan

###
_
_
_
_
_
_
_
###

32 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit
Nos

Plan/
Actual
Plan
Actual

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

Plan
Actual

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

Plan
Actual

12

Trenching (1.20 x 0.300)


with Bricks

KM

Plan
Actual

13

Cable Laying

KM

Plan
Actual

14

Location Box inside All fitting


ARA & Fuse etc

Main Cable Termination &


Testing - C T Rack & All
location

Tail Cable Termination &


Testing

Nos

Plan

Nos

Plan
Actual

17

TFTR Wiring -fixing & Cable


termination

_
_
_
_
_
_
_
_
_

Plan

Actual
16

_
Nos

Actual
15

25.09.14

Nos

Plan

_
_
_
_
_
_

33 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

Plan/
Actual
Actual

25.09.14
_

34 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Unit
Nos

Plan/
Actual
Plan
Actual

19

Track circuit Bonding with GI


wire

Nos

Plan
Actual

20

Signal /SHUNT wiring &


cable Termination

Nos

Plan
Actual

21

TX & RX device fixing the


yard

Nos

Plan
Actual

22

6 Quard Cable laying


Station to station

KM

Plan
Actual

23

Emer.Check post Fixing &


wiring

Nos

Plan
Actual

24

6 Quard Cable All joint


Completed

Nos

Plan
Actual

25

Multi Digical Axel Counter


wiring

Set

Plan
Actual

26

High Digical Axel Counter


wiring

Set

Plan

25.09.14
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

35 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

Plan/
Actual
Actual

27

All signal LED Testing with


Supply 110V

All Point machine Testing

Nos

Plan
Actual

29

TR Pick-up & TPR Supply


Check

Nos

Plan
Actual

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Lot

Plan
Actual

Indoor - S & T work


1

Relay Rack Erection

C T Rack Erection with


Wago

PPK

Plan

Nos

Plan
Actual

Tag Block Packeting

_
_
_
_
_
_
_
###

Actual
2

_
_

Nos
Actual

28

25.09.14

Nos

Plan

_
_
_
_
#

Actual #
4

All Rack Fuse & Bas Bar


fixing

L.S.

Plan

Actual ##

36 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
5

Description
Fuse and bas Bar Power
wiring to CTR

Unit
L.S.

Plan/
Actual
Plan

25.09.14
_
###

Mini Base Fixing

Lot

Plan
Actual

Tag Block Fixing After


Packeting

Nos

Plan

_
_
#

Actual #
8

I P S Fixing ,wiring

Nos

Plan
Actual

IPS To Relay Room Power


wiring

Nos

Plan
Actual

10

Data Logger Fixing & Wiring

Nos

Plan

_
_
_
_
_
###

11

Operating Panel Fixing &


Wiring

Nos

Plan
Actual

12

Cable laying & Termi. Panel


to R/room

Job

Plan
Actual

13

KLCR box Fixing ,wiring

L.S.

Plan
Actual

_
_
_
_
_
_

37 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit
Set

Plan/
Actual
Plan
Actual

15

Control Phone & Repater


fixing & wiring

Set

Plan
Actual

16

All Earth Connect properly

Nos

Plan
Actual

17

Jumpering as per circuit


(After Approved Circuit)

Nos

Plan
Actual

18

Tag Block to Base Wire


Buzer testing

L.S.

Plan
Actual

19

IPS Battery Charging with


IPS

Nos

Plan
Actual

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

Plan
Actual

21

1 to 1 wire testing

Nos

Plan
Actual

22

Control Phone commission


with control office

Set

Plan
Actual

25.09.14
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_

38 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

Plan/
Actual
Plan
Actual

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

Plan
Actual

25

Simulation Testing

LS

25.09.14
_
_
_
_
#
#

26

Operating Panel normal

Nos

Plan
Actual

27

ST & LT Testing PMC

LOT

Plan
Actual

28

ST & LT Testing W Railway

LOT

Plan
Actual

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

Plan
Actual

30

All Yard Testing With W


railway Team

Nos

Plan
Actual

31

Testing work

Lot

Plan
Actual

_
_
_
_
_
_
_
_
_
_
_
_

39 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

Plan/
Actual
Plan

25.09.14
_

_
Commissioning AFTER complete ofActual
Tuna Station

40 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Half Location Box


Foundation

Colour Light Signal


-Foundation

Shunt Signal Foundation

Unit

Nos

Nos

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Nos

Nos

Sunday

_
_

Signal - Full Location Box Erection with wiring

Nos

_
_

Half Location Box - Erection


with wiring

Nos

_
_

Colour Light Signal


-Erection

Nos

_
_

Shunt Signal Erection

Nos

41 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Nos

Sunday
_
_

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

25

25

25

8.00
11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

0.2

_
0.2

0.2

_
_

12

13

Trenching (1.20 x 0.300)


with Bricks

Cable Laying

KM

KM

14

Location Box inside All fitting


ARA & Fuse etc

Nos

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

16

Tail Cable Termination &


Testing

Nos

17

TFTR Wiring -fixing & Cable


termination

Nos

0.4

0.4

0.4

_
0.2

0.5

0.4

0.3

0.2

0.25

2.7

2.5

2.5

2.5

2.5

2.5

1.5

4.5

42 of 221

3.5

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

01.12.14

02.12.14

03.12.14

43 of 221

04.12.14

05.12.14

06.12.14

Sunday

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

18

TLD fixing & Cable


termination

Nos

19

Track circuit Bonding with GI


wire

Nos

20

Signal /SHUNT wiring &


cable Termination

Nos

21

TX & RX device fixing the


yard

Nos

22

6 Quard Cable laying


Station to station

KM

01.12.14

0.5

02.12.14

03.12.14

0.5
1

23

Emer.Check post Fixing &


wiring

Nos

24

6 Quard Cable All joint


Completed

Nos

25

Multi Digical Axel Counter


wiring

Set

26

High Digical Axel Counter


wiring

Set

04.12.14

44 of 221

05.12.14

06.12.14

Sunday

0.5
1

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

27

All signal LED Testing with


Supply 110V

Nos

28

All Point machine Testing

Nos

29

TR Pick-up & TPR Supply


Check

Nos

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Lot

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

Indoor - S & T work


1

Relay Rack Erection

PPK

_
_

C T Rack Erection with


Wago

Nos

_
_

Tag Block Packeting

Nos

_
_

All Rack Fuse & Bas Bar


fixing

L.S.

_
_

45 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

Fuse and bas Bar Power


wiring to CTR

L.S.

Mini Base Fixing

Lot

_
_

Tag Block Fixing After


Packeting

Nos

10

_
_

I P S Fixing ,wiring

Nos

_
_

IPS To Relay Room Power


wiring

Nos

_
_

10

Data Logger Fixing & Wiring

Nos

11

Operating Panel Fixing &


Wiring

Nos

_
_

12

Cable laying & Termi. Panel


to R/room

Job

_
_

13

KLCR box Fixing ,wiring

L.S.

_
_

46 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit

01.12.14

02.12.14

03.12.14

Set

04.12.14

05.12.14

06.12.14

Sunday
_
_

15

Control Phone & Repater


fixing & wiring

Set

_
_

16

All Earth Connect properly

Nos

_
_

17

Jumpering as per circuit


(After Approved Circuit)

Nos
_

18

Tag Block to Base Wire


Buzer testing

L.S.

_
_

19

IPS Battery Charging with


IPS

Nos

_
_

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

_
_

21

1 to 1 wire testing

Nos
_

22

Control Phone commission


with control office

Set

_
_

47 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday
_
_

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

_
_

25

Simulation Testing

LS

26

Operating Panel normal

Nos

_
_

27

ST & LT Testing PMC

LOT

_
_

28

ST & LT Testing W Railway

LOT

_
_

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

_
_

30

All Yard Testing With W


railway Team

Nos

_
_

31

Testing work

Lot

_
_

48 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday
_

Commissioning AFTER complete of Tuna Station

49 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Half Location Box


Foundation

Colour Light Signal


-Foundation

Unit

Nos

Nos

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

_
_

_
1

Nos

_
_

Shunt Signal Foundation

Nos

_
_

Signal - Full Location Box Erection with wiring

Half Location Box - Erection


with wiring

Colour Light Signal


-Erection

Nos

Nos

Nos

_
_

_
_
_

Shunt Signal Erection

Nos

50 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

Nos
_

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

25

25

25

_
_

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

0.2

0.2

0.2

_
_

12

Trenching (1.20 x 0.300)


with Bricks

KM

0.4

0.4

0.4

0.2
13

Cable Laying

KM

14

Location Box inside All fitting


ARA & Fuse etc

Nos

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

16

Tail Cable Termination &


Testing

Nos

17

TFTR Wiring -fixing & Cable


termination

Nos

_
_

2.5

2.5

3.5

2.5

2.5
0.8

51 of 221

2.5

2.5
_

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

08.12.14

09.12.14

10.12.14

52 of 221

11.12.14

12.12.14

13.12.14

Sunday

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

18

TLD fixing & Cable


termination

Nos

19

Track circuit Bonding with GI


wire

Nos

20

Signal /SHUNT wiring &


cable Termination

Nos

21

TX & RX device fixing the


yard

Nos

22

6 Quard Cable laying


Station to station

KM

23

Emer.Check post Fixing &


wiring

Nos

24

6 Quard Cable All joint


Completed

Nos

25

Multi Digical Axel Counter


wiring

Set

26

High Digical Axel Counter


wiring

Set

08.12.14

0.5

09.12.14

10.12.14

0.5

53 of 221

11.12.14

12.12.14

0.5

13.12.14

Sunday

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

27

All signal LED Testing with


Supply 110V

Nos

28

All Point machine Testing

Nos

29

TR Pick-up & TPR Supply


Check

Nos

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Lot

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

Indoor - S & T work


1

Relay Rack Erection

PPK

_
_

C T Rack Erection with


Wago

Nos

_
_

Tag Block Packeting

Nos

_
_

All Rack Fuse & Bas Bar


fixing

L.S.

