Designing Of The Tank:

For designing the tank have thickness equal to 300mm (t=300mm)and its
height is 3m (H=3m) and (H2/Dt=2) we will follow the procedure,

First we must find the diameter of the tank

H2
=2
Dt
32
=2
D(0.3)

D=15m

 Design For Wall

P= Sanitary Coefficient X1.7 X Lateral Force

P=1.65 X 1.7 X25

P=70.125 KN/m3

P*R=70.125 X 7.5

P*R=525.9375 KN/m2

This value must be adjusted by (TableA-3)


Point Factor From Ring Tension
Table (A-3)
0.0H +1.253 659

0.1H +1.144 601.67

0.2H +1.041 547.501

0.3H +0.929 488.596

0.4H +0.806 423.906

0.5H +0.667 350.80

0.6H +0.514 270.332

0.7H +0.345 181.448

0.8H +0.188 98.876

0.9H +0.055 28.927

1.0H 0.0 0.0


Tension
1.2

0.8

0.6

0.4

0.2

0
28.92 98.87 181.4 270.3 423.9 488.5 547.5 607.6
0 350.8 659
7 6 48 32 06 96 01 7
1 ‫سلسلة‬ 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0

Maximum Tension=659 KN/m


𝑇
As req.=
0.9 fy

659∗1000
As req.=
0.9∗400

As req.=1830.556 mm2

If we use bars with diameter 16mm

Ab=π*162 /4

Ab=201.06mm2
1830.556
No. of bars=
2∗201.06

No. of bars=4.55 bars

Spacing= 1000/4.55

Spacing=219.78 mm use 210mm

As(prov.) = 2*201.06*(1000/210)
As(prov.) =1914.857 mm2

 Check For Cracking Stress

The stress in concrete must not exceed maximum allowable cracking


stress (approximately 0.1 f'c)

f'c=[C Es As + Tmax(unfactored)/(Ac + nAs)]


Es
n=
Ec
200000
n=
4700√27.5

n=8.11
659∗1000
f'c=(0.0003*200000*1914.857+ )/(300*1000+8.11*1914.857)
1.65∗1.7

f'c=1.159 > 2.75 OK

 Design For Bending Moment

Bending moments in wall strip can be calculated by using (Table A-4)

P= 1.3*1.7*25

P=55.25 KN/m

P*H2 =55.25*9

P*H2 = 497.25 KN.m/m

From (Table A-4) for H2/Dt=2


Point Factor From Moment KN/m
Table (A-4)
0.0H 0.0 0.0

0.1H +0.0010 0.49725

0.2H +0.0036 1.7901

0.3H +0.0066 3.28185

0.4H +0.0088 4.3758

0.5H +0.0089 4.425525

0.6H +0.0059 2.933775

0.7H -0.0019 -0.944775

0.8H -0.0167 -8.30475

0.9H -0.0389 -19.343025

1.0H -0.0719 -35.752275

Max. negative moment (-35.75)

Max. posetive moment (+4.426)

To find reinforcement for max. negative moment

Use Φ=25
𝑑𝑏𝑎𝑟
d=t-cover-
2

d=300-50-16/2

d=242 mm
𝑀𝑢
Ru=
Ø𝑏𝑑2
35.75 X 106
Ru=
0.9∗1000∗2422

Ru=0.678
𝑓𝑦 400
μ= =
0.85 𝑓′𝑐 0.85 27.5

μ=17.112

1 2𝑅𝑢 𝜇
ρ= (1-√1 − )
𝜇 𝑓𝑦

1 2∗0.678∗17.112
ρ= (1-√1 − )
17.112 400

ρ = 0.00172 > ρmin

so we use ρmin

As req. = ρmin*b*t

As req.= 0.0028*1000*300

As req.= 840 mm2/m

If we use Φ 12 mm
𝐴𝑠 𝑟𝑒𝑞.
No. of bars =
𝐴𝑏
840
No. of bars =
𝜋∗62

No. of bars =7.43

Spacing =1000/7.43

Spacing = 134.59 mm/m use 130 mm/m

To find reinforcement for max. positive moment


4.426 X 106
Ru=
0.9∗1000∗2422

Ru= 0.0839
1 2∗0.0839∗17.112
ρ= (1-√1 − )
17.112 400

ρ =0.00021> ρmin

As req.= 840 mm2/m

If we use Φ 12 mm
𝐴𝑠 𝑟𝑒𝑞.
No. of bars =
𝐴𝑏
840
No. of bars =
𝜋∗62

No. of bars =7.43

Spacing =1000/7.43

Spacing = 134.59 mm/m use 130 mm/m

 Check For Shear

√𝑓′𝑐 √27.5 244


ØVc = Ø 𝑏𝑑 = 0.85 *1000* =181.269 KN
6 6 1000

P= 1.3*1.7*25

P=55.25 KN/m

P*H=55.25*3

P*H=165.75 KN/m

From (Table A-12) for H2/Dt=2


Vu=0.37*165.75 =61.3275 KN /m > ØVc OK