SLAB DESIGN
Bending Moments
Ly 5800
= = =1.1
Lx 5400
Bsx = -0.056, 0.042 and Bsy = -0.045, 0.034…………Table 3.14 (BS8110-1)
Msx at mid span = BsxLx² = 0.042 x 11 KN/m² x 5.4² = 13.47 KNm
Msx at support = - BsxLx² = -0.056 x 11 KN/m² x 5.4² = 17.96KNm
Msy at mid span = BsyLx² = 0.034 x 11 KN/m² x 5.4² = 10.91 KNm
Msy at support = BsyLx² = -0.045 x 11 KN/m² x 5.4² = 14.43 KNm
DEFLECTION CHECK.
At mid span moments for short span.
Msx = 13.47KNm
M/bd² = 13.47 x 106 /(1000 x 120²) = 0.94
K = M / fubd² = 13.47 x 106 / (25 x 1000 x 120²) = 0.037
k
√
Z = d ( 0.5 + 0.25−
0.94
)
0.037
√
Z = 120 ( 0.5 + 0.25−
0.94
) = 115
477−267.99
m.f.r = 0.55 + <= 1.49
120(0.9+0.94)
Lx 5400
dmin = = = 139.4mm
m. f . r 26 1.49 x 26
SECOND TRIAL.
Say H = 175mm
Dx = 175 – 25 – 5 = 145mm, Dy = dx – Ø = 145 – 10 = 135mm
The panel have Lx = 5400mm and Ly = 5800mm
Ly 5800
= =1.1 2, hence it is a two way ………………….(BS8110 – 1)
Lx 5400
LOADING.
Self-weight = 1.4 x 0.175 x 24 = 5.88 KN/m²
Finishes = 1.4 x 1.5 = 2.1 KN/m²
Partitions = 1 x 1.4 = 1.4 KN/m²
Total dead load = 9.38 KN/m²
Live load = 1.5 x 1.6 = 2.4 KN/m²
Total design load = 11.78 KN/m² = 12 KN/m²
DEFLECTION CHECK.
At mid span moments for short span.
Msx = 14.7KNm
M/bd² = 14.7 x 106 /(1000 x 145²) = 0.699
K = M / fubd² = 14.7 x 106 / (25 x 1000 x 145²) = 0.028
k
√
Z = d ( 0.5 + 0.25−
0.94
)
0.028
√
Z = 145 ( 0.5 + 0.25−
0.9
) = 140.55
As = M / 0.87fyZ = 14.7 x 106 /( 0.87 x 460 x 140.55) = 261.34 mm²
Provide T10- 275c/c (area = 285 mm²)
477−263.63
m.f.r = 0.55 + <= 1.66
120(0.9+0.699)
Lx 5400
dmin = = = 125.12mm
m. f . r 26 1.66 x 26
REINFORCEMENT DESIGN
Short span.
For mid span provide T10- 275c/c (area = 285 mm²)
For support. K = M / fubd² =19.6 x 106 /(25 x1000 x 145²) = 0.0373 less than 0.156
k
√
Z = d ( 0.5 + 0.25−
0.9
)
0.0373 B1) T10-275c/c
√
Z = 145 ( 0.5 + 0.25−
0.9
) = 138.72
As = M / 0.87fyZ = 19.6 x 106 /( 0.87 x 460 x 138.72) = 353.05 mm²
B2) T8 -220c/c
T1) T10-220c/c
Hence provide T10-220c/c (356 mm²)
T2) T10-250c/c
Long span at Msy = 11.9KNm
For mid span.
The effective depth = 135mm
. K = M / fubd² = 11.9 x 106 /(25 x1000 x 135²) = 0.0261 less than 0.156 hence
okay
k
√
Z = d ( 0.5 + 0.25−
0.9
)
0.0261
√
Z = 135 ( 0.5 + 0.25−
0.9
) = 130.96
As = M / 0.87fyZ = 11.9 x 106 /( 0.87 x 460 x 130.96) = 227.1mm²
Hence provide T8-220c/c (228 mm²)
Hence!!
Maximum bending moments at support = 43KNm
Maximum bending moments at the mid span = 22 KNm
Maximum shear forces = 70 KN
REINFORCEMENT DESIGN AT SUPPORT.
Fcu = 25N/mm², where by b = 230mm
Let Ø = 16mm, link dia = 8mm, cover = 25mm, while h = 400mm.