_
_

54 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

Fuse and bas Bar Power


wiring to CTR

L.S.

Mini Base Fixing

Lot

_
_

Tag Block Fixing After


Packeting

Nos

10

_
_

I P S Fixing ,wiring

Nos

_
_

IPS To Relay Room Power


wiring

Nos

_
_

10

Data Logger Fixing & Wiring

Nos

11

Operating Panel Fixing &


Wiring

Nos

_
_

12

Cable laying & Termi. Panel


to R/room

Job

_
_

13

KLCR box Fixing ,wiring

L.S.

_
_

55 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit

08.12.14

09.12.14

10.12.14

Set

11.12.14

12.12.14

13.12.14

Sunday
_
_

15

Control Phone & Repater


fixing & wiring

Set

_
_

16

All Earth Connect properly

Nos

_
_

17

Jumpering as per circuit


(After Approved Circuit)

Nos
_

18

Tag Block to Base Wire


Buzer testing

L.S.

_
_

19

IPS Battery Charging with


IPS

Nos

_
_

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

_
_

21

1 to 1 wire testing

Nos

_
_

22

Control Phone commission


with control office

Set

_
_

56 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday
_
_

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No
_

25

Simulation Testing

LS

26

Operating Panel normal

Nos

_
_

27

ST & LT Testing PMC

LOT

_
_

28

ST & LT Testing W Railway

LOT

_
_

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

_
_

30

All Yard Testing With W


railway Team

Nos

_
_

31

Testing work

Lot

_
_

57 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday
_

Commissioning AFTER complete of Tuna Station

58 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

Nos

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

_
_

Half Location Box


Foundation

Nos

_
_

Colour Light Signal


-Foundation

Nos

_
_

Shunt Signal Foundation

Nos

_
_

Signal - Full Location Box Erection with wiring

Nos

_
_

Half Location Box - Erection


with wiring

Nos

_
_

Colour Light Signal


-Erection

Nos

_
_

Shunt Signal Erection

Nos

59 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

Nos
_

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

25

25

25

4
11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

0.2

0.2

0.2

_
_

12

Trenching (1.20 x 0.300)


with Bricks

KM

0.4

0.4

0.4

0.15
13

Cable Laying

KM

2.5

_
2.5

2.5

2.5

2.7

4
14

Location Box inside All fitting


ARA & Fuse etc

Nos

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

16

Tail Cable Termination &


Testing

Nos

17

TFTR Wiring -fixing & Cable


termination

Nos

2.7

_
_

60 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

15.12.14

16.12.14

17.12.14

61 of 221

18.12.14

19.12.14

20.12.14

Sunday

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

18

TLD fixing & Cable


termination

Nos

19

Track circuit Bonding with GI


wire

Nos

20

Signal /SHUNT wiring &


cable Termination

Nos

21

TX & RX device fixing the


yard

Nos

22

6 Quard Cable laying


Station to station

KM

23

Emer.Check post Fixing &


wiring

Nos

24

6 Quard Cable All joint


Completed

Nos

25

Multi Digical Axel Counter


wiring

Set

26

High Digical Axel Counter


wiring

Set

15.12.14

0.5

16.12.14

17.12.14

0.5

62 of 221

18.12.14

19.12.14

0.5

20.12.14

Sunday

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

27

All signal LED Testing with


Supply 110V

Nos

28

All Point machine Testing

Nos

29

TR Pick-up & TPR Supply


Check

Nos

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Lot

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

Indoor - S & T work


1

Relay Rack Erection

PPK

_
_

C T Rack Erection with


Wago

Nos

_
_

Tag Block Packeting

Nos

10

10

_
_

All Rack Fuse & Bas Bar


fixing

L.S.

_
_

63 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

Fuse and bas Bar Power


wiring to CTR

L.S.

Mini Base Fixing

Lot

_
_

Tag Block Fixing After


Packeting

Nos

10

_
_

I P S Fixing ,wiring

Nos

_
_

IPS To Relay Room Power


wiring

Nos

_
_

10

Data Logger Fixing & Wiring

Nos

11

Operating Panel Fixing &


Wiring

Nos

_
_

12

Cable laying & Termi. Panel


to R/room

Job

_
_

13

KLCR box Fixing ,wiring

L.S.

_
_

64 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit

15.12.14

16.12.14

17.12.14

Set

18.12.14

19.12.14

20.12.14

Sunday
_
_

15

Control Phone & Repater


fixing & wiring

Set

_
_

16

All Earth Connect properly

Nos

_
_

17

Jumpering as per circuit


(After Approved Circuit)

Nos
_

18

Tag Block to Base Wire


Buzer testing

L.S.

_
_

19

IPS Battery Charging with


IPS

Nos

_
_

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

_
_

21

1 to 1 wire testing

Nos

_
_

22

Control Phone commission


with control office

Set

_
_

65 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday
_
_

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

_
_

25

Simulation Testing

LS

26

Operating Panel normal

Nos

_
_

27

ST & LT Testing PMC

LOT

_
_

28

ST & LT Testing W Railway

LOT

_
_

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

_
_

30

All Yard Testing With W


railway Team

Nos

_
_

31

Testing work

Lot

_
_

66 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday
_

Commissioning AFTER complete of Tuna Station

67 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

Nos

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday

_
_

Half Location Box


Foundation

Nos

_
_

Colour Light Signal


-Foundation

Nos

_
_

Shunt Signal Foundation

Nos

_
_

Signal - Full Location Box Erection with wiring

Nos

_
_

Half Location Box - Erection


with wiring

Nos

_
_

Colour Light Signal


-Erection

Nos

_
_

Shunt Signal Erection

Nos

68 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday

Nos
_

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

25

25

25

_
_

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

0.2

0.2

0.2

_
_

12

Trenching (1.20 x 0.300)


with Bricks

KM

0.4

0.4

0.4

_
_

13

Cable Laying

KM

2.7

2.7

2.7

2.7

2.7

2.7
_

14

Location Box inside All fitting


ARA & Fuse etc

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

_
_

Nos

_
_

16

Tail Cable Termination &


Testing

Nos

_
_

17

TFTR Wiring -fixing & Cable


termination

Nos

69 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday
_

70 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Unit

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

Nos

27.12.14

Sunday
_
_

19

Track circuit Bonding with GI


wire

Nos

_
_

20

Signal /SHUNT wiring &


cable Termination

Nos

_
_

21

TX & RX device fixing the


yard

Nos

22

6 Quard Cable laying


Station to station

KM

0.5

0.5

0.5
_

23

Emer.Check post Fixing &


wiring

Nos

_
_

24

6 Quard Cable All joint


Completed

Nos

_
_

25

Multi Digical Axel Counter


wiring

Set

_
_

26

High Digical Axel Counter


wiring

Set

71 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday
_

27

All signal LED Testing with


Supply 110V

Nos
_

28

All Point machine Testing

Nos

_
_

29

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Nos

_
_

Lot
_

Indoor - S & T work


1

Relay Rack Erection

PPK

_
_

C T Rack Erection with


Wago

Nos

_
_

Tag Block Packeting

Nos

10

10

_
_

All Rack Fuse & Bas Bar


fixing

L.S.

_
_

72 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday

Fuse and bas Bar Power


wiring to CTR

L.S.

Mini Base Fixing

Lot

_
_

Tag Block Fixing After


Packeting

Nos

10

_
_

I P S Fixing ,wiring

Nos

_
_

IPS To Relay Room Power


wiring

Nos

_
_

10

Data Logger Fixing & Wiring

Nos

11

Operating Panel Fixing &


Wiring

Nos

_
_

12

Cable laying & Termi. Panel


to R/room

Job

_
_

13

KLCR box Fixing ,wiring

L.S.

