You are on page 1of 1

GGU-Software

Report no.:

GGU-RETAIN

www.ggu-software.com
Germany

2897 / 95

Attachment no.:

Example Ranke/Ostermeyer
4

[kN/m]
19.0

Soil

HEB 240

2
0.00

32.3

'

[kN/m]
[]
9.0
32.5

p = 10.0
-0.0

0.0

-36.3

-2

Designation
Sand

-19.9

70.2

-75.2

-6.8

-75.0

6.00

-47.0

-134.8

56.9

-196.3

Anchor 1 (13.50 m, 25.0) (130.9 kN/m) (eta = 1.73)


lp = 5.00 m

-8

-56.1

9.50

-45.5

-10

-242.6

73.5

-289.8

Anchor 2 (12.00 m, 25.0) (145.5 kN/m) (eta = 1.78)


lp = 5.00 m

-12

passive
-1.000

1.1

-4
-6

active
0.667

0.0
-48.4

1.50

c(a)
c(p)
[kN/m] [kN/m]
0.0
0.0

12.50
-0.4

-0.0/32.3

29.9

-5.5

-23.3

-329.5

Anchor 3 (10.50 m, 20.0) (137.9 kN/m) (eta = 1.69)


lp = 5.00 m

-14
GW (15.00)
GW (15.00)
Water
0.0 pres.
0.0
pw [kN/m]

-35.7
eph+pw/eah+pw [kN/m]

-16

0.0

Example Ranke/Ostermeyer
Soldier pile wall
HEB 240
Calculation basis:
Rectangular earth pressure redistribution
Active ep according to: DIN 4085
Equivalent ep coefficient kah [-] = 0.200

-18
-5

-0.0

M [kN*m/m]

10

-317.9

Q [kN/m]

N [kN/m]

Passive ep according to: Streck


Soldier pile width = 0.20 m
Soldier pile centres = 2.00 m
Section length automatic and degree of fixity from 0.000 preset
(passive) = 3.00
Hydraulic gradient (active side) for earth pressure
Hydraulic gradient (passive side) for earth pressure

15

20

2.1
w [mm]
EJ = 1.182E+4 kN*m

15.50 (1)

Embedment depth = 1.90 m Required length = 14.40 m

25

30
HEB 240

You might also like