Ø
Hence d = h - cover – link -
2
d = 400 – 25 – 8 – 8 =359mm
Mr = 0.156Fcubd² = 0.156 x 25 x 230 x 359² = 115.6KNm which is >> Mapp
M 43 x 106
K= = = 0.058 << 0.156
Fcubd ² 25 x 230 x 359²
k
√
Z = d (0.5 + 0.25−
0.9
)
0.058
Hence
√
Z = 359 (0.5 + 0.25−
0.9
) = 0.93d < 0.95d
Z = 0.93d = 333.87
As = M/ (0.87Fyz) = 43 x 10^6 / (0.87 x 460 x 333.87) = 322mm²
Hence provide 2T16 (402.1mm²) Provide
2T16
REINFORCEMENT AT MID SPAN throughou
lz 3600 t the span.
be = bw + = 230 + = 950mm, where by bw = 230mm, hf = 175mm
5 5 Both top
Mf = 0.45Fcu. be . hf(d - hf /2) = 507.8 KNm and
Mf ˃ Mapp ( hence the N-A is within the flange) bottom.
K = M/(fcubd²) = 22 x 10^6/(25 x 950 x 359²) = 0.0072
k
√
Z = d (0.5 + 0.25−
0.9
)
0.0071
√
Z = 359 (0.5 + 0.25−
Z = 0.95d = 341.05
0.9
) = 0.991d > 0.95d
DEFLECTION CHECK.
At mid span moments.
Msx = 22KNm
M/bd² = 22 x 106 /(950 x 359²) = 0.18
K = M / fubd² = 22 x 106 / (25 x 950 x 359²) = 0.0072
k
√
Z = d ( 0.5 + 0.25−
0.94
0.0072
) Deflection
s are
√
Z = d ( 0.5 + 0.25−
Z = 0.95d = 341.05
0.9
) = 0.99d >0.95d okay!!
477−115.26
m.f.r = 0.55 + <= 2 Hence
120(0.9+0.18)
provide
L 3600
dmin = = = 90mm T8 –200c/c
m. f . r 20.8 2 x 20.8
Two
Where by 359mm > 90mm Hence Okay!!!!!!!! legged.
BEAM 6
Preliminary beam dimensioning.
Let the average span of the beams be 10m,
span
Hence the ratio of the continuous beams is given as 26.
depth
Hence roughly 10m/26 = 0.38m say let the depth be 0.40m
Let the depth above be the overall height of the beams, and thickness is 230mm
Hence the beam dimensions will be given as (400 x 230)mm
Hence
√
Z = 359 (0.5 + 0.25−
0.9
) = 0.81d < 0.95d at mid
span.
Z = 0.81d = 290.8
As = M/ (0.87Fyz) = 103.42 x 10^6 / (0.87 x 460 x 290.8) = 888.65mm²
Hence provide 3T20 (942.5mm²)
DEFLECTION CHECK.
At mid span moments.
Msx = 104.38KNm
Provide
M/bd² = 104.38 x 106 /(1290 x 359²) = 0.628
T8-150c/c
K = M / fubd² = 104.38 x 106 / (25 x 1290 x 359²) = 0.0251 Two
k
√
Z = d ( 0.5 + 0.25−
0.94
0.0251
) legged
√
Z = d ( 0.5 + 0.25−
Z = 0.95d = 341.05
0.9
) = 0.97d >0.95d
As = M / 0.87fyZ = 104.38 x 106 /( 0.87 x 460 x 341.05) = 764.75 mm² = area required
Provide 4T16 (area provided = 804.2mm²)
bw 230
Also = = 0.178 < 0.3
be 1290
477−273.3
m.f.r = 0.55 + <= 1.61
120(0.9+0.628)
L 5300
dmin = = = 158.26mm
m. f . r 20.8 1.61 x 20.8
BEAM 13
Preliminary beam dimensioning.
Let the average span of the beams be 10m,
span
Hence the ratio of the continuous beams is given as 26.
depth
Hence roughly 10m/26 = 0.38m say let the depth be 0.40m
Let the depth above be the overall height of the beams, and thickness is 230mm
Hence the beam dimensions will be given as (400 x 230)mm
A SPAN 1 B B SPAN 2 C
Factored UDL(kN/m) 31.74 31.74
Span(m) 2.80 5.80
Stiffness 1.07 0.52
Distribution Factor 0.67 0.33
FEM -31.11 133.47
balance -69.03 -33.33
carry over
balance 0.00 0.00
carry over
balance 0.00 0.00
carry over
balance 0.00 0.00
carry over
balance 0.00 0.00
carry over
balance 0.00 0.00
Support Moment (kNm) 0.00 -100.14 100.14 0.00
Hence!!
Maximum bending moments at support = 100.14KNm
Maximum bending moments at the mid span = 88.09 KNm
Maximum shear forces = 109.31 KN
Hence
√
Z = d (0.5 + 0.25−
0.9
) = 0.82d < 0.95d
Z = 0.82d = 294.38
As = M/ (0.87Fyz) = 100.14 x 10 6 / (0.87 x 460 x 294.38) =850mm²
Hence provide 3T20 (942.5mm²)
477−230.58
m.f.r = 0.55 + <= 1.73
120(0.9+0.84)
L 5800
dmin = = = 161.2mm
m. f . r 20.8 1.73 x 20.8
Asv
Taking the ratio = =0.68 , hence provide T10 – 225 c/c, throughout the span of the
Sv
beam section.