_
_

73 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit

22.12.14

23.12.14

24.12.14

Set

25.12.14

26.12.14

27.12.14

Sunday
_
_

15

Control Phone & Repater


fixing & wiring

Set

_
_

16

All Earth Connect properly

Nos

_
_

17

Jumpering as per circuit


(After Approved Circuit)

Nos
_

18

Tag Block to Base Wire


Buzer testing

L.S.

_
_

19

IPS Battery Charging with


IPS

Nos

_
_

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

_
_

21

1 to 1 wire testing

Nos

_
_

22

Control Phone commission


with control office

Set

_
_

74 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday
_
_

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

_
_

25

Simulation Testing

LS

26

Operating Panel normal

Nos

_
_

27

ST & LT Testing PMC

LOT

_
_

28

ST & LT Testing W Railway

LOT

_
_

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

_
_

30

All Yard Testing With W


railway Team

Nos

_
_

31

Testing work

Lot

_
_

75 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday
_

Commissioning AFTER complete of Tuna Station

76 of 221

Daily Planning Report for Execution - S & T work


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Outdoor - S & T work

Signal - Full Location Box


Foundation

Unit

29.12.14

30.12.14

31.12.14

Nos

Plan Dec'14

ActualDec'14

23
5

Half Location Box


Foundation

Nos

19
6

Colour Light Signal


-Foundation

Nos

0
1

Shunt Signal Foundation

Nos

8
0

Signal - Full Location Box Erection with wiring

Nos

24
6

Half Location Box - Erection


with wiring

Nos

21
4

Colour Light Signal


-Erection

Nos

5
0

Shunt Signal Erection

Nos

16
0

77 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
9

Description
Point machine fixing &
Roading

Unit

29.12.14

30.12.14

31.12.14

Nos

Plan Dec'14

ActualDec'14

0
0

10

Trenching (1.20 x 0.300)


with DWC/RCC Pipe in All
type Crossing

Rmt

25

25

350
12

11

Trenching (1.00 x 0.300)


under Track with Bricks

KM

0.2

0.2

2.8
0

12

Trenching (1.20 x 0.300)


with Bricks

KM

0.4

5.2
2.2

13

Cable Laying

KM

2.7

2.7

2.8

70
24.8

14

Location Box inside All fitting


ARA & Fuse etc

15

Main Cable Termination &


Testing - C T Rack & All
location

Nos

20
0

Nos

0
0

16

Tail Cable Termination &


Testing

Nos

0
0

17

TFTR Wiring -fixing & Cable


termination

Nos

78 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

29.12.14

30.12.14

31.12.14

Plan Dec'14

ActualDec'14
0

79 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
18

Description
TLD fixing & Cable
termination

Unit

29.12.14

30.12.14

31.12.14

Nos

Plan Dec'14

ActualDec'14

0
0

19

Track circuit Bonding with GI


wire

Nos

0
0

20

Signal /SHUNT wiring &


cable Termination

Nos

0
0

21

TX & RX device fixing the


yard

Nos

0
0

22

6 Quard Cable laying


Station to station

KM

0.5

0.5

7.0
3.00

23

Emer.Check post Fixing &


wiring

Nos

0
0

24

6 Quard Cable All joint


Completed

Nos

0
0

25

Multi Digical Axel Counter


wiring

Set

0
0

26

High Digical Axel Counter


wiring

Set

80 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

29.12.14

30.12.14

31.12.14

Plan Dec'14

ActualDec'14
0

27

All signal LED Testing with


Supply 110V

Nos

0
0

28

All Point machine Testing

Nos

0
0

29

TR Pick-up & TPR Supply


Check

30

Megour Test - 6 Quard


Cable Station to Station
Testing all type

Nos

0
0

Lot

0
0

Indoor - S & T work


1

Relay Rack Erection

0
PPK

0
0

C T Rack Erection with


Wago

Nos

0
0

Tag Block Packeting

Nos

40
0

All Rack Fuse & Bas Bar


fixing

L.S.

0
0

81 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
5

Description
Fuse and bas Bar Power
wiring to CTR

Unit

29.12.14

30.12.14

31.12.14

L.S.

Plan Dec'14

ActualDec'14

0
0

Mini Base Fixing

Lot

0
0

Tag Block Fixing After


Packeting

Nos

10

50
0

I P S Fixing ,wiring

Nos

0
0

IPS To Relay Room Power


wiring

Nos

0
0

10

Data Logger Fixing & Wiring

Nos

0
0

11

Operating Panel Fixing &


Wiring

Nos

0
0

12

Cable laying & Termi. Panel


to R/room

Job

0
0

13

KLCR box Fixing ,wiring

L.S.

0
0

82 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
14

Description
Block Instrument fixing &
wiring

Unit

29.12.14

30.12.14

31.12.14

Set

Plan Dec'14

ActualDec'14

0
0

15

Control Phone & Repater


fixing & wiring

Set

0
0

16

All Earth Connect properly

Nos

0
0

17

Jumpering as per circuit


(After Approved Circuit)

Nos

0
0

18

Tag Block to Base Wire


Buzer testing

L.S.

1
0

19

IPS Battery Charging with


IPS

Nos

0
0

20

DG Set Foundation ,Fixing &


Power Wiring

Nos

0
0

21

1 to 1 wire testing

Nos

0
0

22

Control Phone commission


with control office

Set

0
0

83 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No

Description

Unit

23

Data Logger commissioning

Nos

29.12.14

30.12.14

31.12.14

Plan Dec'14

ActualDec'14

0
0

24

Group fixing (Signal,2 & 3


Aspect,Point , Shunt signal,
Root, Chain Group)

No

0
0

25

Simulation Testing

LS

0
0

26

Operating Panel normal

Nos

0
0

27

ST & LT Testing PMC

LOT

1
0

28

ST & LT Testing W Railway

LOT

1
0

29

Outdoor connect with indoor


& 1 by 1 gear testing

LOT

1
0

30

All Yard Testing With W


railway Team

Nos

1
0

31

Testing work

Lot

1
0

84 of 221

Project :- S & T work for AKBTPL, Tuna


Name of Conractor :- Vijaywargi infra Engineers Pvt. Ltd.
Month: December - 2014
Sr. No
32

Description

Unit

Commissioning work

Lot

29.12.14

30.12.14

31.12.14
1

Commissioning AFTER complete of Tuna Station

Plan Dec'14

ActualDec'14

1
0

85 of 221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

RELAY RACK

Nos

15

25.8.14

01.09.14

15

15

100%

CABLE TERMINATION RACK

Nos

25.8.14

01.09.14

100%

TOG BLOCK 200-WAY,DWG:IRS-S772006

Nos

150

15.09.14

20.09.14

150

150

100%

TAG BLOCK,96 WAY,DWG:IRS:S77-2006 R-1

Nos

15

15.09.14

20.09.14

15

15

100%

Wago or similar terminal

Nos

8500

05.10.14

10.10.14

8500

8500

100%

Point Group

Nos

11

28.10.14

10.11.14

11

11

100%

Signal Group -3 Aspect

Nos

01.12.14

31.12.14

0%

Signal Group -2 Aspect

Nos

01.12.14

31.12.14

0%

Shunt Signal Group

Nos

12

01.12.14

31.12.14

0%

10

Route Group

Nos

10

01.12.14

31.12.14

0%

11

Chain Group

Nos

01.12.14

31.12.14

0%

12

DC neutral line Relay Mini Group


6F/2B, 5F/3B, 4F/4B

Nos

400

01.12.14

30.11.14

400

375

94%

25

86of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

13

Plug in type Interlocked relay 4F/4B

Nos

120

28.10.14

10.11.14

120

120

100%

14

Key Lock Relay

Nos

10

28.10.14

10.11.14

10

10

100%

15

Time Element Relay AG Timer

Nos

15

20.09.14

25.09.14

15

15

100%

16

Fail Safe Electronic Relay 60 Flasher

Nos

28.10.14

10.11.14

100%

17

Q' series ECRs Relays

Nos

01.12.14

31.12.14

0%

18

Lamp providing Relay for junction


type Lamp Route indicatar

Nos

01.12.14

31.12.14

0%

87of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

19

Prewired crank handle cum key lock


relay box suitable for 6 crank handle
rel

Nos

01.12.14

31.12.14

0%

20

Supply of 25sq.mm (To be used for


power wiring)

km

0.2

01.12.14

31.12.14

0%

21

Supply of 16 sq.mm (To be used for


power wiring)

km

01.10.14

10.10.14

0.982

98%

22

Supply of 10 sq.mm (To be used for


power wiring)

km

01.12.14

31.12.14

0%

23

Supply of 6 sq.mm (To be used for


power wiring)

km

01.10.14

10.10.14

2.964

99%

24

Supply of 3 x 0.7 sq.mm.


