Design the house (slab, drop beam, tie beams and wall foundations) for the
attached drawings based on the following given data:

❖ The house consists of two stories, height of each story = 3.4m.


❖ Preliminary thickness of slab is 150mm.
❖ Size of drop beam, width = width of wall and height =
thickness of slab + 20cm.
❖ Size of tie beams above openings, width of wall x 40cm.
❖ Superimposed dead load and live load given in the attached
table.
❖ Use fc` = 28 MPa and fy = 420 MPa for all types of
reinforcement.
❖ Use clear cover of 20 mm for slab and 40 mm for beams and
foundations.
❖ Use steel bars 10 or 12mm for slab, 12 or 16mm for beams and
10, 12,16 for foundation.
❖ Live load = 1.5 kN/ m2 SIDL = 3.5 kN /m2
❖ DESIGN OF SLAB

❖ We take the max


panel (6.19 * 5.55)
m

𝑓𝑦
ln(0.8 1400)
Tmin = Ln = 5.25 m
36+9𝛽

Ln = 5.88
5.88
β= = 1.12
5.25

Use T 150 mm.

Wu = 10.92 kN / m2

∑W⸹ = ∑Mo


∑W⸹ = 10.92 (5.55 * 2.775 * 0.5 * 2 ) +
3
2.775∗2.775 ⸹
10.92 ( *4 * ) +
2 3

10.92 (0.64* 2.775 * 2 ) = 131.52 ⸹
2

∑Mo = M * θ * Length of line support

Assume Mneg = 2Mpos

⸹ ⸹
∑Mo = (Mneg. + Mpos. ) * { ( * 2 * 5.55 ) + ( * 2 * 6.19 )}
2.775 2.775

∑Mo = 25.38 Mpos ⸹

25.38 Mpos ⸹ = 131.52 ⸹

Mpos = 5.18 kN.m/m, Mneg = 10. 36kN.m/m

10
d = 150 – 20 - = 125 mm
2
𝑓𝑦 420
m= = = 23.53
0.85 𝑓′𝑐 0.85∗21

𝑀𝑢 10.36∗10^6
R= = = 0.737
0.9 𝑏 𝑑^2 0.9∗1000∗125^2

1 2∗𝑚∗𝑅 1 2∗23.53∗0.737
ϼ= (1- √1 − √ )= (1- √1 − √ ) = 0.00179
𝑚 𝑓𝑦 23.53 420

As = ϼbd = 0.00179 * 1000 * 125 = 223.75 mm2 / m


Asmin = 0.0018 bt = 0.0018 * 1000 * 150 = 270 mm2 / m
Use 270 mm2 / m

71000
Spacing = = 265 use 250mm
270

For Mpos and Mneg:


Ø10 /250 mm

71000
As provided = = 284 mm2 / m
250

❖ Design of drop beam above walls:

1.4 1.4 0.25√𝑓′𝑐


ρmin = 𝑓𝑦 = 420 = 0.0033 > 𝑓𝑦
= 0.00315

H = 200 + 150 = 350 mm


d = 350 – 10 – 40 – 12 = 294 mm

Asmin = ρbd = 0.0033 * 294 * 300 = 294 mm2/m

*
294
Using ø 12 = = 2.6 use 3 ø 12 cont. at top and bottom
113

AS provided = 3 * 113 = 339 mm2 / m


300−80−20−36 𝟒
Check spacing = = 82 mm > 1.5db, dagg ok
2 𝟑

❖ Design Stirrups:

using ø 10, Av = 71 mm2


𝐴𝑣 𝑓𝑦 71∗420
- Smax = = = 606mm say 600mm
0.062 √𝑓′ 𝑐𝑏𝑤 0.062∗ √28∗300
𝐴𝑣𝑓𝑦 71∗420
- Smax = = = 568mm say 550mm
0.35∗𝑏𝑤 0.35∗300
𝑑 320
- Smax = = = 150 mm
2 2

Use 10 ø 150 mm center to center

❖ Design of tie beams

10.92(2.526)
Load from slab = =7.2 kN/m
3.83
Weight of drop beam = 0.3*0.2*24=1.44 kN/m
Self-weight of wall above tie beam =0.8*0.3*18 =4.32 kN/m
Self-weight of tie beam = 0.3*0.4*24=2.88 kN/m
Total load =1.44+4.32+2.88=8.64 kN/m
Factored load=1.2*8.64=10.37 kN/m
Total=10.37+7.2=17.57
1
Moment = *wu*ln = 37.46 kN.m
8
d=400-40-10-8=342
Asmin=0.00333*300*342=342
420 37.46∗106
M= =23.53, R= = 1.186 ,𝜌 = 0.002925 < 0.0033
0.85∗21 0.9∗300∗342
Use Asmin
Use 2 Ø16 continuous at top and bottom

❖ Design of Foundation
Assume DPC, Depth=10cm, Width=30cm
qall=200 KPa
6.19+0.64
Load from slab = (10.92( × 2.775) + 10.92(0.5 × (0.25 +
2
5.45) ∗ 2.6)/6.19 =29.8 KN/m
29.8×2=59.6KN/m
S.W of drop beam= 0.2×0.3×24=1.44
1.44×2=2.88 KN/m
Weight of wall =3×0.3×18=16.2 KN/m
16.2×2=32.4 KN/m
Weight of DPC=0.1×0.3×23=0.69 KN/m
Weight of block below DPC= 0.2×0.3×18=1.08 KN/m
Weight of Block= 0.6×0.3×18=3.24 KN/m
Weight of foundation= 0.6×0.3×24= 4.32 KN/m
Total weight= 4.32+3.24+2.2+0.69+32.4+2.88= 45 KN/m
Wufactored=45*1.2+59.6=113.6 kN/m
113.6
Wuservice= = 84.15
1.35
84.15
B= =0.42m say 0.6m
200
84.15
qapplied/1m = =140.25KPa<200kPa
0.6∗1
assume height of foundation =0.3m
600 300 1
critical section = − ∗ = 225𝑚𝑚
2 2 2
225
moment=140.25*1*225∗ =3. 55kN.m/m
2
d=300-40-10-6=244mm
M=23.53, R=0.066, ρ=0.000157
As =0.000157*1000*244=39mm2/m
Asmin=0.0018*1000*300=540mm2/m (main reinforcements)
11300
S= =209 .25mm say 200mm
540

Ø12 /200mm
For secondary reinforcement
𝜌𝑚𝑖𝑛 = 0.0033
As =0.00333*600*300=5.31 say 6 Ø12
Use 3 Ø12mm top and bottom
Check for shear Øvc>vu .OK

❖ Design of stairs
L=√3.62 + 2.962 =4.66
1
Mneg =10.92*4.662* =19.76 kN.m/m
12
1
Mpos=10.92*4.662* =9.88 kN.m/m
24
Asmin =0.0018*1000*150=270mm2/m
Using Ø10mm then d=125mm
Negative:
Mneg=19.76
M=23.53
R=1.405
Ρ=0.00349
As=437mm2/m
71000
Spacing = =162 take 150 mm
437
Use Ø10mm/150mm@ top

Positive:
Mpos=9.88
M=23.53
R=0.7
Ρ=0.0017
As=213mm2/m
Spacing =71000/270 =262 say 250mm