ROOF DESIGN.
C
H
F
D
A B
E G I
Preliminary calculations.
Plan area = 5 x 2 = 10m²
Slope area = 5.7 x 2 = 11.46m²
Weight of purlins
considering soft wood
Purlin = = 0.12KN/m²
Plan area = 10m²
Weight = 0.12 x 10 = 1.2KN
Weight of bracing
= self weight of material x plan area
= 0.12 x 10 = 1.2KN
Total dead loads = 1.2 + 0.667 + 1.2 + 0.573 = 3.64
Hence the dead load will be 3.64KN,
For the pitched roof with almost 30º angle let’s neglect the wind loads.
Total load = 1.4Gk + 1.6Qk = 1.4 x 3.64 + 6 x 1.6 = 14.64KN.
Nodal loads (factored).
For analysis of the truss, loads are assumed to be applied on the node points of the truss
Total internal panel points = 3
Total external panel points = 2
Total pp = 5
Total loads = 15KN
total loads
Loads on the internal node points =
4
15
= = 3.75KN = 3.75KN
4
load oninternal node
Loads on the external node points =
2
3.75
= = 1.875KN
2
Consider the sketch bellow with un factored loads.
1.87Kn
3.75Kn C
3.75Kn H
3.75Kn F
1.87Kn D
A B
E G I
7.5Kn 7.5Kn
Hence
√
Z = d (0.5 + 0.25−
0.9
) = 0.97d < 0.95d
Z = 0.95d = 3411.04
As = M/ (0.87Fyz) = 18 x 106 / (0.87 x 460 x 331.8) = 131.9mm²
Hence provide 2T12 (226.2mm²) for both support and mid span.
DEFLECTION CHECK.
At mid span moments.
Msx = 18KNm
M/bd² = 18 x 106 /(230 x 359²) = 0.61
K = M / fubd² = 18x 106 / (25 x 230 x 359²) = 0.024
k
√
Z = d ( 0.5 + 0.25−
0.9
)
0.0243
√
Z = d ( 0.5 + 0.25−
Z = 0.95d = 341.05
0.9
) = 0.97d >0.95d
477−167.62
m.f.r = 0.55 + <= 2
120(0.9+0.61)
L 3600
dmin = = = 69mm
m. f . r 26 2 x 26
Hence
√
Z = d (0.5 + 0.25−
0.9
) = 0.93d < 0.95d
Z = 0.93d = 333.87
As = M/ (0.87Fyz) = 38.66 x 106 / (0.87 x 460 x 333.87) = 289.33.9mm²
Hence provide 3T12 (339.3mm²) for both support and mid span.
L 5300
dmin = = = 142mm
m. f . r 26 1.43 x 26
From condition 1 – 1
ß = 0.75
Le = Loß = 3750 x 0.75 = 2812.5
Slenderness ratio = Le/d = 10.85 < 15
Hence a column is a short braced column
LOAD CALCULATION
Roof beams load
load from Beam B5. = 58.63KN
load from Beam B6 = 59KN
bh ³ 300 x 300³
Ic = = = 675 x 106 mm 4
12 12
For beam B5
−W 1 L ² W 2 L ² −38.1 x 3.6² 38.1 x 3.58²
Then Mes = + = + = 0KNm
12 12 12 12
M = Mes x Ku/(K)
Ku = EI/3.65 KL = EI/3.75 Kb1 = 0.5EI/3.6 Kb2= 0.5EI/3.585
KL/(K) = 0.33
Mx-x = Mes x Ku/(K) = 0
bh ³ 300 x 300³
Ic = = = 675 x 106 mm 4
12 12
For beam B6
W 1 L ² W 2 L ² −43.2 x 3² 43.2 x 4.4²
Then Mes = + = + = 37.3KNm
12 12 12 12
M = Mes x Ku/(K)
Ku = EI/3.65 , KL = EI/3.75 , Kb1 = 0.5EI/4.4 , Kb2= 0.5EI/3
KL/(K) = 0.25
My-y = Mes x Ku/(K) = 37.3 x 0.25 = 9.325KNm
TIES
Minimum tie diameter = ¼ x 16 = 4mm
Maximum spacing = 12 x 16 = 192mm
Hence provide T8 at 175c/c.
Base thickness
Assume the depth of the footing = 450mm on the blinding layer of concrete.