(Red/Black) ( For circuit wiring in Loc
Boxes)

km

01.10.14

10.10.14

4.964

99%

25

Supply of Indoor PVC Flexible 16 x


0.23mm.(Red/Black) ( For Realy
base wiring in Loc Boxes)

km

10

01.10.14

10.10.14

10

9.997

100%

26

Signalling indoor multi core cable


0.6 mm dia. - 60 core

km

09.09.14

18.09.14

2.975

99%

27

Signalling indoor multi core cable


0.6 mm dia. - 40 core

km

09.09.14

18.09.14

100%

28

IndoorJumper Wire ATC 1 x 1 mm dia


in various colors

km

01.10.14

10.10.14

5.994

100%

29

Signalling indoor multi core


cable1.0mm dia. 24 core

km

01.12.14

31.12.14

0%

30

'Indoor Jumper Wire of various


colour as per Railways standard
practice of type ATC 1 x 0.6 mm dia.

km

45

01.12.14

31.12.14

0%

88of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

31

Resisters, condencer, Diode,


LEDs,,LUGS

LSM

01.12.14

31.12.14

0%

32

LED type,Operating cum Indication


Panel

Nos

01.01.15

15.01.15

0%

33

Networked Data Logger -1024


Digical

Nos

15.12.14

31.12.14

0%

34

Integrated Power(IPS) SMPS

Nos

15.12.14

31.12.14

0%

35

autochange over panel for 3


incoming 63 Amp

Nos

09.09.14

15.09.14

100%

36

Hylum Sheet in size of


860x100x10mm

Nos

200

05.09.14

10.09.14

200

200

100%

37

Hylum Sheet in size of


385x100x10mm

Nos

70

05.09.14

10.09.14

70

70

100%

38

Hylum Sheet in size of 2.440


mx1.22mx18mm

Nos

05.09.14

10.09.14

100%

39

2 core x 2.5 sq.mm. in drum length


of 1 Km.

KM

5.085

01.10.14

15.10.14

98%

40

6 core x 1.5 sq.mm.

KM

8.117

01.10.14

15.10.14

99%

41

12 core x 1.5 sq.mm.

KM

43.352

01.10.14

15.10.14

43

43

99%

42

30 core x 1.5 sq.mm. in drum


length of 500 mtr

KM

23.194

01.10.14

15.10.14

23

23

99%

43

Aluminium conductor power PVC


insulated as per IRS-S:63/2007 & IS
1554. - 2 core x 25 sq.mm.

KM

16.5

01.10.14

15.10.14

16.5

16.5

100%

89of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

45

DWC pipe

mtr

500

01.10.14

15.10.14

500

498

100%

46

Colour light signal - 2 aspect

Nos

10.09.14

15.09.14

100%

47

Off-set Bracket 140mm dia..

Nos

10.09.14

15.09.14

100%

48

Calling/on Signal

Nos

10.09.14

15.09.14

100%

49

Supply of Colour light signal - 3


aspect as per drg.No.SA - 23003 A/M
(adv.) alt.8 & Specn. IRS-S-23/86 &
26/64 having following items :

Nos

10.09.14

15.09.14

100%

50

Supply of OFF set bracket of shunt


signal for 90mm dia

Nos

10.09.14

15.09.14

100%

51

Supply of Junction type route


indicator units for one route.(Set of
5 LED units each.)

Nos

10.09.14

15.09.14

100%

52

Supply of Independent shunt signals


complete having following items.

Nos

16

10.09.14

15.09.14

16

16

100%

53

Supply of Position light shunt signal


unit without lenses, lamps & lamps
holder unit for dependent type
shunt signal drgno. SA-23840 (Adv)
Alt.1 & S-23845 (Adv)

Nos

10.09.14

15.09.14

100%

54

Supply of universal lock with key


( Godrej make 7 Lever) for signal
units and loc box

Nos

30

10.09.14

15.09.14

30

30

100%

55

For Red aspect

Nos

11.12.14

15.12.14

100%

56

For Yellow aspect

Nos

11.12.14

15.12.14

100%

90of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

57

For Green aspect

Nos

11.12.14

15.12.14

58

AC LIT LED signal lighting unit for


shunt signal as per RDSO Spn no.
RDSO/Spn/153/ 2004 rev 3 or latest
and to RDSO drawing no. SA-23840.

Nos

50

1.11.14

59

AC LIT LED signal lighting unit for


calling-ON signal as per
RDSO/Spn/153/2004 rev 3 or latest
and RDSO drawing no. SA-24351

Nos

60

AC LIT LED signal lighting unit


forRoute indicator as per RDSO Spn
no. RDSO/Spn/153/ 2004 rev 3 or
latest

Nos

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

100%

10.11.14

50

50

100%

1.11.14

10.11.14

100%

1.11.14

10.11.14

100%

91of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

61

62

63

64

65

66

67

68

69

70

71

72

73

Description
Supply of Track feed battery charger
110V AC/2-6 V DC - 3 amp charging
rate suitable to charge 1,2 or 3 cells
of 80 AH, to IRS-S-89/93 amndt-2 or
latest.
Supply of adjustable Track Feed
Resistance (Disc type) 30 ohms as
per RDSO Drg. No. SA 20166/M
(Adv) with latest amendments (with
Phenolic moulded base).
Supply of Lead acid low
maintenance secondary cells of 80
Supply
of Track
Juction Boxes
AH as per
RDSOLead
specification
as
per Drg. No.RST-C-11509 or
No.IRS-S-88/93.
latest, made of fibre glass along
with one way terminal blocks, fixing
angles, pipe etc.Channel bond pin
Supply of Relay DC track plug in
single groove. tinned or zinc coated
type neutral, 9 ohms, tractive
7mm dia.& G.I.Bond wire to be
armature 2 F/1B with front contracts
supplied by contractor under
metal to carbon (QTA 2 type)
execution item.
complete with plug board, retaining
clip and connector to BRS-939A, and
BRS-966(appendix F-2), IRS-S-34/68
& IRS-S-23/86. Interlocking code
Supply of QSPA1 Relays with base
F,G,H,K,X.
and clips complete as per RDSO
Supply of Electrical point machine
specifications.
heavy duty nontrailable rotary
locking type complete with cable
terminalofbox
as machine
per IRS-S-24/2002
Supply
Point
ground
with Amendment-1
or latest,for
connection
for universal
IRS type
ordinary
switches
with throw
of 143
point
machine
complete
(5 rods)
as
mm.drg
Machines
operate
on 110 V
per
no. (I) SA
8805 (II)
DC.
RDSO/S/3273
(III) RDSO/S/3271 (IV)
RDSO/S/3267 (V) RDSO/S/3269,
switch extension bracket
RDSO/S/3264 & drive lug S 8806.
Supply
of Location
box
- FULLfor
as
[Including
insulation
material
per
Drg.No.W.Rly/SW/47/68SWS/GKC
other accessories of point machine
SINGLE
complete
with `E' type lock
and gauge
type plate]
& keys , 1key for every five appratus
cases to be supplied.
Supply of Location box - HALF as
per Drg.No.W.Rly/SW/47/68SWS/GKC
HALF complete with `E' type lock &
keys , 1key for every five appratus
cases to be supplied.
Supply of Fuse block PBT base with
ND FUSE 2AMP,10AMP & 16AMP as
per drawing no. SA-23748, ALT, 4
and IRS:S-75/2006 (REV-2) or latest.
Supply of ARA Terminal blocks made
of PBT as per Drg.No.SA- 23741 Alt.6
& Specn No.IRS/S-75/2006 (Rev.2 or
with latest amendments with
disconnecting links as per drg no.
Supply
of push button type single
RST/11336.
line block instrument with UFSBI
(without SSDAC) as per Railway
standard IRS:S/104 /2011 (1 Sets
each 2 nos Block System) With
Block Table as per requirement.

