Sap id : 70110394
Section : B’
394 kg
L.L = 300 + = 300.394 2
1000 m
f y=280 Mpa
f 394
c=18+ =18.394 Mpa
1000
Solution;
l 114
h min¿ = ≅ 90 mm
12.5 12.5
h min¿ 125 mm cleaver cover = 25mm
d=h−c . c
d=125−25=100 mm
0.125
l=clear spain+h=1+ =1.07 m
2
125 kg
R.C slab = ×2400=300 2
1000 m
75 kg
Brick ballast = ×18 00=135 2
1000 m
60 kg
P.C.C = ×2 3 00=138 2
1000 m
kg
Total dead load = 573
m2
kg
Lived load = 300.394 2
m
Factor slab load = 1.2 ( D . L ) +1.6(L . L)
9.81
¿ [ 1.2 (573 )+1.6 ( 300.394 ) ]
1000
kN
q U =11.46
m
1.2 Factor load of wall ;
250 9.81
pU =1.2 × × 1m ×1 m×1920 ×
1000 1000
kN
pU =5.65
m
1.3 Factor bending moment ;
1 2 2
M U = q U l + pU l
2
¿ 12.6 kN m
Assuming
d 100
a= = =16.66 mm
6 6
Mu
As=
a
∅ f y (d− )
2
12.5 ×106
A s= =545.43 mm2
16.66
0.9× 280(100− )
2
545.43× 280
a= =9.768 mm
0.85 (18.394 ) × 1000
12.5 ×106 2
A s= =525.42 mm
(
0.9× 280 100−
9.76
2 )
5 25.42×280
a= =9.40 mm
0.85 (18.394 ) × 1000
12.5 ×106 2
A s= =52 4. 6 5 mm
(
0.9× 280 100−
9. 40
2 )
1.5 Diameter and spacing :
679
Steel available = =339.5 mm2
2
Steel required = 524.65−339.5 ≅185 m m 2
¿ 6 @17 0 mm
2 ( 125 )=250 c /c ok