M 40.82 x 106
K= = = 0.0045 << 0.156
Fcubd ² 40 x 1500 x 386²
Hence the section is singly reinforced.
k
√
Z = d (0.5 + 0.25−
0.9
)
0.0045
Hence
√
Z = d (0.5 + 0.25−
0.9
) = 0.99d > 0.95d
Bottom steel
Provide T16 –
Z = 0.95d = 366.7 200c/c, in both
As = M/ (0.87Fyz) = 40 x 106 / (0.87 x 460 x 366.7) = 272.66mm² directions.
Hence As = 181.77mm²/m
Provide T16 - 200c/c, (1005mm²)
Minimum percentage area of steel = 0.13%
100 x 1005
% provided = =0.22 % .............OK
1000 x 450
Hence provide T16 – 200c/c (1005mm² ), spanning in both directions
Maximum spacing
Spacing 3 x d = (3 x 386 ) = 1158mm
Or < 750mm
100 x 1005
=0.22 % <3 % Spacing is adequate.
1000 x 450
Check the shear stress on a perimeter 1.5d from the column face
Critical perimeter = (column perimeter) + ( 8 x 1.5d )
= (4 x 300) + ( 8 x 1.5 x 386) = 5832mm
Area within the critical perimeter.
= ( 300 + 3d )²
= ( 300 + ( 3 x 386))² = 2.1 x 106 mm²
Shear force outside the critical area. = [ 151.2 x (1.5² - 2.1)] = 22.7KN
V 22.7 x 10³
Shear stress v = = =0.01 N /mm ²
ud 5832 x 386
Hence V < Vc then no shear reinforcement required.
Cracking check.
The bar spacing does not exceed 750mm and the reinforcement is less than 0.3%
No further check is required.
STAIRCASE DESIGN.
CALCULATIONS RESULTS
Then from the stair layout plan we have got 13 rises and 12 goings with total of 13
steps per flight.
Giving out the following values
G = 250mm
R = 160mm
Hence satisfying the comfort rule of 2R + G = 570 - 630
Of which I have got 2R + G = 570mm, hence okay
The angle of the flight = 30º which is less than 38º
Span = 1200 + 3000 + 1200 = 5400mm
Loading.
Stair loading.
Waist, self-weight = 0.175 x 24 x ( 1/cosß), ß = 30º
Where by ß is the angle made by stairs to the horizontal.
Weight = 4.8 KN/m²
Steps weight. = 0.5 x 0.15 x 24 = 1.8 KN/m²
Finishes = 1.5 KN/m²
Total dead load. = 8.1 KN/m²
Imposed loads = 3 KN/m²
Landing loading.
For h = 150
Self-weight = 0.15 x 24 = 3.6 KN/m²
Finishes = 1.5 KN/m²
Total dead load = 5.1 KN/m²
Imposed load = 3 KN/m²
Total load = 1.4Gk + 1.6Qk
= 1.4 x 5.1 + 1.6 x 3
= 11.94 KN/m².
Load analysis for reactions and bending moments.
By considering the loads calculated above are uniformly distributed then we have the
figure bellow.
From the F.B.D above, Ray = Rby = (11.94 x 1.2 + 16.14 x 3 + 11.94 x 1.2)/2
Hence Reactions are equal to = 38.54KN
Shear forces on the landing are = 38.54KN
Shear forces on the stair waist are = 38.54KN – ( 11.94 x 1.2) = 24.2 KN
Bending moments at mid span.
M = 38.54 x 2.7 – 14.3 x 2.1 – 24.21 x 0.75 = 55.87 KNm
Bending moments at landing ( at 1.2m from either sides)
M = 38.54 x 1.2 – 14.3 x 0.6 = 37.67KNm
Lx 3000
dmin = = = 108.85mm
m. f . r 26 1.06 x 26
37.67 x 106
M / bd² = ² = 2.66
1000 x 119
M 37.67 x 106
K= = = 0.11
fcubd ² 25 x 1000 x 119 ²
Provide
k
M
√
Z = d ( 0.5 + 0.25−
0.9
) = 0.86d = 102.34, where d = 119mm
37.67 x 106
T16-160c/c
And
As = = = 919.76mm² T16-180c/c
0.87 Fy Z 0.87 x 460 x 102.34 For both waist
Provide T16 – 180 c/c ( 1117 mm² ) and landing
respectivelly
5 fy Areq 5 x 460 x 919.76
Fs = = = 236.73
8 Aprov 8 x 1117
T12-220c/c
477−236.73 As distribution
m.f.r = 0.55 + = 1.11
120(0.9+2.66) bars.
Lx 1200
dmin = = = 54.1 mm < 119mm okay
m. f . r 20 1.11 x 20
design of reinforcement
100 As
For landing. . = 0.13%
bd
0.13 x 1000 x 150
As = = 195mm²
100
Hence provide T12 – 220 c/c (565 mm²)
SHEAR CHECK.
For landing.
Shear force is u = 38.54KN
u 38.54 x 103
Hence shear stress V = = = 0.26 N/mm²
bd 1000 x 150