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

Nos

20

25.10.14

31.10.14

20

20

100%

Nos

20

10.09.14

15.09.14

20

20

100%

Nos

40

1.11.14

10.11.14

40

40

100%

Nos

50

10.09.14

15.09.14

50

50

100%

Nos

20

10.09.14

15.09.14

20

20

100%

Nos

20

10.09.14

15.09.14

20

20

100%

Nos

18

10.09.14

15.01.15

15

15

83%

Nos

18

10.09.14

15.01.15

15

15

83%

Nos

40

10.09.14

15.09.14

40

40

100%

Nos

30

10.09.14

15.09.14

30

30

100%

Nos

200

10.10.14

25.10.14

200

200

100%

Nos

0%

Set

15.09.14

25.09.14

100%

92of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

74

75

76

77

78

79

80

81

Description
Supply of Multi Section Digital Axle
Counter for 6 track circuits with
Supply of Single Section Digital
complete 10 detection points as per
Axlecounter as per
RDSO Specification (M/S Siemens
RDSOSpecification
make) complete with standard Tool
No.RDSO/SPN/177/2003 (Ver.1)with
Kit with each set. Equipments
Amendment-2 & Manufacturer's
complete with associated
specification.(M/S Eldyne make)
equipments and Fixtures.
complete with standard Tool Kit with
each set.and (a)High frequency Tx
and Rx coils=2 sets(each set
Supply of 8-Way Terminal Block
consists of web mounting type 02
made
of of
PBT(isolating
type) Office
as per
Supply
Station
Manager
nos.Tx and
2 nos.Rx
coils.) with
Spec.
No.
IRS/S-79/92
Amndt.Furniture
Fixtures. (b) Track side Digital Axle
1andDRG No:SA 24811 (Alt 2) with
Counter Equipments complete with
latest amendment
or ofChair
latestofRDSO
A) Office
associated
equipments
and Fixtures.
Supply
of
Fire
Alarm
System
specification
continuous arms having cushened
control
com
indication
panel
seats and rest T.W. Arm rest size 36"
equipped
4 zone
cards
together
x 21" x 22with
approx
steel
tubular
with
electronic
hooter
and
all
other
frame gauge of the pipes 25mm
dia
acceccories.
x 18 gauge with olive green colours,
Green stove enamelled "Indian
Supply
Fire Alarm System
smoke
Make". of
Godrej/Jalaram
Make.-=
4
detectoroptical
Apollo
make
nos
B) Office Table
of size of table top 1220 mm x
610mm height 750mm with
laminated top with 3 drawers on the
Fire Extingusher
left hand side and one locker on the
right hand side olive brown
withDuplicate keys. Olive green
colour Godrej Make. = 2 nos
C) Plain storage almirah with 4
adjustable shelves size 1980mm
height, 915mm width, 485mm
Supply
of MS Termination
Box with
depth, Godrej
Make. = 1nos
fitting for Point Machine(ME34)
D) Airy
Revolving and tilting working
cushioned adjustable height chair
with arm rests, polished black.The
chair has plastic caned seat and
back on 25 mmround tubular frame.
The base is of pressedsheet metal.
Godrej/ Allwyn/ Chandan/ Khira
make.Width 700 mm,Depth 700
mm, Height 870 mm, Adjustable
seat height 410 mm to 520 mm,
Colour Grey. = 1 nos
E) Maintenance
stool for Relay room & Battery room

Unit

Actual Dates

PLAN

ACTUAL
% Complete

Backlog

100%

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

Cummulative

Set

15.12.14

20.12.14

Set

10.10.14

30.10.14

100%

Nos

0%

Nos

25.10.14

30.10.14

100%

Nos

12

25.10.14

30.10.14

12

12

100%

Nos

01.01.15

10.01.15

0%

Set

01.01.15

15.01.15

0%

Nos

18

15.12.14

25.12.14

0%

93of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

82

Supply of Indication fuse G-type 0.6


Amps(system engineer Make) with
fuse insert

Nos

83

Supply of Indication fuse G-type 1.6


Amps(system engineer Make) with
fuse insert

84

85

86

Supply of MAINTENENCE FREE


SINGLE EARTH: to connect
Supply of D-type fuse with fuse
equipotential bus bar in Relay room
insert 6 Amps
and master earth electrode in pair
for redundancyInstallation of
MAINTENENCE FREE SINGLE EARTH
involving digging the earth to the
required depth, Insertion of 4 Nos.
Design,
fabrication
& Supply ofusing
Fuse
electrodes,
Joining electrodes
Failure
forEnhancing
monitoring
coupler,Alarm
FillingSystem
of Earth
health
of various
typetermination
of fuses with
compound,
electrode
in
automatic
changeover
facility
a concrete sink and routing
thealong
with
audiocable
and visual
as
cadmium
to busindications
bar in
per
Railwayroom.
Practice. As per Station
equipment
Requirement .

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Start

Finish

Cummulative

200

25.10.14

30.10.14

200

200

100%

Nos

600

25.10.14

30.10.14

600

600

100%

Nos

20

25.10.14

30.10.14

20

20

100%

Nos

21

10.11.14

20.11.14

21

21

100%

LSM

15.12.14

31.12.14

0%

87

Point machine helth monitering unit

set

15.12.14

31.12.14

0%

88

maintanance tool kit

set

15.12.14

15.01.15

0%

89

BSLB,calling on,shghting boards

Nos

10.09.14

30.09.14

100%

90

P', 'C'. G, MARKER , SINAL PLATE

Nos

27

10.09.14

15.09.14

27

27

100%

91

Tool kit for MSDAC

Nos

10.12.14

20.12.14

100%

92

Tool kit for SSDAC

Nos

25.10.14

30.10.14

100%

93

0.9mm dia, 6 quad cable

km

18.28

20.11.14

25.12.14

10

10

55%

94

10 pairPIJF cable

mtr

500

25.11.14

25.12.14

0%

94of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

95

20 pairPIJF cable

mtr

500

25.11.14

25.12.14

0%

96

10 pairPIJF cable, S. B. cable

mtr

500

25.11.14

25.12.14

0%

97

10 pairPIJF cable, S. B. Cable

mtr

500

25.11.14

31.12.14

0%

98

VF transfer (470:11200

Nos

20

25.10.14

30.10.14

20

20

100%

99

10/20 pair C.T box

Nos

10.09.14

15.09.14

100%

100

10 pair C.T box

Nos

10.09.14

15.09.14

100%

101

5 pair C.T box

Nos

10.09.14

15.09.14

100%

102

Thermo shrinkable jointing kit

Nos

10

25.10.14

30.10.14

10

10

100%

103

one quad VF 2T transferformer

Nos

30

25.10.14

30.10.14

30

30

100%

104

Thermo shrinkable jointing kit

Nos

10

25.10.14

30.10.14

10

10

100%

105

DTMF 4wire way station

Nos

25.10.14

30.10.14

100%

106

Emergancy socket box

Nos

10

25.10.14

30.10.14

10

10

100%

95of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

107

Electronic Magnto phone

Nos

25.10.14

30.10.14

100%

108

BSNL railway phone

Nos

25.10.14

30.10.14

100%

109

RCC cable route marker

Nos

150

01.12.14

15.12.14

150

150

100%

110

5 watt VHF

Nos

15.12.14

15.01.15

0%

111

VHF Trans recever 25 watt

Nos

15.12.14

15.01.15

0%

112

Earth electrode

Nos

15.12.14

15.01.15

0%

113

G.I pipe 100mm dia

mtr

50

10.9.14

20.10.14

50

50

100%

114

VSET equipment

Nos

115

FOIS equipment

Nos

116

Measureing Equipment, tool kit

Nos

11.12.14

15.12.14

100%

117

OFC 24 fiber

Km

8.948

1.10.14

15.10.14

8.948

8.948

100%

118

FDMS

Nos

11.12.14

15.12.14

100%

150

96of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

119

2MB programable digital multiplexer

Nos

15.12.14

15.01.15

0%

120

MUX card 2W/4W

Nos

15.12.14

15.01.15

0%

121

2W subscriber loop card

Nos

15.12.14

15.01.15

0%

122

2W subscriber loop card

Nos

15.12.14

15.01.15

0%

123

DC operated STM-1 ADM to STM 4

Nos

10.11.14

20.11.14

100%

97of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Dec '14

15-Dec-14
Revised Plan Dates

Sr. No

Description

Unit

Actual Dates

PLAN

ACTUAL

Total Scope
Start

Finish

Start

Finish

Today

Cummulative

Today

% Complete

Backlog

Cummulative

124

HDPE decu 40/33

KM

10

1.10.14

10.10.14

10

10

100%

125

Krone cable distribution frame

Nos

10.10.10

20.10.14

100%

126

Cable termination panel rack

Nos

10.10.10

20.10.14

100%

127

Mechnical splice OFC

Nos

10.10.14

20.10.14

100%

128

2x24fiber optic fiber splice SJC

Nos

10.10.14

20.10.14

100%

129

Patch card Fcto PC connector

Nos

20

15.12.14

15.01.15

0%

130

Maintanancc free VARLA secondary


cells

Set

10.10.14

20.11.14

100%

131

48V, 50 amp. Battery charger

Nos

10.10.14

20.10.14

100%

132

Pig tail cable i 10 mtr lenth

Nos

50

15.12.14

15.01.15

0%

133

19" coverd rack

Nos

10.10.14

20.10.14

100%

134

Supply of One Route arm with 4 LED


units

Nos

01.01.15

15.01.15

0%

98of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Only base Plate


received

Only base Plate


received

Only base Plate


received

Only base Plate


received

Only base Plate


received

99of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Only base Plate


received

100of221

Plan
Next day

Remarks
(manpower, weather,
issues)

101of221

Plan
Next day

Remarks
(manpower, weather,
issues)

102of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Material recd. On
12/12/14

103of221

Plan
Next day

Material recd. On
Remarks
12/12/14
(manpower, weather,
issues)

104of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Item Deleated

105of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Item Deleated

106of221

Plan
Next day

Remarks
(manpower, weather,
issues)

107of221

Plan
Next day

Remarks
(manpower, weather,
issues)

108of221

Plan
Next day

Remarks
(manpower, weather,
issues)

Material recd. On
12/12/14

Material recd. On
12/12/14

Material recd. On
12/12/14

109of221

Plan
Next day

Remarks
(manpower, weather,
issues)

110of221

Plan
Next day

Remarks
(manpower, weather,
issues)

111of221

Daily Progress Report - Execution work for S & T - Tuna


Project :- S & T work for AKBTPL, Tuna
Name of Conractor :- Vijaywargi Infra Engineers Pvt. Ltd.

Month: Decmber'14
Revised Plan Dates
Sr.No.
1

Discription
RELAY RACK

Unit

QTY

Start

Finish

Nos

15

25.8.14

01.09.14

Plan/
Actual

Planned
Actual

CABLE TERMINATION RACK

Nos

25.8.14

01.09.14

Planned
Actual

TOG BLOCK 200-WAY,DWG:IRSS77-2006

Nos

150

15.09.14

20.09.14

Planned
Actual

TAG BLOCK,96 WAY,DWG:IRS:S77-2006 R-1

Nos

15

15.09.14

20.09.14

Planned
Actual

Wago or similar terminal

Nos

8500

05.10.14

10.10.14

Planned
Actual

Point Group

Nos

11

28.10.14

10.11.14

Planned
Actual

Signal Group -3 Aspect

Nos

01.12.14

31.12.14

Planned
Actual

Signal Group -2 Aspect

Nos

01.12.14

31.12.14

Planned
Actual

Shunt Signal Group

Nos

12

01.12.14

31.12.14

Planned
Actual

10

Route Group

Nos

10

01.12.14

31.12.14

Planned
Actual

11

Chain Group

Nos

01.12.14

31.12.14

Planned
Actual

12

DC neutral line Relay Mini Group


6F/2B, 5F/3B, 4F/4B

Nos

400

01.12.14

30.11.14

Planned
Actual

13

Plug in type Interlocked relay


4F/4B

Nos

120

28.10.14

10.11.14

Planned

Sr.No.

Discription

Unit

QTY

Start

Finish
Actual

14

Key Lock Relay

Nos

10

28.10.14

10.11.14

Planned
Actual

15

Time Element Relay AG Timer

Nos

15

20.09.14

25.09.14

Planned
Actual

16

Fail Safe Electronic Relay 60


Flasher

Nos

28.10.14

10.11.14

Planned
Actual

17

Q' series ECRs Relays

Nos

01.12.14

31.12.14

Planned
Actual

18

Lamp providing Relay for junction


type Lamp Route indicatar

Nos

01.12.14

31.12.14

Planned
Actual

19

Prewired crank handle cum key


lock relay box suitable for 6 crank
handle rel

Nos

01.12.14

31.12.14

Planned
Actual

20

Supply of 25 sq.mm (To be used


for power wiring)

km

0.2

01.12.14

31.12.14

Planned
Actual

21

Supply of 16 sq.mm (To be used


for power wiring)

km

01.10.14

10.10.14

Planned
Actual

22

Supply of 10 sq.mm (To be used


for power wiring)

km

01.12.14

31.12.14

Planned
Actual

23

Supply of 6 sq.mm (To be used for


power wiring)

km

01.10.14

10.10.14

Planned
Actual

24

Supply of 3 x 0.7 sq.mm.


(Red/Black) ( For circuit wiring in
Loc Boxes)

km

01.10.14

10.10.14

Planned
Actual

25

Supply of Indoor PVC Flexible 16 x


0.23mm.(Red/Black) ( For Realy
base wiring in Loc Boxes)

km

10

01.10.14

10.10.14

Planned
Actual

26

Signalling indoor multi core cable


0.6 mm dia. - 60 core

km

09.09.14

18.09.14

Planned
Actual

Sr.No.

Discription

Unit

QTY

Start

Finish

27

Signalling indoor multi core cable


0.6 mm dia. - 40 core

km

09.09.14

18.09.14

Planned
Actual

28

IndoorJumper Wire ATC 1 x 1 mm


dia in various colors

km

01.10.14

10.10.14

Planned
Actual

29

Signalling indoor multi core


cable1.0mm dia. 24 core

30

'Indoor Jumper Wire of various


colour as per Railways standard
practice of type ATC 1 x 0.6 mm
dia.

km

Resisters, condencer, Diode,


LEDs,,LUGS

LSM

31

km

01.12.14

31.12.14

Planned
Actual

45

01.12.14

31.12.14

Planned
Actual

01.12.14

31.12.14

Planned
Actual

32

LED type,Operating cum


Indication Panel

Nos

01.01.15

15.01.15

Planned
Actual

33

Networked Data Logger

Nos

15.12.14

31.12.14

Planned
Actual

34

Integrated Power(IPS) SMPS

Nos

15.12.14

31.12.14

Planned
Actual

35

autochange over panel for 3


incoming 63 Amp

Nos

09.09.14

15.09.14

Planned
Actual

36

Hylum Sheet in size of


860x100x10mm

Nos

200

05.09.14

10.09.14

Planned
Actual

37

Hylum Sheet in size of


385x100x10mm

Nos

70

05.09.14

10.09.14

Planned
Actual

38

Hylum Sheet in size of 2.72


mx1.22mx18mm

Nos

05.09.14

10.09.14

Planned
Actual

39

2 core x 2.5 sq.mm. in drum


length of 1 Km.

KM

5.085

01.10.14

15.10.14

Planned
Actual

40

6 core x 1.5 sq.mm.

KM

8.117

01.10.14

15.10.14

Planned
Actual

Sr.No.
41

Discription
12 core x 1.5 sq.mm.

Unit

QTY

Start

Finish

KM

43.352

01.10.14

15.10.14

Planned
Actual

42

30 core x 1.5 sq.mm. in drum


length of 500 mtr

KM

23.194

01.10.14

15.10.14

Planned
Actual

43

Aluminium conductor power PVC


insulated as per IRS-S:63/2007 &
IS 1554. - 2 core x 25 sq.mm.

KM

16.5

01.10.14

15.10.14

Planned
Actual

45

DWC pipe

mtr

500

01.10.14

15.10.14

Planned
Actual

46

Colour light signal - 2 aspect

Nos

10.09.14

15.09.14

Planned
Actual

47

Off-set Bracket 140mm dia..

Nos

10.09.14

15.09.14

Planned
Actual

48

Calling/on Signal

49

Supply of Colour light signal - 3


aspect as per drg.No.SA - 23003
A/M (adv.) alt.8 & Specn. IRS-S23/86 & 26/64 having following
items :

Nos

Supply of OFF set bracket of shunt


signal for 90mm dia

Nos

50

Nos

10.09.14

15.09.14

Planned
Actual

10.09.14

15.09.14

Planned
Actual

10.09.14

15.09.14

Planned
Actual

51

Supply of Junction type route


indicator units for one route.(Set
of 5 LED units each.)

Nos

10.09.14

15.09.14

Planned
Actual

52

53

54

Supply of Independent shunt


signals complete having following
items.
Supply of Position light shunt
signal unit without lenses, lamps
& lamps holder unit for dependent
type shunt signal drgno. SA-23840
(Adv) Alt.1 & S-23845 (Adv)
Supply of universal lock with key
( Godrej make 7 Lever) for signal
units and loc box

Nos

16

10.09.14

15.09.14

Planned
Actual

Nos

10.09.14

15.09.14

Planned
Actual

Nos

30

10.09.14

15.09.14

Planned
Actual

55

For Red aspect

Nos

11.12.14

15.12.14

Planned
Actual

56

For Yellow aspect

Nos

11.12.14

15.12.14

Planned

Sr.No.

Discription

Unit

QTY

Start

Finish
Actual

57

58

59

60

61

62

63

64

65

66

67

68

69

70

For Green aspect


AC LIT LED signal lighting unit for
shunt signal as per RDSO Spn no.
RDSO/Spn/153/ 2004 rev 3 or
latest and to RDSO drawing no.
SA-23840.
AC LIT LED signal lighting unit for
calling-ON signal as per
RDSO/Spn/153/2004 rev 3 or
latest and RDSO drawing no. SA24351
AC LIT LED signal lighting unit
forRoute indicator as per RDSO
Spn no. RDSO/Spn/153/ 2004 rev
3 or latest
Supply of Track feed battery
charger 110V AC/2-6 V DC - 3 amp
charging rate suitable to charge
1,2 or 3 cells of 80 AH, to IRS-S89/93 amndt-2
or latest.
Supply
of adjustable
Track Feed
Resistance (Disc type) 30 ohms as
per RDSO Drg. No. SA 20166/M
(Adv) with latest amendments
(with Phenolic moulded base).
Supply of Lead acid low
maintenance secondary cells of 80
Supply
of Track
Juction Boxes
AH as per
RDSOLead
specification
as
per
Drg.
No.RST-C-11509
or
No.IRS-S-88/93.
latest, made of fibre glass along
with one way terminal blocks,
fixing angles, pipe etc.Channel
Supply of Relay DC track plug in
bond pin single groove. tinned or
type neutral, 9 ohms, tractive
zinc coated 7mm dia.& G.I.Bond
armature 2 F/1B with front
wire to be supplied by contractor
contracts metal to carbon (QTA 2
under execution item.
type) complete with plug board,
retaining clip and connector to
BRS-939A, and BRS-966(appendix
F-2), IRS-S-34/68 & IRS-S-23/86.
Supply
of QSPA1
with base
Interlocking
code Relays
F,G,H,K,X.
and clips complete as per RDSO
specifications.
Supply of Electrical point machine
heavy duty nontrailable rotary
locking type complete with cable
terminalofbox
as machine
per IRS-S-24/2002
Supply
Point
ground
with Amendment-1
or latest,for
connection
for universal
IRS type
ordinary
switches
with throw
of
point
machine
complete
(5 rods)
143per
mm.
as
drg Machines
no. (I) SA operate
8805 (II)on
110
V DC.
RDSO/S/3273
(III) RDSO/S/3271
(IV) RDSO/S/3267 (V)
RDSO/S/3269, switch extension
bracket RDSO/S/3264 & drive lug
Supply
of Locationinsulation
box - FULL as
S 8806.[Including
per
material for other accessories of
Drg.No.W.Rly/SW/47/68SWS/GKC
point machine and gauge type
SINGLE
plate] complete with `E' type
lock & keys , 1key for every five
Supply
of cases
Location
box
- HALF as
appratus
to be
supplied.
per
Drg.No.W.Rly/SW/47/68SWS/GKC
HALF complete with `E' type lock
& keys , 1key for every five
appratus cases to be supplied.

Nos

11.12.14

15.12.14

Planned
Actual

Nos

50

1.11.14

10.11.14

Planned
Actual

Nos

1.11.14

10.11.14

Planned
Actual

Nos

1.11.14

10.11.14

Planned
Actual

Nos

20

25.10.14

31.10.14

Planned
Actual

Nos

20

10.09.14

15.09.14

Planned
Actual

Nos

40

1.11.14

10.11.14

Planned
Actual

Nos

50

10.09.14

15.09.14

Planned
Actual

Nos

20

10.09.14

15.09.14

Planned
Actual

Nos

20

10.09.14

15.09.14

Planned
Actual

Nos

18

10.09.14

15.01.15

Planned
Actual

Nos

18

10.09.14

15.01.15

Planned
Actual

Nos

40

10.09.14

15.09.14

Planned
Actual

Nos

30

10.09.14

15.09.14

Planned

Sr.No.

71

72

73

74

75

76

77

78

79

80

81

82

83

84

Discription

Supply of Fuse block PBT base


with ND FUSE 2AMP,10AMP &
16AMP as per drawing no. SA23748, ALT, 4 and IRS:S-75/2006
(REV-2)
orARA
latest.
Supply of
Terminal blocks
made of PBT as per Drg.No.SA23741 Alt.6 & Specn No.IRS/S75/2006 (Rev.2 or with latest
amendments
withbutton
disconnecting
Supply
of push
type
links asline
perblock
drg no.
RST/11336.
single
instrument
with
UFSBI (without SSDAC) as per
Railway
standard
IRS:S/104
/2011
Supply of
Multi Section
Digital
(1
Sets
each
2
nos
Block
System)
Supply
of Single
Digital
Axle Counter
for Section
5 track circuits
With
Block Table
as
per
Axlecounter
as10
per
with complete
detection
points
requirement.
RDSOSpecification
as per RDSO Specification (M/S

No.RDSO/SPN/177/2003
Siemens make) complete with
(Ver.1)with
Amendment-2
standard Tool
Kit with each&set.
Manufacturer's
specification.(M/S
Equipments complete
with
Eldyne
make)
complete and
with
associated
equipments
standard
Fixtures. Tool Kit with each
set.and (a)High frequency Tx and
Rx coils=2 sets(each set consists
Supply
of 8-Way Terminal
Block
of web mounting
02 nos.Tx
Supply
of Stationtype
Manager
Office
made
of
PBT(isolating
type)
as per
and 2 nos.Rx coils.) with Fixtures.
Furniture
Spec.
No.
IRS/S-79/92
Amndt.(b) Track side Digital Axle Counter
1andDRG
No:SA
24811with
(Alt 2) with
Equipments
complete
A) Office Chair
latest
amendment
or
of
latest
associated
equipments
and
of
continuous
arms having
RDSO
specification
Supply
of
Fire
Alarm
System
Fixtures. seats and rest T.W.- Arm
cushened
control
rest sizecom
36"indication
x 21" x 22panel
approx
equipped
with
4 zone
cardsof the
steel tubular frame
gauge
together
withdia
electronic
hooter
pipes 25mm
x 18 gauge
with
and
all
other
acceccories.
olive green colours, Green stove
enamelled
"Indian
Make".
Supply of Fire
Alarm
System Godrej/Jalaram
Make. =Apollo
4 nos
smoke detectoroptical
B) Office Table of size
make
of table top 1220 mm x 610mm
height 750mm with laminated top
with 3 drawers on the left hand
Fire Extingusher
side
and one locker on the right
hand side olive brown
withDuplicate keys. Olive green
colour Godrej Make. = 2 nos
C) Plain storage almirah with
4 adjustable shelves size 1980mm
height, 915mm width, 485mm
depth, Godrej
Make. = 1nos
Supply
of MS Termination
Box
with fitting for Point
D) Airy
Machine(ME34)
Revolving and tilting working
cushioned adjustable height chair
Supply
Indication
fuseblack.The
G-type
with
armofrests,
polished
0.6
Amps(system
engineer
chair
has plastic caned
seatMake)
and
with
insert
back fuse
on 25
mmround tubular
frame. The base is of
pressedsheet
metal.fuse
Godrej/
Supply of Indication
G-type
Allwyn/
Chandan/
Khira
1.6 Amps(system engineer Make)
make.Width
700 mm,Depth 700
with fuse insert
mm, Height 870 mm, Adjustable
seat height 410 mm to 520 mm,
Colour Grey. = 1 nos
Supply of D-type fuse with fuse
E) Maintenance
insert 6 Amps
stool for Relay room & Battery
room

Unit

QTY

Start

Finish
Actual

Nos

200

10.10.14

25.10.14

Planned
Actual

Nos

Planned
Actual

Set

15.09.14

25.09.14

Planned
Actual

Set

15.12.14

20.12.14

Planned
Actual

Set

10.10.14

30.10.14

Planned
Actual

Nos

Planned
Actual

Nos

25.10.14

30.10.14

Planned
Actual

Nos

12

25.10.14

30.10.14

Nos

01.01.15

10.01.15

Planned
Actual

Set

01.01.15

15.01.15

Planned
Actual

Nos

18

15.12.14

25.12.14

Planned
Actual

Nos

200

25.10.14

30.10.14

Planned
Actual

Nos

600

25.10.14

30.10.14

Planned
Actual

Nos

20

25.10.14

30.10.14

Planned

Supply of MAINTENENCE FREE


SINGLE EARTH: to connect
Sr.No. equipotential
Discription
bus bar in Relay
room and master earth electrode
in pair for redundancyInstallation
of MAINTENENCE FREE SINGLE
EARTH involving digging the earth
85
to the required depth, Insertion of
4
Nos. electrodes,
Design,
fabricationJoining
& Supply of
electrodes
coupler,
Fuse Failureusing
Alarm
SystemFilling
for of
Earth
Enhancing
compound,
monitoring health of various type
electrode
termination
in a
of fuses with
automatic
86
concrete
sink
and
routing
the
changeover facility along with
cadmium
bus bar inas per
audio
andcable
visualtoindications
equipment
room. As per Station
Railway
Practice.
Requirement .
87
Point machine helth monitering unit

Unit

QTY

Start

Finish
Actual

Nos

21

10.11.14

20.11.14

Planned
Actual

LSM

15.12.14

31.12.14

Planned
Actual

set

15.12.14

31.12.14

Planned
Actual

88

maintanance tool kit

set

15.12.14

15.01.15

Planned
Actual

89

BSLB,calling on,shghting boards

Nos

10.09.14

30.09.14

Planned
Actual

90

P', 'C'. G, MARKER , SINAL PLATE

Nos

27

10.09.14

15.09.14

Planned
Actual

91

Tool kit for MSDAC

Nos

10.12.14

20.12.14

Planned
Actual

92

Tool kit for SSDAC

Nos

25.10.14

30.10.14

Planned
Actual

93

0.9mm dia, 6 quad cable

km

18.28

20.11.14

25.12.14

Planned
Actual

94

10 pairPIJF cable

mtr

500

25.11.14

25.12.14

Planned
Actual

95

20 pairPIJF cable

mtr

500

25.11.14

25.12.14

Planned
Actual

96

10 pairPIJF cable, S. B. cable

mtr

500

25.11.14

25.12.14

Planned
Actual

97

10 pairPIJF cable, S. B. Cable

mtr

500

25.11.14

31.12.14

Planned
Actual

98

VF transfer (470:11200

Nos

20

25.10.14

30.10.14

Planned
Actual

Sr.No.

99

Discription

10/20 pair C.T box

Unit

QTY

Start

Finish

Nos

10.09.14

15.09.14

Planned
Actual

100

10 pair C.T box

Nos

10.09.14

15.09.14

Planned
Actual

101

5 pair C.T box

Nos

10.09.14

15.09.14

Planned
Actual

102

Thermo shrinkable jointing kit

Nos

10

25.10.14

30.10.14

Planned
Actual

103

one quad VF 2T transferformer

Nos

30

25.10.14

30.10.14

Planned
Actual

104

Thermo shrinkable jointing kit

Nos

10

25.10.14

30.10.14

Planned
Actual

105

DTMF 4wire way station

Nos

25.10.14

30.10.14

Planned
Actual

106

Emergancy socket box

Nos

10

25.10.14

30.10.14

Planned
Actual

107

Electronic Magnto phone

Nos

25.10.14

30.10.14

108

BSNL railway phone

Nos

25.10.14

30.10.14

Planned
Actual

109

RCC cable route marker

Nos

150

01.12.14

15.12.14

Planned
Actual

110

5 watt VHF

Nos

15.12.14

15.01.15

Planned
Actual

111

VHF Trans recever 25 watt

Nos

15.12.14

15.01.15

Planned
Actual

112

Earth electrode

Nos

15.12.14

15.01.15

Planned
Actual

113

G.I pipe 100mm dia

mtr

50

10.9.14

20.10.14

Planned

Sr.No.

Discription

Unit

QTY

Start

Finish
Actual

114

VSET equipment

Nos

Planned
Actual

115

FOIS equipment

Nos

Planned
Actual

116

Measureing Equipment, tool kit

Nos

11.12.14

15.12.14

Planned
Actual

117

OFC 24 fiber

Km

8.948

1.10.14

15.10.14

Planned
Actual

118

FDMS

Nos

11.12.14

15.12.14

Planned
Actual

119

2MB programable digital


multiplexer

Nos

15.12.14

15.01.15

Planned
Actual

120

MUX card 2W/4W

Nos

15.12.14

15.01.15

Planned
Actual

121

2W subscriber loop card

Nos

15.12.14

15.01.15

Planned
Actual

122

2W subscriber loop card

Nos

15.12.14

15.01.15

Planned
Actual

123

DC operated STM-1 ADM to STM 4

Nos

10.11.14

20.11.14

Planned
Actual

124

HDPE decu 40/33

KM

10

1.10.14

10.10.14

Planned
Actual

125

Krone cable distribution frame

Nos

10.10.10

20.10.14

Planned
Actual

126

Cable termination panel rack

Nos

10.10.10

20.10.14

Planned
Actual

127

Mechnical splice OFC

Nos

10.10.14

20.10.14

Planned
Actual

Sr.No.
128

Discription
2x24fiber optic fiber splice SJC

Unit

QTY

Start

Finish

Nos

10.10.14

20.10.14

Planned
Actual

129

Patch card Fcto PC connector

Nos

20

15.12.14

15.01.15

Planned
Actual

130

Maintanancc free VARLA


secondary cells

Set

10.10.14

20.11.14

Planned
Actual

131

48V, 50 amp. Battery charger

Nos

10.10.14

20.10.14

Planned
Actual

132

Pig tail cable i 10 mtr lenth

Nos

50

15.12.14

15.01.15

Planned
Actual

133

19" coverd rack

Nos

10.10.14

20.10.14

Planned
Actual

134

Supply of One Route arm with 4


LED units

Nos

01.01.15

15.01.15

Planned
Actual

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

15

15

150

150

15

15

4200

4300

8500

11

12

10

100

275

25

375

40

80

PLAN- Up to
date

Actual Recd.Up to date

15
15
2
2
150
150
15
15
8500
8500
11
11
2
0
3
0
12
0
10
0
2
0
400
375
120

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

120

10

15

15

0.2

0.982

2.964

4.964

10

9.997

2.975

PLAN- Up to
date

Actual Recd.Up to date


120

10
10
15
15
3
3
8
0
2
0
2
0
0.2
0
1
0.982
2
0
3
2.964
5
4.964
10
9.997
3
2.975

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

5.994

45

200

200

70

70

5.085

8.117

PLAN- Up to
date

Actual Recd.Up to date

3
3
6
5.994
2
0
45
0
1
0
1
0
1
0
1
0
1
1
200
200
70
70
5
5
5
5.085
8
8.117

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

43

43.352

23

23.194

16.5

16.454

500

498

16

16

30

30

PLAN- Up to
date

Actual Recd.Up to date

43
43.352
23
23.194
16.5
16.454
500
498
3
3
1
1
1
1
2
2
1
1
1
1
16
16
2
2
30
30
5
5
6

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

50

50

20

20

20

20

40

40

50

50

20

20

20

20

15

15

15

15

40

40

30

PLAN- Up to
date

Actual Recd.Up to date


6

3
3
50
50
2
2
7
7
20
20
20
20
40
40
50
50
20
20
20
20
18
15
18
15
40
40
30

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

30

200

200

12

12

18

200

200

600

600

20

PLAN- Up to
date

Actual Recd.Up to date


30

200
200
0
0
1
1
1
1
1
1
0
0
1
1
12
12
4
0
1
0
18
0
200
200
600
600
20

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

20

21

21

27

27

10

8.28

10

500

500

500

500

20

20

PLAN- Up to
date

Actual Recd.Up to date


20

21
21
1
0
1
0
1
0
7
7
27
27
1
1
1
1
18.28
10
500
0
500
0
500
0
500
0
20
20

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

10

10

30

30

10

10

10

10

150

150

50

PLAN- Up to
date

Actual Recd.Up to date

5
5
2
2
2
2
10
10
30
30
10
10
4
4
10
10
8
8
1
1
150
150
5
0
2
0
2
0
50

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

50

8.948

8.948

10

10

PLAN- Up to
date

Actual Recd.Up to date


50

0
0
0
0
1
1
8.948
8.948
2
2
2
0
8
0
2
0
2
0
2
2
10
10
2
2
2
2
4
4

Sept'14

Octo'14

Nov'14

Dec'14

Jan'15

20

50

PLAN- Up to
date

Actual Recd.Up to date

4
4
20
0
2
2
2
2
50
0
2
2
1
0

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

01.12.14

02.12.14

03.12.14

04.12.14

05.12.14

06.12.14

Sunday

08.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

5
5
6

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

6
3
3

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

150
150

16.12.14

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

1
1

2
2

09.12.14

10.12.14

11.12.14

12.12.14

13.12.14

Sunday

15.12.14

16.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

17.12.14

18.12.14

19.12.14

20.12.14

Sunday

22.12.14

23.12.14

24.12.14

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14
0

12

12

10

10

25

25

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

0.2

0.2

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

45

45

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14
0

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

18

18

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

8.28

8.28

500

500

500

500

500

500

500

500

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

150

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14

25.12.14

26.12.14

27.12.14

Sunday

29.12.14

30.12.14

31.12.14

Plan - Dec'14
0

ActualDec'14

01.01.15

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15
0

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15
6

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15
0

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15
0

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15

150

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15
0

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

ActualDec'14

01.01.15

02.01.15

03.01.15

Sunday

05.01.15

06.01.15

07.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

08.01.15

09.01.15

10.01.15

Sunday

12.01.15

13.01.15

14.01.15

15.01.15

20

50

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

16.01.15

17.01.15

Sunday

19.01.15

20.01.15

21.01.15

22.01.15

23.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

24.01.15

Sunday

26.01.15

27.01.15

28.01.15

29.01.15

30.01.15

31.01.15

Plan - Jan'15

ActualJan'15

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15

0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
0
3
0
0
0
0

Plan - Jan'15

ActualJan'15
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
1
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15
0

0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
0
2
0
2
0
0

Plan - Jan'15

ActualJan'15
0

0
0
0
0
1
0
0
0
2
0
2
0
8
0
2
0
2
0
0
0
0
0
0
0
0
0
0
0

Plan - Jan'15

ActualJan'15

0
0
20
0
0
0
0
0
50
0
0
0
1
0

You might also like